Riparian Buffer Strip Tool and Methodology for project assessments
Natural EnglandEstimated Value
Up to £10,760
Deadline
21 June 2025
Published
27 June 2025
Type
Not specified
Overview
Natural England is developing the Conservation Measures Standard to underpin the delivery of the NRF. Part of this work requires a methodology and tool for quantify the nutrient reductions generated through implementing riparian buffer strips (RBS) in Nutrient Neutrality (NN) catchments to improve water quality.
This tool will facilitate mitigation scheme suppliers to design and deliver robust RBS to generate nutrient reductions capable of offsetting nutrient inputs from development in NN catchments. This tool and its associated guidance will be part of a wider project Natural England has begun to produce standardised tools, guidance and assessment criteria to ensure conservation measure projects (mitigation schemes) are effective at achieving the intended environmental outcome.
This project, the Conservation Measures Standard (CMS), will develop Solution Toolkits for each of the measure relied upon to deliver nutrient mitigation, prioritising the most effective and commonly used measures to allow scheme suppliers to design and implement high-quality schemes in accordance with the set standard. This request for work will build on existing work on RBS to generate nutrient mitigation by commissioning a comprehensive methodology and tool to accurately quantify the nutrient reduction achieved at a project scale through the implementation of RBS.
Additional details
The commission forms two parts, the first request is to design a robust methodology to calculate the N and P reduction achieved in kg/year by implementing a RBS project in a NN catchment. This will need to be developed in collaboration with NE and should incorporate the existing evidence base commissioned by NE.
The second part of this commission is to use GIS and data science/analytics to develop a tool to enable site specific calculations for N and P reductions achieved by a RBS project. This must be based on the above methodology and should incorporate a level of precaution to account for any uncertainty. The work should align with other publications and tools generated by NE to quantify the nutrient inputs resulting from new development (Nutrient Neutrality calculators) and to quantify the nutrient reductions achieved by Nature-based Solutions/mitigation measures (Cover Crop calculators).
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
H FRASER CONSULTING LTD
£10,760
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
AXION SOLUTIONS LTD
£107,041
total awarded
- 2
ABPmer
4 contracts wonlatest 25 Aug 2026£268,235
total awarded
- 3
Game and Wildlife Conservation Trust
3 contracts wonlatest 8 Oct 2026ends 15 Jan 2027£35,912
total awarded
- 4
UK Centre for Ecology & Hydrology
3 contracts wonlatest 16 Sept 2026£174,491
total awarded
- 5
JAMES HUTTON LIMITED
£88,943
total awarded
AXION SOLUTIONS LTD is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Natural EnglandKey Dates
Published
27 June 2025
Submission deadline
21 June 2025
Notice type
award
Source
find a tender
Related Tenders
Provision of aerial survey of the UK rail network - lidar (light detection and ranging) and aerial photography
Network Rail require an Aerial Survey of the UK rail network, principally consisting of LiDAR (Light Detection and Ranging) and RGB (Red, Green and Blue) data capture. There is a d
Hackney publication - print and distribution contract
A Hackney Publication - Print and Distribution Contract. The contract will run for a maximum period of three years (2 years + 1 year) and is split into 2 lots: Lot 1 - Print Lot 2
Community and maternity champions services for RBKC & WCC
This is the re-procurement of the Earl’s Court Community Champions service on behalf of the Royal Borough of Kensington and Chelsea, and the Maternity Champions services on behalf
Notice of intention to award under the public health framework - live well preventative health services
This is a Provider Selection Regime (PSR) intention to award notice. The awarding of this contract is subject to the Health Care Services (Provider Selection Regime) Regulations 20
