Refurbishment and Upgrade of Calf of Eday Lighthouse
Northern Lighthouse BoardEstimated Value
Up to £303,640
Deadline
24 February 2026
Published
13 March 2026
Type
Not specified
Full Description
Description of Works
The Site
Location: Calf of Eday Minor Light is situated on the small island of Eday, to the Northeast of mainland Orkney (Latitude 59o 14.2’ N, Longitude 2o 45.7’ W).
Lighthouse Site: Access to the site is through an agreed right of access with the owner of Carrick Farm, Eday. This consists of a rough footpath through grazing fields (pasture and rough grazing), approx. 870m in length. The topography is relatively flat, with some sections of steeper ground across small burns. There are steep cliffs immediately to the seaward side of the access track.
On the landward side of the site, there is a small solar array bounded by a post and wire fence, and a set of concrete steps with galvanised steel handrail down to the lighthouse access walkway. This walkway itself is formed of galvanised steel which sits on stone piers.
The lighthouse itself is built on a concrete base within the intertidal zone and sits approximately 18.0m out from high tide level.
This project is to refurbish the lighthouse structure including replacement of the existing access ladder, balcony and lightroom with GRP equivalent, and full electrical re-work. There are minor repairs required to the existing access walkway and solar array.
Site Access
Due to the location of this site, the majority of materials and equipment will be transported to and from site via NLB Ship and Helicopter. See sections of NLB Helicopter manual for details of working with the helicopter included as an Appendix to the tender documents. There will additionally be a requirement to bring some sections of the new lightroom to site using a ‘multicat’ style low draught vessel with crane attachment.
The site can be accessed by boat, subject to local weather conditions, and on foot, as above. An agreement may be reached with the landowner regarding access through their fields using small ATVs, but this is not currently in place.
The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract.
All materials for site establishment to be delivered to NLB Oban no later than 17 April 2026.
NLV Pharos and NLB Helicopter to deliver materials to site starting 28 April 2026, with block ending 3 May 2026, latest.
A mid-visit by NLV Pharos and NLB Helicopter is scheduled for 28-30 June 2026, inclusive.
Project works to be completed ahead of scheduled clearance by NLV Pharos and NLB Helicopter 29 August to 1 September 2026, inclusive.
Main elements of project as follows
•Carry out full asbestos survey of buildings where work will take place
•Delivery of all plant/materials to site, and establish site
•Establishment of site camp, to include welfare and accommodation for site staff for duration of the project
•Erection of scaffolding or other suitable access to allow for works to existing lightroom
•Demolition and removal from site of existing lightroom, balcony and access ladder
•Template made of existing fixing holes in top of octagonal tower section
•Fabrication, delivery to site (using multicat vessel or other suitable means) and install of new GRP lightroom, aluminium balcony and access ladder
•Full electrical strip, including optic and solar panels, and install of new system
•Full internal and external redecoration of the tower, including removal of lightning conductor system
•Works to upgrade access bridge, including replacement of cross beams where corroded, infill of voids on masonry piers and replacement of some handrail elements
•Rewire of solar array boundary fence
•Demobilisation
Programme
All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 28 April 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works.
It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 11 February 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.
Requirements
This project is to refurbish the lighthouse structure including replacement of the existing access ladder, balcony and lightroom with GRP equivalent, and full electrical re-work. There are minor repairs required to the existing access walkway and solar array.
The Principal Contractor must also ensure that the condition of any access routes are monitored and any areas identified as hazardous are noted with details passed to their own employees, appointed sub-contractors, and all visiting NLB personnel. If necessary, suitable remedial and protective measures should be put in place to protect anyone on the site and the environment for the duration of the contract.
Submission Instructions
All contractors must submit a detailed works programme, at tender stage, with a proposed work commencement date on site of 28 April 2026. We require flexibility on the programme to be able to cope with many variables including tides, weather etc. On award we agree a final programme of works.
It is important that Tenderers or their representative(s) attend the site visit, any Tenderers submitting a tender that have not attended the site visit, will not be considered. Site visits will be conducted on Wednesday 11 February 2026. Please request a site visit via Delta eSourcing attendance and names, mobile numbers of representatives attending site.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Accted Limited
£303,640
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
TRAC HLM Limited
£728,590
total awarded
- 2
Accted Ltd
2 contracts wonlatest 23 Jun 2026ends 21 Mar 2027£105,733
total awarded
- 3
Dart Industrial Services Ltd
2 contracts wonlatest 3 Jun 2026ends 28 Mar 2027£103,454
total awarded
- 4
Mrs J C Altham & Sons (Lancaster) Limited
2 contracts wonlatest 11 Sept 2025ends 12 Aug 2025£213,632
total awarded
- 5
Accted Engineering
2 contracts wonlatest 5 Sept 2025ends 1 Feb 2027£600,000
total awarded
TRAC HLM Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Northern Lighthouse BoardKey Dates
Published
13 March 2026
Submission deadline
24 February 2026
Notice type
award
Source
find a tender
Related Tenders
Supply and delivery of heavy and municipal vehicles
This is in relation to the renewal framework for the supply and delivery of Heavy and Municipal Vehicles, available for all 32 council areas in Scotland and Scotland Excel Associat
Libraries scotland enewspaper and emagazine
The aim of this tender is to provide a single national eMagazines and eNewpapers service to all thirty-two public library services for access by their members. Scottish Library and
Pupil equity funding (PEF) flexible framework
The Scottish Government has committed to providing additional funding in the form of Pupil Equity Funding (PEF), to schools as part of the Scottish Attainment Challenge programme.
Provision of homeless supported accommodation, outreach tenancy support and housing first services
Falkirk Council is setting up a framework to contract providers to deliver homeless support services, including interim accommodation for young people and adults, community tenancy support, and a Housing First programme.
