Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler
Royal Berkshire Fire AuthorityEstimated Value
Up to £100,000
Deadline
Not specified
Published
11 March 2026
Type
Not specified
Full Description
Suppliers will be required to provide the following services in a cost-effective structure:
General Requirements
- The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations.
- Provision for leasing options, enabling RBFRS to forecast costs, maintain budget compliance, and upgrade or alter equipment in line with operational requirements.
- All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and water/drainage connections within 15 metres of installation points.
- The Contractor shall provide a fixed monthly price for all services and assets supplied under this contract Equipment Specifications and Requirements
- Supply and install free-standing, mains-fed machines at designated locations.
- Appearance and functionality must be suitable for high-traffic areas (station/office).
- Provision of PAT test certificates and installation records for all machines.
- State the energy efficiency rating of the proposed units.
- Total care package to include descaling and filter replacement at intervals suitable for hardwater areas.
Service intervals to be specified in the Service Level Agreement (SLA).
Bottled Water Chillers
- Supply bottled water chillers at up to 34 designated sites, as per inventory.
- Deliver the required number of bottles during servicing visits; remove and dispose of used bottles in an environmentally responsible manner.
- Provide an order process for individual Fire Stations and HQ to reorder directly via telephone or portal, with a capped maximum number per week.
- Provide an SLA for servicing, including internal and external cleaning.
Mains Water Chillers / Coolers
- Supply and install free-standing, mains-fed water chillers as specified in the inventory.
- Chillers must dispense both chilled and ambient temperature water.
- The body of the chiller shall not be stainless steel; the Contractor must specify available colour/finish options.
- Appearance and functionality to be suitable for high-traffic (station/office) environments.
- State energy efficiency rating of each proposed unit.
- Total care package to include cleaning reports/certificates, PAT testing records, and operative training for cleaning, descaling, and filter replacement at intervals appropriate for hard water
areas. Service intervals must be detailed in the SLA.
Instant Hot Water Boilers
- Supply and install free-standing or wall-mounted hot water boilers as required.
- Boilers must be capable of dispensing water at 100°C and accommodate various vessel sizes up to 2 litres.
- Contractor to specify the material and available colour/finish options for the boiler body.
- Appearance and functionality to be suitable for high-traffic (station/office) environments.
- State energy efficiency rating of each proposed unit.
- Total care package to include cleaning of exterior, descaling, and filter replacement, with service
intervals confirmed in the SLA, appropriate for hard water areas.
Maintenance and Compliance
- Contractor to perform scheduled and reactive maintenance, ensuring all equipment remains fully operational and compliant with statutory requirements.
- Provide all necessary PAT testing records and maintenance certificates.
- Include training for RBFRS staff responsible for equipment cleaning and routine maintenance.
Environmental Considerations
- Contractor must demonstrate environmentally responsible practices for supply, disposal, and recycling of consumables and equipment.
Service Level Agreement (SLA)
- The Contractor shall provide a detailed SLA outlining all service intervals, response times, and
performance standards for all equipment and services supplied under this contract
Mobilisation
- Prior to the commencement of the contract, the appointed contractor shall develop and execute a comprehensive mobilisation plan. This will include conducting site visits to perform assessment surveys of existing equipment. The assessment must verify the correct placement of units, evaluate the feasibility of transitioning from bottled water to a mains-fed cooling system, and incorporate any additional hot and cold-water points as directed by the relevant authority
Requirements
Suppliers will be required to provide the following services in a cost-effective structure:
- The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations.
- All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and water/drainage connections within 15 metres of installation points.
- The Contractor shall provide a fixed monthly price for all services and assets supplied under this contract Equipment Specifications and Requirements
- Appearance and functionality must be suitable for high-traffic areas (station/office).
- Deliver the required number of bottles during servicing visits; remove and dispose of used bottles in an environmentally responsible manner.
- Chillers must dispense both chilled and ambient temperature water.
- The body of the chiller shall not be stainless steel; the Contractor must specify available colour/finish options.
areas. Service intervals must be detailed in the SLA.
- Supply and install free-standing or wall-mounted hot water boilers as required.
- Boilers must be capable of dispensing water at 100°C and accommodate various vessel sizes up to 2 litres.
- Contractor must demonstrate environmentally responsible practices for supply, disposal, and recycling of consumables and equipment.
- The Contractor shall provide a detailed SLA outlining all service intervals, response times, and
Site Viewing
- Prior to the commencement of the contract, the appointed contractor shall develop and execute a comprehensive mobilisation plan. This will include conducting site visits to perform assessment surveys of existing equipment. The assessment must verify the correct placement of units, evaluate the feasibility of transitioning from bottled water to a mains-fed cooling system, and incorporate any additional hot and cold-water points as directed by the relevant authority
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Circon Lt t/a Crown Water and Coffee
£100,000
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY
£101,000
total awarded
- 2
Gatenby Sanderson Ltd
2 contracts wonlatest 18 Dec 2025ends 31 Mar 2026£100,000
total awarded
- 3
RIDGE AND PARTNERS LLP
£2m
total awarded
- 4
Essex County Council
1 contract wonlatest 16 Sept 2026£27,900
total awarded
- 5
RYAN PROPERTY TAX SERVICES UK LIMITED
£50,000
total awarded
BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Royal Berkshire Fire AuthorityKey Dates
Published
11 March 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Extra care housing development - edinburgh house
NB: The Councils' high level requirements are summarised below with further important details included within the Procurement Documents accessible via https://supplier.in-tend.co.u
Carbine backup sights
The CNC requires Backup Iron Sights (BUS) to provide a reliable secondary sighting capability for its GR115 carbines. The BUS will be used alongside the CNC’s chosen primary sighti
Office facilities, HVAC & building services management for lifestone homes
Lifestone Homes Limited wishes to appoint an experienced M&E contractor to undertake varied statutory services of the group and its subsidiaries. The intention is to commence April
Grounds and hedges maintenance
Cut hedges located at the Recreation ground perimeter including PROW, carpark. Cut hedges by bus shelter. Gang Mowing Halstead Recreation Fertilise recreation field Weed treatment
