Infrastructure Monitoring Core Service

NETWORK RAIL INFRASTRUCTURE LIMITED

Estimated Value

Up to £1,500,000,000

Deadline

9 October 2025

Published

29 August 2025

Type

Not specified

LondonGBselective

Full Description

Network Rail (“the Authority”) is procuring an end to end Infrastructure Monitoring (IM) solution to replace its life expired dedicated IM fleet and assure the safe, reliable and efficient operation of the Great Britain rail network. The supplier will provide, operate and maintain the assets, systems and services necessary to capture, process, assure and deliver all required IM data streams to Network Rail’s Enterprise Data Platform, in accordance with relevant Measurement Standards and IM Data Specifications, so that the Authority receives the right data, in full and on time, for use by end customers across Regions and Routes.

The solution may combine dedicated IM rolling stock, in service monitoring (on timetabled passenger or freight services) and, where appropriate on a cost–benefit basis, non train borne methods (e.g., Road-Rail Vehicle (RRV)), provided all applicable law, policy and standards are met. The supplier will act as Entity in Charge of Maintenance (ECM), manage obsolescence, ensure approvals for operation on the British network, and deliver services against a jointly maintained Joint Operating Plan. Network Rail will not purchase or own the solution assets.

Core scope of services and outputs

  • Data capture & delivery: Provision of 18 IM data streams to the Authority’s defined structures/formats (open, non proprietary) and timelines, including urgent reporting for safety critical findings. Data assurance (including ISO 8000 aligned data quality regime), secure handling/retention, and transmission (default use of Network Rail telecoms where suitable) are in scope.
  • Operations: Plan, crew and run IM activities in accordance with the Joint Operating Plan (dedicated paths arranged by Network Rail; in service paths orchestrated by the supplier with the relevant TOC/FOC). The solution must minimise non recording mileage and timetable capacity consumption (e.g., by operating closer to line speed) and be resilient to disruption (e.g., recovery runs to protect maximum measurement intervals).
  • Maintenance & reliability: Provide serviceable, compliant, calibrated assets/systems designed for reliability, maintainability and ease of operation; hold/maintain necessary licenses/approvals (including ORR requirements) and product acceptance; manage spares, calibration, and certification.
  • Continuous improvement & innovation: Deliver ongoing efficiency/performance improvements and proactively stimulate market innovation against Network Rail’s future ambitions, using open architectures that mitigate vendor/technology lock in and enable integration of best of breed systems via change control where approved.
  • Performance management: Meet a KPI regime covering service reliability, on time delivery, completion rate, data compliance, data quality, user satisfaction, continuous improvement, innovation, social value, safety, and environment/sustainability.
  • Mobilisation & transition: Mobilise new solution per tendered plan; as capabilities enter service, Network Rail will decommission the current IM fleet. Supplier support may be requested for advice during transition.

Minimum data streams in scope

  • Rail flaw detection.
  • Rail depth.
  • Rail surface crack.
  • Rail profile (wear).
  • Track bed condition (e.g., ballast depth/fouling).
  • Structure gauging.
  • Platform gauging.
  • Track intervals (six foot gauging).
  • Ballast profile.
  • Track geometry.
  • Track imagery (shoulder to shoulder).
  • Automated track inspection.
  • Static OLE geometry.
  • OLE contact wire wear.
  • Conductor rail geometry.
  • Conductor rail wear.
  • Forward facing imagery.
  • Communications networks signal strength (e.g., GSM R, public mobile).

Standards, compliance and constraints

Data streams must meet the relevant Measurement Standards and Data Specifications (e.g., NR/L2/TRK series, NR/L2/ELP/27325, NR/L2/TRK/3204, NR/L2/TRK/038, etc.), with delivery frequencies adhering to nominal and maximum intervals defined per track section in the Baseline Coverage Requirements. The solution must comply with applicable law and Railway Group Standards, data protection/security requirements, and environmental/sustainability obligations; emissions reduction (e.g., electric where feasible, electro diesel where necessary) is expected.

Out of scope

Analysis of data beyond the IM Data Specifications, and the operation, maintenance and disposal of the existing IM fleet.

Requirements

Network Rail (“the Authority”) is procuring an end to end Infrastructure Monitoring (IM) solution to replace its life expired dedicated IM fleet and assure the safe, reliable and efficient operation of the Great Britain rail network. The supplier will provide, operate and maintain the assets, systems and services necessary to capture, process, assure and deliver all required IM data streams to Network Rail’s Enterprise Data Platform, in accordance with relevant Measurement Standards and IM Data Specifications, so that the Authority receives the right data, in full and on time, for use by end customers across Regions and Routes.

  • Operations: Plan, crew and run IM activities in accordance with the Joint Operating Plan (dedicated paths arranged by Network Rail; in service paths orchestrated by the supplier with the relevant TOC/FOC). The solution must minimise non recording mileage and timetable capacity consumption (e.g., by operating closer to line speed) and be resilient to disruption (e.g., recovery runs to protect maximum measurement intervals).

Data streams must meet the relevant Measurement Standards and Data Specifications (e.g., NR/L2/TRK series, NR/L2/ELP/27325, NR/L2/TRK/3204, NR/L2/TRK/038, etc.), with delivery frequencies adhering to nominal and maximum intervals defined per track section in the Baseline Coverage Requirements. The solution must comply with applicable law and Railway Group Standards, data protection/security requirements, and environmental/sustainability obligations; emissions reduction (e.g., electric where feasible, electro diesel where necessary) is expected.

Analysis of data beyond the IM Data Specifications, and the operation, maintenance and disposal of the existing IM fleet.

Site Viewing

  • Automated track inspection.

Contact Information

  • OLE contact wire wear.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Likely incumbents

Suppliers who won similar work from this buyer in the last 5 years.

5 found
  1. 1

    Oracle Corporation UK Limited

    4 contracts wonlatest 12 May 2026ends 31 May 2029CH 01782505

    £11m

    total awarded

  2. 2

    PBE Europe Ltd

    3 contracts wonlatest 18 Sept 2026ends 30 Sept 2036CH 08337837

    £6m

    total awarded

  3. 3

    Tended Limited

    3 contracts wonlatest 17 Aug 2026ends 11 Jan 2028CH 10732693

    £5m

    total awarded

  4. 4

    Hitachi Energy UK Limited

    2 contracts wonlatest 5 Oct 2026ends 13 Sept 2031CH 02985756

    £6m

    total awarded

  5. 5

    Voestalpine Signaling UK Ltd.

    2 contracts wonlatest 14 Sept 2026ends 30 Jun 2030

    £111m

    total awarded

Oracle Corporation UK Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

Network Rail Infrastructure Limited
Typepublic body
RegionUK
Total tenders336
Total spend£29,242,467,663
View buyer profile

Key Dates

Published

29 August 2025

Submission deadline

9 October 2025

Notice type

tenderUpdate

Source

find a tender