The review of Westinghouse’s validation evidence for the effectiveness of the AP1000 passive reactor heat removal system

DEPARTMENT FOR WORK AND PENSIONS

Estimated Value

£73,744 – £0

Deadline

30 June 2015

Published

10 July 2015

Type

Not specified

VCSE SuitableGBNot applicableCPV: 73000000
CategoryResearch & development

Overview

1.1 In 2007, Westinghouse (WEC) submitted its AP1000 reactor design to ONR for a phased Generic Design Assessment (GDA). This culminated in 2011 with ONR publishing a suite of Step 4 technical assessment reports, an interim Design Acceptance Confirmation (iDAC) and the 51 outstanding GDA Issues which must be resolved before ONR will consider granting a “full” DAC.

On reaching this point, WEC paused its GDA related activities. In 2014, WEC requested to resume GDA to support the Moorside project. 1.2 In the event of a plant transient, the AP1000 is designed such that core decay heat removal is normally accomplished by the (active) startup feedwater system.

However, if that system is not available (for example, due to a loss of all ac electrical power), emergency core decay heat removal is provided by the Passive Residual Heat Removal (PRHR) heat exchanger. The PRHR heat exchanger is a C-tube heat exchanger connected, through inlet and outlet headers, to the reactor coolant system.

Submission

The extant safety documentation submitted to ONR during the initial GDA period (Ref 1, Section 15.2.6) made a claim that by these means, the PRHR heat exchanger, in conjunction with the passive containment cooling system, would be able to keep the reactor coolant subcooled indefinitely. 1.3 ONR fault studies inspectors investigated this claim during GDA Step 4 (Ref 2, notably section 4.2.3.3).

Additional details

The inlet to the heat exchanger is from the reactor coolant system hot leg, and the return is to the steam generator outlet plenum. The heat exchanger is located above the core to provide natural circulation flow when the reactor coolant pumps are not operating.

The In Containment Reactor Water Storage Tank (IRWST) provides the heat sink for the heat exchanger. After the IRWST water reaches saturation (in about two and half hours), steam starts to vent to the containment atmosphere.

The condensation that collects on the containment steel shell (cooled by the passive containment cooling system) returns to the IRWST, maintaining fluid level for the PRHR heat exchanger heat sink. They found that Ref 1 did not include a design basis assessment of the passive containment cooling system for such plant transients or a substantiation of the efficiency with which re-condensed water is collected and recycled back to the IRWST. As a result, amongst the 51 GDA Issues is GI-AP1000-FS-06 (Ref 3) which requires WEC to provide validation evidence showing that the IRWST is functionally capable of cooling the PRHR during intact circuit faults for 72 hours.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Contracts Finder

Visit
1

Open the original notice

Click the button below to view this tender on Contracts Finder

2

Find the submission method

Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)

3

Create an account

Register on the eSourcing platform for free — you'll need a company email and DUNS number

4

Download tender documents

Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates

5

Submit your response

Upload completed documents through the portal before the deadline — late bids are automatically rejected

Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.

Buyer Profile

Department For Work and Pensions
Typepublic body
RegionAny region
Total tenders56
Total spend£5,962,010,634
View buyer profile

Key Dates

Published

10 July 2015

Submission deadline

30 June 2015

Notice type

award

Source

contracts finder

Similar

Related Tenders