GRIP 5-8 Delivery of Coventry South, Northampton CET and Tyseley Fuel Road 12
WM TRAINS LIMITEDEstimated Value
Not specified
Deadline
2 October 2026
Published
7 September 2026
Type
Not specified
Overview
WM Trains Limited is procuring rail depot and servicing works through one advertised works procurement structured in two contractual stages. Stage 1: PCSA Under the Pre-Construction Services Agreement (PCSA), the contractor will complete the GRIP 5 design, further develop the design, and price the individual works packages.
Stage 2: ECC Once those package prices have been developed and consolidated into a single commercial position, the project will proceed to award the NEC4 Engineering and Construction Contract (ECC) on a lump-sum basis for GRIP stages 6 - 8. The procurement is intended to appoint a contractor for each Lot to provide Stage 1 PCSA services.
Stage 2 may follow, subject to the contracting authority's decision, funding, approvals and procurement compliance requirements. The contracting authority does not commit by this notice to award Stage 2.
Lots (1)
- Lot 1Coventry Carriage Sidings Stabling and Servicing Facility Lot 2 - Northampton Riverside CET Lot 3 - Tyseley Road 12 Permanent Fuelling Apron Tenders may be submitted for one, more than one, or all Lots, subject to the instructions in the associated procurement documents available at https://www
Additional details
Please note that it may not be necessary for the successful bidder for each Lot at Stage 1 to undertake all of the GRIP 5 design required for that particular Lot as some elements of the GRIP 5 design may already have been completed by tender award stage. If that is the case, it would be expected that the successful bidder would inherit any GRIP 5 design already completed for a particular Lot and then use that to inform the remainder of the GRIP 5 design required for that particular Lot.
For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Birmingham:... To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/EHTJX59C3V Please note that the contract start and end dates given for each Lot are provisional and are to be agreed following submission of programmes at the ITN stage. The dates are purely draft and are a guide only ahead of the procurement commencing and may be considerably longer than stated.
The start date for each Lot may vary dependent on the availability of GRIP 4 design and not all contracts may be awarded at the same time and not all ITN's issued at the same time following shortlisting at the PSQ stage. Coventry Carriage Sidings are located immediately south of Coventry Station adjacent to the Leamington Line and currently comprise four sidings with limited operational use.
The sidings are currently classified as Network Rail sidings and only Roads 3 and 4 are presently accessible due to track materials being stored on Roads 1 and 2. Live OHLE infrastructure is present at the entrance to the sidings and on the adjacent main line.
It is intended to develop the sidings into an operational stabling and light maintenance facility to support the Class 730 fleet and future operational requirements associated with the Coventry and Snow Hill routes. The project shall provide overnight stabling capacity for up to ten 3-car Class 730 units together with servicing infrastructure including CET, tanking, cleaning, walking routes, welfare facilities, lighting, security, electrical infrastructure and operational safety systems.
The development is expected to require significant civils, track, M&E, drainage, OHLE, operational safety and depot infrastructure works. The proposed changes are also expected to require the sidings to be reclassified as a Light Maintenance Depot, subject to Network Rail approvals.
The project will also improve operational access to the sidings through reinstatement of the disused walking route from Platform 4 and associated access, security and lighting upgrades. The Train Presentation Team currently undertake the evacuation of Controlled Emission Toilets and tanking on the 4-car Class 350 units using mobile bowser units whilst trains are dwelling at Northampton Station on Platforms 1, 2 and 3.
These mobile units are then discharged by connecting to a discharge point located near the south end of bay platform 4 or the north end of platform 2. Whilst these facilities are suitable for CET maintenance activities on the Class 350 units, they are not suitable for evacuating the CET on the new Class 730 units as the connection points are located below the sole bar and cannot be accessed from the platform.
This project scope is to provide the facilities required by the Train Presentation Team to undertake both CET and train servicing activities and for drivers to safely access and egress the trains when stabled in Northampton Riverside Sidings A and B. To support these activities, WM Trains have created a Light Maintenance Depot at Northampton within which the following activities will be undertaken overnight on the Class 730 trains stabled in the river sidings: CET extraction, flushing and tanking waste removal internal cleaning topping up of screen wash pre-train operation inspections front end cleaning, where required topping up of train sand boxes, where required
WM Trains currently operates fuelling and train servicing activities at Tyseley Train Maintenance Depot, Birmingham using existing permanent fuelling roads 13, 14 and 15. Following operational changes associated with fleet deployment, revised timetable requirements and depot operational constraints, the temporary fuelling arrangements installed on Road 12 during previous fuelling enhancement works have become operationally critical.
The project will provide a permanent embedded track fuel apron and associated servicing infrastructure on Road 12 to replace the temporary arrangements. The proposed project will provide a permanent embedded track fuel apron, associated below ground drainage and interceptor systems, fuelling and servicing facilities, canopy structures, depot protection interfaces, lighting, CCTV, M&E infrastructure and associated operational facilities. The project shall support the safe and efficient servicing of up to 6-vehicle formations without splitting or shunting and shall be designed to accommodate current and future operational requirements.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
HALO TECHNOLOGIES EUROPE LIMITED
£1m
total awarded
- 2
CMAC GROUP UK LIMITED
£2m
total awarded
- 3
WABTEC UK LIMITED
£618,950
total awarded
- 4
Canyon Road Limited
1 contract wonlatest 17 Mar 2026£151,200
total awarded
HALO TECHNOLOGIES EUROPE LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
WM TRAINS LIMITEDKey Dates
Published
7 September 2026
Submission deadline
2 October 2026
Notice type
tender
Source
find a tender
Related Tenders
The friary multi-storey car park refurbishment
Lichfield District Council has a requirement for repairs to an existing multi storey parking facility and incorporates works to the fire protection of the existing steelwork; elect
University hospitals birmingham data cabling and passive infrastructure services
The Authority is seeking to appoint a Supplier to provide maintenance, support, supply, break/fix and relocation services for its IT and Estates passive cabling infrastructure, inc
Bereavement counselling
This is a Provider Selection Regime (PSR) intention to award notice. The awarding of this contract is subject to the Health Care Services (Provider Selection Regime) Regulations 20
Provision of a mental health crisis cafe and counselling
This is a Provider Selection Regime (PSR) intention to award notice. The awarding of this contract is subject to the Health Care Services (Provider Selection Regime) Regulations 20