Selsey Coastal Scheme Capital Works

Chichester District Council

Estimated Value

Up to £90,000,000

Deadline

Not specified

Published

8 April 2025

Type

Not specified

South EastGB

Overview

Selsey is located on the southernmost tip of West Sussex on the Manhood Peninsula, within the jurisdiction of Chichester District Council (CDC). It is around 7 miles South of Chichester and borders Bracklesham Bay to the West and Pagham Harbour to the East.

The Selsey peninsula is an exposed coastline with a long history of managing coastal erosion and tidal flood risk. Selsey is an erosive peninsula and in the past, due to rapid coastal erosion, hard engineered defences were created to protect Selsey from both tidal flooding and erosion.

Prior to the construction of the existing sea wall in the 1950’s, Selsey was reported as one of the fastest eroding coastlines in England. The existing hard defences consist of reinforced concrete sea walls of various forms (particularly on the West Beach side) and timber groynes fronted by a highly mobile shingle beach (at East Beach).

Additional details

The hard defences are reaching, or have reached, the end of their design life. The routine repair and maintenance of coastal defences has become more frequent, as well as increasingly complex and costly, as the defences continue to age and fail.

Chichester District Council has undertaken a successful programme of beach management over the last decade, and Flood and Coastal Erosion Risk Management (FCERM) Grant in Aid (GiA) funding is in place to continue these works till 2027. However, beach management alone does not address the long-term challenges faced which include: • The increased frequency, magnitude and complexity of the works required to maintain the existing coastal defence structures, as they reach the end of the design lives. • Predicted sea level rise due to climate change.

There are currently two Shoreline Management Plans which cover this frontage, both of which have adopted a ‘Hold the Line’ policy. This is supported by the Pagham to East Head Strategy, 2009 which has an adopted policy of Hold the Line via Sustain (maintaining the current level of protection with sea level rise).

The Strategy recognised the need to manage coastal erosion and flood risk along the Selsey frontage, its aging defences and also its low priority for national funding at the time. It is the intention that the outcome of this project is to agree and implement a new, updated approach for these plans. • Since the Strategy there have been changes in guidance, evidence to support understanding, and a change in the funding approach to for FCERM projects.

A feasibility study was needed to understand the impacts of these changes, which was completed in 2023. • The feasibility study confirmed the viability of a major capital scheme for Selsey and supported a successful Flood Defence Grant in Aid (FDGiA) funding application for the options appraisal and outline design phase of the project which commenced in November 2024. • The primary outputs of the options appraisal and outline design stage are an Outline Business Case (OBC) and an outline design for the scheme. Subject to a successful OBC, the design will then be progressed to developed / planning design, detailed design and all the necessary licences and consents will be sought. • Given the condition of the current assets the outline design solutions will likely include encapsulating of the existing assets with new structures and capital replacement of existing assets.

The size and scale of these works will exceed £50M and be considered a major project. The project will be delivered in accordance with the Project Lifecycle and HM Treasure gateways/funding decision points .

Funding for the construction phase will be dependent on a successful Full Business Case. This is an extensive project and will require a number of sub-projects to be commissioned (see scope below) prior to the main construction contract being put in place. Additionally, the project will require extensive market engagement prior to agreeing the scope of work and appointing a supplier to deliver the capital works along the Chichester District coastline.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Likely incumbents

Suppliers who won similar work from this buyer in the last 5 years.

5 found
  1. 1

    M.P.M. SPECIALIST SOLUTIONS LIMITED

    1 contract wonlatest 18 Sept 2026CH 03326070

    £70,000

    total awarded

  2. 2

    J.T.MACKLEY & CO.LIMITED

    1 contract wonlatest 9 Jul 2026ends 9 Oct 2026CH 00258810

    £739,636

    total awarded

  3. 3

    Westons Group LTD

    1 contract wonlatest 18 May 2026ends 13 Jun 2029CH 10514545

    £408,000

    total awarded

  4. 4

    Grundon Waste Management Ltd.

    1 contract wonlatest 6 Jan 2026ends 14 Feb 2028

    £5m

    total awarded

  5. 5

    TJ Waste & Recycling Limited

    1 contract wonlatest 6 Jan 2026ends 14 Feb 2028

    £50,000

    total awarded

M.P.M. SPECIALIST SOLUTIONS LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

Chichester District Council
Typepublic body
RegionUKJ27
Total tenders9
Total spend£104,175,732
View buyer profile

Key Dates

Published

8 April 2025

Submission deadline

Not specified

Notice type

planning

Source

find a tender

Similar

Related Tenders