Buyer profile
Guy's and St Thomas' NHS Foundation Trust
Get alerts when Guy's and St Thomas' NHS Foundation Trust publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
226
Known spend
£32bn
173 disclosed
Average value
£185m
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
OXFORD NANOPORE TECHNOLOGIES PLC
£14m
- 2
EVOLUTION RECRUITMENT SOLUTIONS LTD
£1bn
- 3
VE3 GLOBAL LTD
£1bn
- 4
Golden Thread Fire Delay Ltd
2 winslatest 13 Jul 2026£1m
- 5
Woodnut Construction & Developments
2 winslatest 21 Apr 2026£671,890
- 6
Storm Building Limited
2 winslatest 04 Aug 2026£586,000
- 7
Equiax Limited
2 winslatest 13 Apr 2026£552,255
- 8
DRLC LTD
2 winslatest 01 Sept 2026£438,750
- 9
CFES-Ltd
2 winslatest 12 Mar 2026£300,296
- 10
Power Electrics
2 winslatest 05 May 2026£200,000
What they buy
By CPV categoryMedical equipment & pharmaCPV 33
14 contracts · £1bn
Business servicesCPV 79
10 contracts · £6bn
Health & social workCPV 85
9 contracts · £32m
Architectural & engineeringCPV 71
7 contracts · £2bn
Construction worksCPV 45
6 contracts · £7m
Industrial machineryCPV 42
5 contracts · £150,000
SoftwareCPV 48
4 contracts · £15m
Sewage, refuse & cleaningCPV 90
4 contracts · £299,376
Tender activity
Notices published per month — last 24 months
All contracts (226)
Fire stopping refurbishment project
The project involves surveying both vertical and horizontal fire compartmentation lines and carrying out remedial works to address any identified breaches in accordance with the fi
Clinical artificial intelligence (CAI) framework
This Pre-Market Engagement (PME) process is to allow the market the opportunity to assist, recommend and input into the development of NHS LPP’s new Clinical Artificial Intelligenc
Emergency department flow analysis STH
Patient flow analysis in the Emergency Department at St Thomas' Hospital.
GSTT LV switch panel replacements at bowley close & nuffield house project
The works involve replacing the existing aged LV switch panels at Bowley Close and Nuffield House, including phased removal of old equipment and installation of new LV switchboards
Fire damper panels
The works comprise the upgrade of the existing fire dampers serving the link blocks within the Tower Wing at Guy’s Hospital. The current installation consists of relatively new Act
GSTT - cardiologic 3mensio cardiac imaging software licences
Purchase of 3mensio Cardiac Imaging and Structural Heart Planning Software Licences with Associated Support and Upgrade from Cardiologic Ltd from Edward Value Add Pot.
Linac room refurbishment
The Trust has a requirement for a new a medical linear accelerator (LINAC) as part of the Large Medical Equipment Replacement Programme and enabling works are required.
GSTT nuffield house 8 x wet rooms
Conversion of bathrooms to wetrooms, works include, new flooring, new panels/cubicles, new lighting, drainage and new ceilings.
Provision of x-ray tube for CT scanner
replacement of a broken x-ray tube in the CT scanner at Queen Mary’s Cancer Centre
Environment monitoring system for st thomas' lower ground floor
The Environment Monitoring system is required to continuously monitor and log production and support rooms’ temperatures, humidity, room pressures and particle counts in the facili
Fire escape refurbishment (RBH)
Fire escape and staircase works at Dudmaston Mews, Dove Street, and Cale Street, at the Royal Brompton Hospital.
Borough wing theatres 1-2 enhanced minor works & maintenance
The Client wishes to appoint the Contractor to carry out main construction works in accordance with the scope and programme of the GSTT Theatre 1 and 2 enhanced minor works and mai
Gsst-gosh dairy tender
CONTRACT FOR THE SUPPLY AND DISTRIBUTION OF DAIRY PRODUCTS TO GUY’S AND ST THOMAS FOUNDATION TRUST (GSTT) AND GREAT ORMOND STREET HOSPITAL FOR CHILDREN (GOSH)
Private cath lab refurbishment - main contractor
This Authority is proposing converting underused space at the Royal Brompton Hospital into a modern, fully equipped Electrophysiology (EP) Cardiac Catheterisation Laboratory dedica
Respiratory metagenomics expansion programme
GSTT will lead the development of a national clinical metagenomics pilot service by deploying NHS developed laboratory, bioinformatic and clinical protocols along with Oxford Nanop
Fire protective walling north-wing generator STH
The supplier must have proven experience of installing Dura Steel walling in a healthcare (or similar) environment and operating in a live hospital environment. The location of the
Purchase of miraq cardiac system, harefield hospital
Replacement of the MiraQ Cardiac System, along with the associated probes and software, at Harefield Hospital Theatre Services
Procurement of multinuclear MRI upgrade and 31P coil — cima.x RBH
Charitable capital funding has been awarded by Royal Brompton & Harefield Hospitals Charity to support the upgrade of the Siemens MAGNETOM Cima.X MRI system, through the procuremen
Purchase of medical gas pendant service agreement for NICU, PICU, ICU, endoscopy
Purchase of Medical Gas Pendant Service Agreement for NICU, PICU, ICU, Endoscopy and RBH Theatre Services
Private patient strategy review
Strategic market growth consultancy to review Guy’s and St Thomas’ NHS Foundation Trust's private patient strategy to transform its private patient operating model.