Estimated Value
Not specified
Deadline
Not specified
Published
28 July 2026
Type
goods
Overview
Team Leidos are proud to be delivering the logistics commodities and services transformation (LCS(T)) Delivery partner contracts (LCS (T)/0001 dated 16.4.2015) on behalf of the UK Ministry of Defence (the ‘Prime Contract’). Delivery of other parts of the LCS(T) contract are delivered by Leidos Europe Ltd (LEL) and other partners (together ‘Team Leidos’).
This requirement is subject to the Public Procurement Regulations and respective advertising action. Please note this is a Voluntary Transparency Notice, this contract has not been awarded yet.
Following the recently advertised tender process (2023/S 000-016058), run under the Open Procedure of the Public Contract Regulations 2015 (PCR15), Leidos has concluded that no suitable bids have been received. Two bids were received, both of which fail to meet our minimum requirements.
Regulations cited
- Public Contract Regulations 2015
Additional details
Of the two bids, only one can provide the full range of items required. Leidos have therefore decided to utilise Regulation 32 (2) (a) of PCR15, and plan to migrate this tender process to the Negotiated without Prior Publication Procedure.
Leidos intends to negotiate with the one bidder that can provide all items with the aim of addressing the areas of non-compliance, and concluding a contract. If this process fails, a new competitive tender under the Open Procedure will commence and be advertised in the usual manner.
This contract was originally tendered under PCR2015 using the Open Procedure in late 2023 for a 4-year contract (Jan 2024 – Dec 2027). The advertised awarded contract value was £10M.
It was one of 3 gas contracts awarded to BOC Limited by Leidos following 3 failed competitions. The current contract (“the Industrial Gases Contract”) is due to end on 31st December 2027.
The other two contracts awarded to BOC were: (i) The Supply of Medical Gases (“the Medical Gases Contract”) also under PCR, currently due to end also on 31st December 2027, and (ii) the contract for the Supply & Support of Refrigerant Gases, Bulk and Cryospeed Gases & Associated Equipment (“the Refrigerant Gases Contract”) under DSPCR, which is due to end on 31st December 2030. Leidos now intends to extend both the Industrial Gases Contract and the Medical Gases Contract for 3 years to make their end dates coterminous with the Refrigerant Gases Contract in 2030 thereby enabling all three to be re-aggregated and let together in the future.
Having attempted (unsuccessfully) to disaggregate the three requirements previously in the hope of generating more competition it is now felt that there is more logic in enabling a more consolidated, cost-effective and cohesive single gases tender approach. The proposed strategy allows time for further developments in the gases supply markets that could prevent a repeat of the failed tenders at the end of 2023.
This new approach also eliminates the significant inconvenience and substantial duplication of costs for the contracting authority of running three tenders rather than a single consolidated one. To facilitate the proposed contract extension, it is proposed to modify the value of the Framework Contract originally awarded to BOC ( original value £10m) to £14.85m on the basis that the provisions of PCR Regulation 72 (Modification of Contracts during their term): 72 (1) (b): apply- i.e.: “ …Contracts and framework agreements may be modified without a new procurement procedure ….. for additional works services or supplies by the original contractor that have become necessary and were not included in the initial procurement where a change of contractor: (i) cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the original procurement and (ii) would cause significant inconvenience or substantial duplication of costs for the contracting authority ..provided that any increase in price does not exceed 50% of the value of the original contract.
Future demand under the extended contract is difficult to determine accurately. Call offs under the extended framework will be monitored and, if it is anticipated that the revised framework value might be exceeded a further VEAT will be published.
This contract was originally tendered under PCR2015 using the Open Procedure in late 2023 for a 4-year contract (Jan 2024 – Dec 2027). The advertised awarded contract value was £10M.
It was one of 3 gas contracts awarded to BOC Limited by Leidos following 3 failed competitions. The current contract (“the Industrial Gases Contract”) is due to end on 31st December 2027.
The other two contracts awarded to BOC were: (i) The Supply of Medical Gases (“the Medical Gases Contract”) also under PCR, currently due to end also on 31st December 2027, and (ii) the contract for the Supply & Support of Refrigerant Gases, Bulk and Cryospeed Gases & Associated Equipment (“the Refrigerant Gases Contract”) under DSPCR, which is due to end on 31st December 2030. Leidos now intends to extend both the Industrial Gases Contract and the Medical Gases Contract for 3 years to make their end dates coterminous with the Refrigerant Gases Contract in 2030 thereby enabling all three to be re-aggregated and let together in the future.
