On the 24th June 2026, The Authority published an Intention to Award Notice following The Most Suitable Provider (MSP) Process as defined by the Provider Selection Regime of the He
The London Borough of Merton is running a Preliminary Market Engagement to find a Development/Investment Partner for two sites in the Morden Town Centre regeneration. It’s an early‑stage exercise to shape the later full procurement.
The council is hiring a coordinator to increase participation, representation and community engagement in the London Youth Games and the London Mini Marathon Championship for the borough, ensuring a safe and inclusive experience for young athletes and volunteers.
The Council is seeking to procure construction works for remedial works at West Wimbledon Primary School ARP - please refer to the McBains' tender pack for full details availa
Haslemere Primary School roof replacement works phase 2. All correspondence and submission of tenders regarding this opportunity must be done via the London Tenders Portal. Due to
Wimbledon Park Primary School needs a fire safety upgrade completed during the summer 2026 holidays (before 1st September 2026). This is a package of fire safety improvement works at a primary school in South London, and the contractor must be prepared to work outside normal hours if needed to finish on time.
Fire safety improvement package of works to be undertaken at Poplar Primary School in the London Borough of Merton, over the summer holidays 2026. Where deemed required by the Cont
Construction works for the fire door remedial works at West Wimbledon Primary School. Works will generally be undertaken over the summer holiday break 2026 in order to reduce impac
The London Borough of Merton ("the Authority") is seeking to appoint a suitably qualified pyrotechnic contractor to design, supply, deliver and safely fire large-scale pu
Below ground drainage repairs in relation to recent CCTV report in order to put the drainage system into good repair Programme length 3 weeks, to take place in August '26 Plea
Works involve installation of largely new weldmesh fencing to the KS2 playground and rear exits of Classrooms inc door access controls, in order to provide segregation. Programme l
Overlay of existing felt roofs with new high performance bitumen felt system inc overhaul of rainwater goods, removal/reinstatement of solar PV's and targeted internal repairs
Fire alarm replacement works to take place at Liberty Primary School during the school summer holiday (20th July to 31st August 2026). Please note all queries, correspondence and t
Water heater replacement works at Links Primary School. Programme 6 weeks to take place during school summer holiday period, 20th July to 1st September 2026 Please note all queries
Works involve felt overlay to several flat roofs where found to be in poor repair in order to address water ingress issues. Programme 6 weeks, late July to 2nd September '26.
Works comprise the strip up and renewal of roof system to isolated flat roofs at Perseid Upper School, Morden. The current sedum and single ply flat roofs have failed with various
Phase 2 works to the recently opened SEN School at Bedelsford Chaucer, Morden, in order to adapt the First Floor and isolated external works, over the summer holidays 2026, on beha
Works comprise the emergency roofing works to address historic water ingress issues at Acacia Centre, Mitcham. This largely includes overlaying the roof with a new plywood deck to
The London Borough of Merton is testing the market to find out which suppliers can provide an online payment system for residents and businesses to pay the council. This includes the software platform itself, setting it up, keeping it running, and providing customer support.
Remedial roof works to take place at Abbotsbury Primary School between 20th July and 21st August 2026. All tender enquiries, queries and submissions must be done via the London Ten