System operational · UK tenders
Awarded
4b32f845-a5f9-4897-841d-c0cdb484acc9 · award

Support for assessment of Hitachi-GE Human Based Safety

DEPARTMENT FOR WORK AND PENSIONS

Estimated Value

£84,612 – £0

Deadline

8 June 2015

Published

10 July 2015

Type

Not specified

VCSE SuitableGBOther -CPV: 73000000
CategoryResearch & development

Overview

1.1 In January 2014 ONR formally started Step 2 of the Generic Design Assessment (GDA) of Hitachi General Electric’s (Hitachi-GE) UK Advanced Boiling Water Reactor (UK ABWR). Hitachi-GE is the Requesting Party for the UK ABWR GDA (referred to as “the RP” in this specification). 1.2 Step 2 involved an overview of the acceptability, in accordance with the regulatory regime of Great Britain, of the design fundamentals, including review of key nuclear safety and nuclear security claims with the aim of identifying any fundamental safety or security shortfalls that could prevent the issue of a Design Acceptance Confirmation (DAC) (see http://www.onr.org.uk/new-reactors/ngn03.pdf). 1.3 During Step 2, ONR reviewed the key human-based safety claims (HBSC) or assertions put forward by the RP in the area of human factors (HF).

These claims require modern standards substantiation in the RP’s safety case in a logical structure of claims, arguments and evidence and in a manner that is proportionate to their risk. ONR’s technical assessment report for the HF assessment work done during Step 2 and key conclusions are published on ONR’s website (http://www.onr.org.uk/new-reactors/uk-abwr/reports.htm). 1.4 ONR commenced Step 3 of GDA on 1st September 2014 and expects to complete this stage at the end of August 2015.

GDA Step 4 is therefore intended to start on 1st September 2015 with completion scheduled for the end of 2017. 1.5 Substantiation of HBSC and the associated human reliability analysis is a key activity in the design of the new plant. It provides input and is informed by a number of cross-cutting areas such as: fault studies regarding the identification of claims and feasibility of any operator actions, verification of function allocation and input to the Probabilistic Safety Analysis (PSA) to enable a best-estimate risk to be evaluated, demonstrate whether a balanced design has been achieved, and to identify areas where the human-contribution to plant risk may be dominant and further reasonably practicable design improvements and re-allocation of function may be needed. 1.6 Hitachi-GE’s submissions to ONR that seek to provide the HBSC substantiation will be phased during Steps 3 and 4 of GDA and will provide increasing detail and evidence as the design and safety case develops and is finalised.

Additional details

During Steps 3 and 4 of GDA, ONR will undertake assessments of increasing detail, to confirm that the claims are supported by an adequate body of arguments (reasoning) and evidence. During Step 4 in particular, ONR will continue its assessment but with increased focus on the evidence, conducting in-depth reviews, on a sampling basis, of the RP’s HF substantiation and reliability analysis for the UK ABWR HBSC. The outcome of this is to confirm and have sufficient confidence that the HBSC are supported by cogent arguments that are underpinned by robust evidence.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Contracts Finder

Visit
1

Open the original notice

Click the button below to view this tender on Contracts Finder

2

Find the submission method

Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)

3

Create an account

Register on the eSourcing platform for free — you'll need a company email and DUNS number

4

Download tender documents

Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates

5

Submit your response

Upload completed documents through the portal before the deadline — late bids are automatically rejected

Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.

Buyer Profile

Department For Work and Pensions
Typepublic body
RegionAny region
Total tenders56
Total spend£5,962,010,634
View buyer profile

Key Dates

Published

10 July 2015

Submission deadline

8 June 2015

Notice type

award

Source

contracts finder

Similar

Related Tenders