FCDO New Embassy and Residence Works in Niamey, Niger
Foreign, Commonwealth and Development OfficeEstimated Value
Up to £7,460,000
Deadline
4 July 2025
Published
10 June 2025
Type
Not specified
Full Description
The scope of the project is to develop an existing site, leased by the FCDO, to accommodate the British Embassy and Ambassador’s Residence. The new embassy will replace the existing small locally staffed office in Niger.
The 2-storey Koira Kano villa is set within its own compound with a number of existing ancillary buildings to the southwest. The villa is on a corner plot at a junction with two roads and offers the opportunity for a secondary egress point.
Early Contractor Involvement (ECI) - Stage 1
The Contractor’s deliverables for Stage 1, which will include preparatory activities prior to the commencement of the main construction works, are as follows:
- Survey for unexploded ordnance.
- Logistics plan
- Report into availability of Plant and Materials
- Report into availability of local labour
- Subcontractor Procurement
- Procurement and delivery of Plant and Materials to site;
- Development of CDP;
- Existing trees – These will be assessed and retained as much as possible, subject to confirmation from the Operational Site Assessment some trees will be removed to allow placement of ancillary buildings. Following review of OSA;
- To work with the Project Manager in sourcing more cost-effective local materials, for inclusion in a revised procurement plan. Samples of all proposed local materials will be UK lab tested for acceptance;
- Unless otherwise agreed with the Project Manager, submission of all Plant and
Material samples in accordance with the design;
- Obtainment of the necessary construction permits required;
- Obtainment of visas for personnel requiring them to work on the Site;
- Confirm the relevant details of their locally licensed Subcontractor are included on the planning application within 5 days of the starting date;
- Undertaking all necessary surveys required to develop the Stage 1 Contractor’s Design Portion.
Construction Works - Stage 2
The existing site is a villa in Koira Kano district that will be combined into a new
Embassy/Residence compound. The project scope includes
- A large residential house - this building will remain and be converted to form the Embassy at ground floor and Residence at first floor.
- Existing outbuilding – this will be refurbished to provide driver’s resting facilities: tea point, shower room and bedroom.
- Existing open car port – the openings will be infilled to provide changing facilities with WC and shower.
- An existing pool – this is to be refurbished with a new deck raised at pool level and low-level fencing around the perimeter.
- New low level soft landscaping will be incorporated into a shared garden.
- Existing perimeter wall – is to be assessed by the contractor and reinforced as required.
- The wall between the two existing sites to be demolished to form one larger site.
Part of the site development design includes
- A relocated main entrance with controlled site access with vehicle airlock and pedestrian processing area.
- A new Guard House with an oriel window protruding from the site perimeter wall with a clear view over the external main road. The Guard House includes a waiting area with a bag scanner and lockers, search room and office space with tea point, shower room and rest facilities.
- A new police hut located outside perimeter wall, inside planters, near the Guard House.
- PV covered parking spaces.
- A new gym located by the pool area.
- New pool plantroom, inc. plant
- New formal and informal covered seating areas. • New outbuildings to include a water filtration store, switchroom, mail scanner (inc. frangible panel), storage, drivers rest room (inc. bedroom, toilet, kitchenette), Male & Female changing facilities,
- Use of soft landscaping, screening mechanisms and gates to separate private and shared areas.
- A secondary exit from the compound in case of emergency.
- Form new kerb line outside perimeter of external wall, including concrete planters set 1200mm apart
Requirements
- Obtainment of the necessary construction permits required;
- Undertaking all necessary surveys required to develop the Stage 1 Contractor’s Design Portion.
- Existing perimeter wall – is to be assessed by the contractor and reinforced as required.
Site Viewing
- Existing trees – These will be assessed and retained as much as possible, subject to confirmation from the Operational Site Assessment some trees will be removed to allow placement of ancillary buildings. Following review of OSA;
- A new Guard House with an oriel window protruding from the site perimeter wall with a clear view over the external main road. The Guard House includes a waiting area with a bag scanner and lockers, search room and office space with tea point, shower room and rest facilities.
Related Links
- Confirm the relevant details of their locally licensed Subcontractor are included on the planning application within 5 days of the starting date;
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
PALLADIUM INTERNATIONAL LIMITED
£37m
total awarded
- 2
UCL Consultants LTD
£2m
total awarded
- 3
Confidence Trade Ltd (CTL)
3 contracts wonlatest 5 Mar 2026ends 9 Sept 2026£574,674
total awarded
- 4
Red Snapper Managed Services Ltd
£25m
total awarded
- 5
Knight Frank LLP
3 contracts wonlatest 13 Nov 2025£150,000
total awarded
PALLADIUM INTERNATIONAL LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Foreign, Commonwealth and Development OfficeKey Dates
Published
10 June 2025
Submission deadline
4 July 2025
Notice type
tender
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council currently occupies Wisma Great Eastern, Penang - No. 25, Lebuh Light, 10200 Level 3A, Suite 3A.1. The British Council is required to fitout the premises to reco
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national