Having attempted (unsuccessfully) to disaggregate the three requirements previously in the hope of generating more competition it is now felt that there is more logic in enabling a more consolidated, cost-effective and cohesive single gases tender approach. The proposed strategy allows time for further developments in the gases supply markets that could prevent a repeat of the failed tenders at the end of 2023.
This new approach also eliminates the significant inconvenience and substantial duplication of costs for the contracting authority of running three tenders rather than a single consolidated one. To facilitate the proposed contract extension, it is proposed to modify the value of the Framework Contract originally awarded to BOC ( original value £10m) to £14.85m on the basis that the provisions of PCR Regulation 72 (Modification of Contracts during their term): 72 (1) (b): apply- i.e.: “ …Contracts and framework agreements may be modified without a new procurement procedure ….. for additional works services or supplies by the original contractor that have become necessary and were not included in the initial procurement where a change of contractor: (i) cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the original procurement and (ii) would cause significant inconvenience or substantial duplication of costs for the contracting authority ..provided that any increase in price does not exceed 50% of the value of the original contract.
Future demand under the extended contract is difficult to determine accurately. Call offs under the extended framework will be monitored and, if it is anticipated that the revised framework value might be exceeded a further VEAT will be published.
This contract was originally tendered under PCR2015 using the Open Procedure in late 2023 for a 4-year contract (Jan 2024 – Dec 2027). The advertised awarded contract value was £10M.
It was one of 3 gas contracts awarded to BOC Limited by Leidos following 3 failed competitions. The current contract (“the Industrial Gases Contract”) is due to end on 31st December 2027.
The other two contracts awarded to BOC were: (i) The Supply of Medical Gases (“the Medical Gases Contract”) also under PCR, currently due to end also on 31st December 2027, and (ii) the contract for the Supply & Support of Refrigerant Gases, Bulk and Cryospeed Gases & Associated Equipment (“the Refrigerant Gases Contract”) under DSPCR, which is due to end on 31st December 2030. Leidos now intends to extend both the Industrial Gases Contract and the Medical Gases Contract for 3 years to make their end dates coterminous with the Refrigerant Gases Contract in 2030 thereby enabling all three to be re-aggregated and let together in the future.
Having attempted (unsuccessfully) to disaggregate the three requirements previously in the hope of generating more competition it is now felt that there is more logic in enabling a more consolidated, cost-effective and cohesive single gases tender approach. The proposed strategy allows time for further developments in the gases supply markets that could prevent a repeat of the failed tenders at the end of 2023.
This new approach also eliminates the significant inconvenience and substantial duplication of costs for the contracting authority of running three tenders rather than a single consolidated one. To facilitate the proposed contract extension, it is proposed to modify the value of the Framework Contract originally awarded to BOC ( original value £10m) to £14.85m on the basis that the provisions of PCR Regulation 72 (Modification of Contracts during their term): 72 (1) (b): apply- i.e.: “ …Contracts and framework agreements may be modified without a new procurement procedure ….. for additional works services or supplies by the original contractor that have become necessary and were not included in the initial procurement where a change of contractor: (i) cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the original procurement and (ii) would cause significant inconvenience or substantial duplication of costs for the contracting authority ..provided that any increase in price does not exceed 50% of the value of the original contract.
Future demand under the extended contract is difficult to determine accurately. Call offs under the extended framework will be monitored and, if it is anticipated that the revised framework value might be exceeded a further VEAT will be published.
This contract was originally tendered under PCR2015 using the Open Procedure in late 2023 for a 4-year contract (Jan 2024 – Dec 2027). The advertised awarded contract value was £10M.
It was one of 3 gas contracts awarded to BOC Limited by Leidos following 3 failed competitions. The current contract (“the Industrial Gases Contract”) is due to end on 31st December 2027.
The other two contracts awarded to BOC were: (i) The Supply of Medical Gases (“the Medical Gases Contract”) also under PCR, currently due to end also on 31st December 2027, and (ii) the contract for the Supply & Support of Refrigerant Gases, Bulk and Cryospeed Gases & Associated Equipment (“the Refrigerant Gases Contract”) under DSPCR, which is due to end on 31st December 2030. Leidos now intends to extend both the Industrial Gases Contract and the Medical Gases Contract for 3 years to make their end dates coterminous with the Refrigerant Gases Contract in 2030 thereby enabling all three to be re-aggregated and let together in the future.
Having attempted (unsuccessfully) to disaggregate the three requirements previously in the hope of generating more competition it is now felt that there is more logic in enabling a more consolidated, cost-effective and cohesive single gases tender approach. The proposed strategy allows time for further developments in the gases supply markets that could prevent a repeat of the failed tenders at the end of 2023.
