Southern Water Andover Link Main (ALM) Pipeline Construction & Connection
Southern Water Services LimitedEstimated Value
Up to £70,000,000
Deadline
27 October 2025
Published
26 September 2025
Type
Not specified
Overview
The Andover Link Main (ALM) scheme is being delivered by Southern Water Services (SWS) under the Major Projects Directorate. The ALM project is part of the WRMP programme and is associated with SWS’s agreement with the EA under Section 20 of the Water Resources Act 1991 put in place following Public Inquiry to reduce our abstraction licenses for public water supply.
Its purpose is to provide environmental protection for the rivers Test and Itchen. The WRMP Programme aims to create greater resilience to water shortages, especially during dry weather and droughts.
Existing abstraction licences for the River Test and River Itchen have been substantially reduced through changes required by the Environment Agency to protect the rivers, both designated as Sites of Special Scientific Interest (SSSI), and the River Itchen as Special Area of Conservation (SAC). Additional licence changes will bring further reductions.
Regulations cited
- Water Resources Act 1991
Additional details
These rivers are key examples of rare chalk stream habitat which support a wide variety of species. The Proposed Scheme will support environmental improvement by increasing the protection of these rivers while addressing the need for secure water supply.
The ALM scheme involves approximately 25km of below-ground pipeline connecting critical infrastructure between Winchester and Andover, alongside upgrades to existing and new booster stations. It aims to deliver a bi-directional transfer capacity of 15Ml/d by March 2030, ensuring both strategic drought resilience and operational reliability for the isolated Andover Water Resource Zone (WRZ).
SWS delivery strategy is to appoint a single Principal Contractor to design and build Andover Link Main, delivery to inclue detailed design and construction package with enabling work to be completed prior to construction. This will also include support to discharge planning conditions and submission of certain environmental consent and permits.
The Principal Contractor will act as a Tier 1 provider and sub-contract specialist elements. Southern Water have developed the scheme proposal to early outline design and are planning to complete this phase of work to enable the design to be realkeased with the ITT, post participation stage. comprising a detailed design and construction package, with enabling work to be completed prior to construction. This will also include support to discharge planning conditions and submission of certain environmental consent and permits.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
STANTEC UK LIMITED
£11m
total awarded
- 2
Wild Capital 1 Ltd
£3m
total awarded
- 3
Hydraulic Analysis Limited
£1m
total awarded
- 4
Harry Ferguson Farms Limited
1 contract wonlatest 1 Oct 2026ends 31 Mar 2027£2m
total awarded
- 5
Hampshire and Isle of Wight Wildlife Trust
1 contract wonlatest 1 Oct 2026ends 31 Mar 2027£2m
total awarded
STANTEC UK LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Southern Water Services LimitedKey Dates
Published
26 September 2025
Submission deadline
27 October 2025
Notice type
tender
Source
find a tender
Related Tenders
HV cable procurement
UKAEA is undertaking refurbishment works to the J5 electrical infrastructure to support the ongoing operation and reliability of the Culham Campus power distribution network. As pa
Trunk road litter picking
Annual litter picking of the verges, laybys and slip roads of the Highways Agency’s trunk roads within the Borough of Test Valley area, with optional ad-hoc related activities that
Community suds planters project
Through Project Sponge, the council intends to deliver phase two of the downpipe planter programme. Phase two will include planter installations at the following locations: 1. Cipp
The replacement of the sports hall flat roof, edenbridge leisure centre
The District Council of Sevenoaks is looking for a qualified roofing contractor to replace the flat roof on the Sports Hall at Edenbridge Leisure Centre, while keeping the centre safe and as operational as possible during the works.