Buyer profile
BUCKINGHAMSHIRE HEALTHCARE NHS TRUST
Get alerts when BUCKINGHAMSHIRE HEALTHCARE NHS TRUST publishes a new tender — 7-day free trial, then £4.99/month.
Total contracts
131
Known spend
£72m
121 disclosed
Average value
£592,318
Per contract
Active suppliers
10
Last 5 years
Top suppliers
Last 5 years- 1
Borras Construction Ltd
£883,989
- 2
MTX Contracts Ltd
£10m
- 3
Marcon Construction Limited
£2m
- 4
STOIC ROOFING AND CONSTRUCTION LIMITED
£1m
- 5
Logan Construction (South East ) Ltd
£783,090
- 6
IQVIA LTD.
3 winslatest 30 Jul 2026£169,774
- 7
Pyrotec Services Ltd
£115,590
- 8
ALL GAS SOLUTIONS BUCKS LIMITED
£186,862
- 9
Haemonetics Limited
2 winslatest 13 Nov 2025£72,650
- 10
Life Environmental
£2m
What they buy
By CPV categoryConstruction worksCPV 45
40 contracts · £21m
IT servicesCPV 72
13 contracts · £3m
Architectural & engineeringCPV 71
12 contracts · £1m
Repair & maintenanceCPV 50
8 contracts · £859,233
Business servicesCPV 79
4 contracts · £16m
Medical equipment & pharmaCPV 33
4 contracts · £3m
SoftwareCPV 48
4 contracts · £2m
Construction materialsCPV 44
4 contracts · £160,000
Tender activity
Notices published per month — last 24 months
All contracts (131)
Wycombe link bridge stage 2 main works
Repair works to the Wycombe Hospital Link Bridge urgent repair works to the link bridge at Wycombe General Hospital
St francis ward flooring work and decoration work
St Francis Ward Flooring and Decoration Work Supplier to install decorative flooring and carry out decoration work in St Francis Work at Stoke Mandeville Hospital
SMH temporary LV panel
Temporary LV Panel at Stoke Mandeville Hospital Installation of a temporary Low Voltage (LV Panel) to support the electrical infrastructure works at Building 69B at Stoke Mandevill
Clinical modelling activity for WHD
project clinical modelling for the Wycombe Hospital Development (Cardiac Stroke Receiving Unit, Cardiac Wards, Stroke Wards and Endoscopy unit data review)
Wycombe hospital water treatment stage 1
Pre-construction services Surveying, design, water testing, mechanical validation
Wycombe hospital water treatment construction stage 2
Water Treatment works at Wycombe Hospital Supply, installation of commissioning of water treatment systems into the existing Phase 1 plantroom, including associated builder's work
Construction cost management new build endoscopy RIBA 04 and 05
Cost management for new build at Wycombe Hospital construction consultancy services for the new clinical building development at Wycombe General Hospital
Paediatric audiology at wycombe hospital
Refurbishment of Ward 7 at Wycombe General Hospital into a purpose built Audiology Department Design and Construction work including strip out, remodelling and refurbishment of the
Network management and monitoring services
Network management and monitoring services for BHT
WGH link bridge stage 1 - concrete tapping
Concrete Tapping Survey for Link Bridge repairs concrete tapping survey to determine extent of required repairs to Link Bridge
Wycombe women's centre refurbishment
Reconfiguration and refurbishment of existing clinical accommodation Reconfiguration and refurbishment of the clinical areas in the Wycombe Women's Centre including alterations to
Post grad ventilation
Ventilation work at the Post Grad Building at Stoke Mandeville Hospital Ventilation installation work
Leapwork - automation testing A.I. software
Leapwork Agent, Leapwork Platform, Leapwork Studio, and Leapwork Support call of framework
AHU M&E
Design Stage (Stages 1-3) and Construction Stage (Stages 4-6) for 6 Air Handling Units and associated equipment and installations. Design Stage (Stages 1-3) and Construction Stage
Nurse call upgrades
Nurse Call Systems Upgrades To supply, install and commission Nurse Call systems in clinical spaces across the Trust
JHSU works
Building works in the John Hampden Support Unit
Clinical coding assistant software licences, hosting & support contract
CLINICAL CODING ASSISTANT SOFTWARE LICENCES, HOSTING & SUPPORT CONTRACT CALL OFF FRAMWORK CALL OF G CLOUD FRAMEWORK
VIE replacement works AT stoke mandeville hospital
VIE replacement works at SMH VIE replacement works at Stoke Mandeville Hospital
Healthcare analytics contract
Healthcare analytics financial software
CBRN decontamination unit enabling works at SMH
Installation of a Decontamination Unit. Installation and enabling work for a DC20(E) Decontamination Unit. Including all necessary work such as Electrical, Water Supply, installati