Estimated Value
Up to £16,666,667
Deadline
12 April 2025
Published
10 April 2026
Type
works
Overview
Kent County Council (KCC), as the upper‑tier authority, is the Highway Authority for highways maintainable at public expense and has a statutory duty to maintain the highways and their assets in accordance with Section 41 of the Highways Act 1980. This duty includes responsibility for maintaining, managing and, where necessary, improving sections of the network and ensuring the highways are safe for the travelling public.
To meet and deliver these statutory obligations, KCC requires competent contractors, as there is no internal resource available to undertake this work. There are approximately 5,445 miles of local roads in Kent (616 miles of A roads, 279 miles of B roads, 1,172 miles of C roads and 3,378 miles of unclassified roads), making it one of the largest and most heavily trafficked local authority networks in the country.
The Local Highways Maintenance Support Contracts augment the delivery of highway maintenance services directly at a local level for the residents and businesses of Kent. The works undertaken as part of these contracts are managed by the local Highway Managers and their teams, ensuring budgets are used appropriately to repair and prevent potholes and improve highway condition at targeted locations.
Regulations cited
- Highways Act 1980
- Street Works Act 1991
Additional details
The core services included in these contracts relate to the delivery of pothole repairs, small‑ to medium‑sized patching repairs, and small‑scale resurfacing and associated works. They also support resources that can be utilised during emergency and severe weather events where necessary.
Works orders under this contract are raised by KCC Highway staff. The works consist of small and medium patching, generally within the carriageway, with occasional small areas of footway patching as required.
Pre‑site inspections will be undertaken jointly between KCC and the Contractor, where necessary, to minimise any issues that may prevent the works from being carried out. Other in scope activities and civil engineering works will also be undertaken as required.
The Contractor will deliver a programme of works over a 6‑ to 8‑month period, usually between April and October, when weather and road temperatures are optimal for highway repairs. Works may, however, be required outside of these times where necessary.
The Contractor will provide sufficient resources to ensure minimal deviation from projected timescales. Operatives must be fully trained, possess the required qualifications and expertise to deliver the works, and must take before‑ and after‑photographs at each site.
The key aim of these contracts is to deliver a permanent, high‑quality, first‑time repair, including adjusting ironworks and reinstating all white lining. The Contractor is responsible for managing all aspects of traffic management in accordance with the Code of Practice for Safety at Street Works and Road Works and the New Roads and Street Works Act 1991.
The service has been divided into six geographical areas, each of which has been awarded a separate contract. The contracts have an initial term of three years, with the option to extend for a further two years.
The initial contract period runs from 08 April 2026 to 07 April 2029. The optional extension period runs from 08 April 2029 to 07 April 2031.
The extension may be applied in a variety of increments up to a maximum of two years. These contracts are zero‑value arrangements, as no work is guaranteed under the contract.
However, the contracts have a maximum combined contract value of £100,000,000, equating to approximately £16,666,666.67 per lot over the full duration of the contract, including any extension periods. Delivery of the service across this lot.
Delivery of the service across this lot. Delivery of the service across this lot.
Delivery of the service across this lot. Delivery of the service across this lot. Delivery of the service across this lot.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Elm Surfacing Ltd
£16,666,667
G & J STEELE PLANT HIRE LIMITED
£16,666,667
Henderson & Taylor (Public Works) Limited
£16,666,667
HENDERSON & TAYLOR PUBLIC WORKS LIMITED
£16,666,667
C.W. SURFACING LTD
£16,666,667
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Erith Contractors Limited
£22m
total awarded
- 2
Breheny Civil Engineering Limited
£11m
total awarded
- 3
Jackson Civil Engineering Limited
1 contract wonlatest 30 Apr 2025£13m
total awarded
- 4
GW Highways Limited
1 contract wonlatest 10 Mar 2025 - 5
Ferns Surfacing Limited
1 contract wonlatest 26 Feb 2025
Erith Contractors Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Kent County CouncilKey Dates
Published
10 April 2026
Submission deadline
12 April 2025
Notice type
award
Source
find a tender
Related Tenders
GMCA 1342 wigan combined fire station refurbishment
The contract is for refurbishing the Wigan Combined Fire Station, which is used jointly by Greater Manchester Fire & Rescue Service and Northwest Ambulance Service. It will be awarded directly under the NHS framework to deliver a range of improvements for both organisations.
Greenwich minor works dynamic purchasing system
The University of Greenwich wants to set up a Dynamic Purchasing System (DPS) — essentially a pre-approved supplier list — for minor building and maintenance works projects. They expect to call-off (order) projects worth £1–2 million each over time, covering everything from painting and repairs to specialist work like asbestos removal and solar panel installation.
Green link - cycling and walking routes - lee farm/ victoria recreation ground (with optional additional site)
This contract is for upgrading and maintaining cycling and walking routes on the island, funded by the Department for Transport Levelling Up programme, and is aimed at contractors who can carry out civil works like surfacing, drainage and kerbing.
Construction dynamic purchasing system
Oxford Health NHS Foundation Trust is setting up a dynamic purchasing system for construction work, allowing suppliers to bid on mechanical, electrical, general building and external ground works above certain monetary thresholds.
