Wetted Failed Fuel Radiolysis Reference number: NNLC178
SellafieldEstimated Value
Not specified
Deadline
Not specified
Published
3 August 2020
Type
Not specified
Overview
NNL are currently contracted to carry out a series of trials to measure radiolytic gas generation. Because these measurements are to be made using irradiated material there are two significant constraints: • The quantity of material (predominantly a powder) used in each test must be minimised. • The samples and vessels must remain within a hot cell facility (see Appendix for details), therefore: o Sample lines between the text vessels and the measurement system located outside the hot cell will be long (~6-10 m). o Items in the hot cell will receive significant radiation doses and must be suitably radiation hardened. o All operations on equipment located in the hot cell (setup, operation, maintenance and dismantle) must be carried out remotely using master slave manipulators (see Appendix for examples). o Ambient temperature may vary in the range 5°C - 40°C during the year.
NNL has developed a preliminary concept for undertaking the required measurements, show in Figure 1 : Figure 1 Initial Sampling Concept Some relevant characteristics of the proposed system are: • Individual tests will be conducted on a few grams of irradiated material in high integrity vessels with a total volume of ~ 3 cm3 and a free volume of ~ 2 cm3. • Connecting pipework to be narrow-bore, high pressure piping (nominally 1.6 mm, 1/16" bore) • The gas generated, in the test and whose composition needs to be measured, will depend on the test material and may be composed of either: o Hydrogen and sub-stochiometric quantity of oxygen (the degree of sub-stoichiometry is currently unknown); o Roughly equal amounts of hydrogen, carbon dioxide, carbon monoxide and methane, with trace amounts of higher hydrocarbons. • Small quantities of Kr and He may be released from the test materials as a result of radioactive decay, and their presence would need to be accounted for. • The reference sampling process would involve: o Evacuating the manifold and isolating it. o Opening the valve for designated test vessel valve to equalize pressure with manifold following which the valve would be closed to leave a gas sample of around 50µL in the manifold. o Sweep the sample using a carrier gas to it to the measurement instrument. • An equilibrium is expected to form which will limit the overall pressure generated. It can be assumed that the experiment will be terminated if the pressure exceeds a value which is expected to be less than 50 BarG. • Tests will be conducted for a number of source materials and test conditions, leading to between 20 and 30 simultaneous tests.
Scoping calculations suggests that • gas will be generated at a rate of ~ 10-9 moles per day. • the pressure rise will be ~1.5 x 10-5 Bar.d-1 and • the concentration of each species will increase by o ~90 ppm per week of hydrogen, or o ~20 ppm per week each of hydrogen, methane etc. • The tests may last between 3 and 12 months Additional information: NNL are currently contracted to carry out a series of trials to measure radiolytic gas generation from materials associated with spent nuclear fuel. One of the specific technical objectives is to determine the change in gas composition with time.
Additional details
Following the supplier meeting NNL intends to hold a series of 1:1 meetings with individual suppliers, which will provide an opportunity to discuss possible measurement solutions in greater detail. Anyone who wishes to have such a meeting should submit a brief overview of their recommended measurement approach, which may differ for the concept provided above if an alternative measurement system is able to provide the required measurement capability.
The overview must demonstrate that the measurement system has a proven track record and can be deployed for undertaking measurements in a hot cell facility. Provided that NNL considers that the proposed scheme is viable, and the measurement system is reliable, a detailed meeting will be agreed.
The total number of 1:1 meetings will be capped at ten. In the event that more than 10 viable approaches are suggested then meeting slots will be allocated on a first come first served basis.
The dates and time slots for 1:1's are as follows: Thursday 20th August Friday 21st August 09:00 - 09:45 10:00 - 10:45 11:00 - 11:45 13:00 - 13:45 14:00 - 14:45 When providing your response, please indicate which date and time would be most convenient and we will try to accommodate. Please be aware that Matt McClure, the Procurement & CTM is on leave 31/07/2020 until 10/08/2020.
Dial in details will be sent and any questions will be answered on return. NNL considers that the measurement of gas composition at intervals during the test is challenging and that the gas sampling and measurement techniques required are outside of its area of expertise. NNL is therefore requesting assistance from suppliers to help identify credible means of making the proposed measurements in order to enable NNL to define a specification for a subsequent open procurement process to provide a suitable measurement system.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
SellafieldKey Dates
Published
3 August 2020
Submission deadline
Not specified
Notice type
planning
Source
contracts finder
Related Tenders
Rolleston primary school roof repair
Leicester City Council invites tenders for works comprising of the removal of four roofs, and the overlay, supply and installation of a roof waterproofing system for the four roofs
S1306 – alcoholic and non-alcoholic drinks (market engagement)
Salford City Council (the “Council”) is seeking early engagement with suppliers to help inform and shape a future tender. This market engagement is not a call for competition; inst
Provision of support and advocacy services for those at risk, victims and survivors of CSE
Oldham Council is seeking to commission a specialist support and advocacy service for children, young people and adults who are at risk of, have experienced, or are survivors of Ch
TC01467 - the provision of temporary workers to provide port services - london thamesport
The Purchaser requires the provision of Temporary Workers to undertake tasks that will involve manual handling activities relating to the loading and discharging of general cargo o