This new approach also eliminates the significant inconvenience and substantial duplication of costs for the contracting authority of running three tenders rather than a single consolidated one. To facilitate the proposed contract extension, it is proposed to modify the value of the Framework Contract originally awarded to BOC ( original value £10m) to £14.85m on the basis that the provisions of PCR Regulation 72 (Modification of Contracts during their term): 72 (1) (b): apply- i.e.: “ …Contracts and framework agreements may be modified without a new procurement procedure ….. for additional works services or supplies by the original contractor that have become necessary and were not included in the initial procurement where a change of contractor: (i) cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the original procurement and (ii) would cause significant inconvenience or substantial duplication of costs for the contracting authority ..provided that any increase in price does not exceed 50% of the value of the original contract.
Future demand under the extended contract is difficult to determine accurately. Call offs under the extended framework will be monitored and, if it is anticipated that the revised framework value might be exceeded a further VEAT will be published.
This contract was originally tendered under PCR2015 using the Open Procedure in late 2023 for a 4-year contract (Jan 2024 – Dec 2027). The advertised awarded contract value was £10M.
It was one of 3 gas contracts awarded to BOC Limited by Leidos following 3 failed competitions. The current contract (“the Industrial Gases Contract”) is due to end on 31st December 2027.
The other two contracts awarded to BOC were: (i) The Supply of Medical Gases (“the Medical Gases Contract”) also under PCR, currently due to end also on 31st December 2027, and (ii) the contract for the Supply & Support of Refrigerant Gases, Bulk and Cryospeed Gases & Associated Equipment (“the Refrigerant Gases Contract”) under DSPCR, which is due to end on 31st December 2030. Leidos now intends to extend both the Industrial Gases Contract and the Medical Gases Contract for 3 years to make their end dates coterminous with the Refrigerant Gases Contract in 2030 thereby enabling all three to be re-aggregated and let together in the future.
Having attempted (unsuccessfully) to disaggregate the three requirements previously in the hope of generating more competition it is now felt that there is more logic in enabling a more consolidated, cost-effective and cohesive single gases tender approach. The proposed strategy allows time for further developments in the gases supply markets that could prevent a repeat of the failed tenders at the end of 2023.
This new approach also eliminates the significant inconvenience and substantial duplication of costs for the contracting authority of running three tenders rather than a single consolidated one. To facilitate the proposed contract extension, it is proposed to modify the value of the Framework Contract originally awarded to BOC ( original value £10m) to £14.85m on the basis that the provisions of PCR Regulation 72 (Modification of Contracts during their term): 72 (1) (b): apply- i.e.: “ …Contracts and framework agreements may be modified without a new procurement procedure ….. for additional works services or supplies by the original contractor that have become necessary and were not included in the initial procurement where a change of contractor: (i) cannot be made for economic or technical reasons such as requirements of interchangeability or interoperability with existing equipment, services or installations procured under the original procurement and (ii) would cause significant inconvenience or substantial duplication of costs for the contracting authority ..provided that any increase in price does not exceed 50% of the value of the original contract.
Future demand under the extended contract is difficult to determine accurately. Call offs under the extended framework will be monitored and, if it is anticipated that the revised framework value might be exceeded a further VEAT will be published.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Award Details
BOC Limited
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
BOC Limited
1 contract wonlatest 28 Jul 2026
BOC Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Actions
Sign up freeto open noticeA free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. No card, no fees.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Leidos Supply LimitedKey Dates
Published
28 July 2026
Submission deadline
Not specified
Renewal expected70% confident
September 2030
Predicted using explicit duration found in the tender description (48 months from publication date + 60 days (estimated) → renewal expected by Sep 2030).
Notice type
award
Source
find a tender
Related Contracts
Supply and installation of live events PA system for trinity market
Hull City Council (The Authority) is seeking tenders from interested organisations to supply and install a live events PA system for Trinity Market. The tender is an open procedure
Bangladesh carbon market governance & readiness sprint
The UK Government's Partnering for Accelerated Climate Transitions (UK PACT) programme is inviting proposals from qualified suppliers or consortia to deliver technical assista
Data transmission network (DTN) HS2
The HS2 Data Transmission Network (DTN) will provide network transport services and specific central service functions necessary for the reliable operation of trains on HS2. The DT
The supply of bespoke blank white access control legic smart cards
Unite Procurement UK Limited (part of Unite Holding SE), on behalf of the Ministry of Defence, is seeking suppliers to join the Unite Procurement Platform to support the supply of