St Andrew Square Public Realm Improvement Project
The City of Edinburgh CouncilEstimated Value
Up to £2,750,000
Deadline
Not specified
Published
1 July 2026
Type
works
Overview
The City of Edinburgh Council requires a Contractor to deliver public realm improvements to the area around St Andrew Square, within the city centre. St Andrew Square is a key connection between the existing City Centre West to East Link (CCWEL), the proposed George Street and First New Town (GNT) scheme, and the George Street to Waverley Bridge (GSWB) active travel project.
St Andrew Square has undergone recent transformation with investment to the central gardens in 2008, tram development, and various building redevelopments for retail, hospitality and offices. Edinburgh is a leading global capital city set within an exceptional historic and architectural setting.
The city centre, a unique urban landscape comprising the Old and New Towns of Edinburgh, was inscribed as a UNESCO World Heritage Site in 1996. The First New Town, of which George Street forms its core, carries significant and unique value and is a hive of activity, offering a place to work, visit and live.
Additional details
At a strategic level, the City Centre Transformation (CCT) Strategy which unifies existing city centre projects into a singular holistic delivery plan. The CCT Strategy identifies key quiet zones in the city centre where people will have priority, with the overall objective to secure a largely car free city centre by 2030.
The City Mobility Plan (CMP) strategy frames a bold, ambitious, and rapid change agenda (underpinned by a target to be net carbon zero City by 2030) and sets out a basis for significant tram, bus network and active travel interventions to improve mobility and address key challenges. The strategy will mean car and heavily bus dominated traffic within the city centre will be replaced by walking and cycling infrastructure, and by smaller cleaner passenger vehicles for those, who with mobility constraints, would find this approach too challenging.
The designs for St Andrew Square, align with many of the CCT and CMP core objectives. Within the project area, design work is ongoing for the northern and western sides of the Square with minor operational changes to the south of the square.
Proposed changes: - Eastern footway (pavement) will be widened to 6.0m creating more space for public realm enhancements. - New protected bi-directional (two-way) cycle track will be introduced on the east side of St David Street and along the north side of St Andrew Square. - Junction upgrades to support safer, easier and more accessible movements for people walking, wheeling and cycling. - Existing blue badge parking, business loading and taxi rank spaces to be retained along southern side of the square, with additional capacity added. - Existing pay and display parking to be removed along northern side of the square and replaced with blue badge spaces on the northern side of the road. In summary, the project will provide a continuous link between various ongoing projects and will maximise accessibility for active modes whilst retaining fundamental operational and servicing requirements including parking, loading and public transport.
Completing this work will enhance the attractiveness of St Andrew Square for everyone and encourage people to spend time in and around the square and within the various local businesses. The works will be undertaken in a highly constrained urban environment and must be carefully planned and executed to minimise disruption.
The Contractor will be required to ensure that access to local businesses and residential properties is maintained at all times throughout the duration of the works. Additional information: We kindly invite interested parties to complete the questionnaire attached to this notice by 30th July 2026. Your answers will help the Council determine the optimal procurement approach.
AI Analysis
Powered by AI — always verify against official documents
Edinburgh Council is looking for a contractor to improve the public space around St Andrew Square in the city centre, including widening pavements, adding cycle tracks, upgrading junctions, and managing parking and loading areas. This is part of Edinburgh's wider plan to make the city centre car-free by 2030 and more walkable and cycleable.
Requirements
- Ability to work in a highly constrained urban environment with minimal disruption
- Must maintain access to local businesses and residential properties at all times during works
- Must plan and execute work carefully to minimize disruption in a UNESCO World Heritage Site setting
- No specific certifications or qualifications stated in this notice — check full tender documents for compliance requirements (likely to include health and safety, environmental, and urban construction standards)
- Must adhere to City Centre Transformation Strategy and City Mobility Plan objectives
Key Tasks & Deliverables
- Widen the eastern footway (pavement) to 6.0 metres with public realm enhancements
- Install new protected bi-directional (two-way) cycle track on the east side of St David Street
- Install new protected bi-directional cycle track along the north side of St Andrew Square
- Upgrade junctions to improve safety and accessibility for pedestrians, wheelchair users, and cyclists
- Retain existing blue badge (disabled) parking, business loading, and taxi rank spaces on the southern side of the square
- Add additional blue badge parking capacity on the southern side
- Remove pay-and-display parking on the northern side of the square
- Add blue badge parking spaces on the northern side of the road
- Coordinate with ongoing design work on the northern and western sides of the square
- Implement minor operational changes to the south of the square
How to Read This Tender
- 1This is an early-stage notice asking for a questionnaire response by 30th July 2026 — the Council is still deciding how to run the procurement. Your answers will influence whether this becomes an open tender, framework agreement, or other format. Answer thoughtfully to show you understand their priorities.
- 2The jargon decoded: 'Public realm' means the public space (pavements, roads, squares) that everyone can use. 'Active travel' means walking and cycling. 'Blue badge' refers to disabled parking permits. 'Constrained urban environment' means working in a busy city centre with limited space and existing buildings and businesses nearby.
- 3This project is part of three linked schemes (CCWEL, GNT, GSWB) and the broader City Centre Transformation Strategy. Read those documents to understand how St Andrew Square fits into the bigger picture — the Council will expect bidders to know this context.
- 4Flag this key point: 'Access to local businesses and residential properties must be maintained at all times.' This is extremely strict in a busy city centre. Your method statement will need to show detailed traffic management, phasing, and contingency plans. Underestimating this risk is a common failure for city centre projects.
- 5The location is a UNESCO World Heritage Site, which means heritage and listed building considerations will apply. Check what consent processes, archaeological surveys, or heritage impact assessments are needed before digging or installing anything.
Tips for Small Businesses
- This is a questionnaire stage, not a full tender yet. Use this to demonstrate your understanding of urban construction in sensitive city-centre locations and your track record managing disruption. If you've completed similar projects (cycle tracks, pavement widening, junction work in historic city centres), this is where to flag that experience.
- Consider whether to bid alone or as part of a consortium. This involves cycle infrastructure, junction design, parking management, and pavement work — if your firm specializes in one area (e.g., cycle tracks), partnering with a firm strong in traffic management or pavement design could strengthen your bid.
- Expect this to require significant planning around utility services (water, gas, electricity, telecoms running under streets). Early engagement with utility companies and a detailed ground investigation will be essential — factor in time and cost for this in any future bid.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Sign up freeto open noticeA free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Useful Resources
A free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Buyer Profile
The City of Edinburgh CouncilKey Dates
Published
1 July 2026
Submission deadline
Not specified
Notice type
planning
Source
find a tender
Related Contracts
For the provision of surfacing works
This contract is for a supplier to carry out surfacing works at eight LondonEnergy sites. The buyer also requires the supplier to join the Dynamic Marker membership scheme before starting the work.
For the provision of surfacing works
LondonEnergy needs a contractor to carry out surfacing (civil) works at eight of its sites, and suppliers must join the Dynamic Marker membership scheme to be considered.
Gb-york: sports campus padel canopy installation
York St John University is looking for a supplier to design, supply and install a weather‑proof canopy over its new outdoor padel court so the facility can stay open as much as possible during construction.
Gregory batch 16
This contract is for adapting several residential properties to improve accessibility, including installing stairlifts, level‑access showers and wash‑dry toilets for residents who need extra support.