Responsive Maintenance Framework Agreement - Ref 01003
Tai Tarian LtdEstimated Value
Up to £3,940,000
Deadline
17 March 2026
Published
10 February 2026
Type
Not specified
Overview
Tai Tarian is seeking to appoint contractors (Providers) to a Framework Agreement for property related repairs and maintenance works. The scope of this Lot comprises repair and maintenance of plumbing (excluding heating and hot water) as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL1, and in accordance with Specification (Appendix 2AL1).
We are seeking to appoint Providers to complete 1-day and 7-day repairs including out of hours, on a fixed term 1 year Call-off Contract. We estimate work to be in the region of 600 – 700 works orders per quarter to address leaks, blockages and faulty plumbing e.g., taps, siphons, fill valves etc. The profile of work allocated is estimated at: • 45% of jobs needing to be completed in 1 day, including out-of-hour emergencies. • 55% of jobs requiring completion in 7 days.
The scope of this Lot comprises repair and maintenance of electrical installations and accessories as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL2, and in accordance with Specification (Appendix 2AL2). We are seeking to appoint a Provider to support our in-house maintenance team with: • Emergency repairs Out of Hours – We estimate 120 jobs per quarter needing to be completed on an emergency basis, reinstating power, dealing with unsafe electrical installations. • Periods of high demand and cover for absence e.g. leave, sickness etc – We estimate issuing up to 60 orders per quarter, all of which will be issued with 28-day priorities for various electrical maintenance and testing. • Work to maintain PV systems and batteries, including enabling work for our roofers – We have a planned installation programme currently providing PV to many of our homes.
Lots (1)
- Lot 4Plastering Lot 5 – Communal Aerials Lot 6 - Flooring Lot 7 – External works – Paths, Fencing and Walls Lot 8 – Fabrication of Railings and Gates Lots will be awarded on an individual basis, and a Tenderer can bid for a maximum of four lots
Eligibility & compliance
Tenderers must ensure that their submission clearly shows that they’re able to meet the requirements of each Lot, and (if bidding for multiple Lots) not to make any statement or assumption that their bid is conditional on being awarded multiple Lots.
Contact & helpdesk
Directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants.
Additional details
With over 2,000 homes due to have PV installed, we will require assistance of an MCS accredited Provider to undertake maintenance. Our initial requirement is to assist removal of some panels where properties require repairs to roofs.
We estimate issuing up to 6 orders per quarter, all of which will have 7-day targets. Over the four-year period, this work is likely to extend repairing or replacing panels and other PV accessories. • Ad-hoc work in relation to extractor fan replacements – We estimate there to be approximately 100 extractor fans to be replaced annually on a planned 28-day target.
We expect the successful Provider to attend and reinstate / repair within the allocated timescale. Disruption and damage associated with this to be kept to a minimum.
Any work required following completion of repairs will be handed over to Tai Tarian’s Property Services team. Work Orders will be issued as individual Call-off Contracts from two main sources: 1.
These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider. 2. Directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.
The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot for both the in and out of hours work It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.
The scope of this Lot comprises installation and maintenance of fire doors as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL3, and in accordance with Specification (Appendix 2AL3) We are seeking to appoint a Provider to complete 7 day and 28-day repairs. We estimate work to be in the region of 35 and 45 orders per quarter to fire doors, namely the installation or replacement of communal doors (not including flat entrance doors) and when necessary, some maintenance to existing doors e.g. closures, adjustments etc. The profile of work allocated is estimated at: • 65% of jobs need to be completed in 7 days. • 35% of jobs requiring completion in 28 days.
Providers must have suitable accreditation or equivalent to BM Trada to participate in this work. Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email.
The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties including those for flats and common areas (Table 2 Breakdown of Blocks and Flats by Ward). Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot.
There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot.
The scope of this Lot comprises plastering as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL4, and in accordance with Specification (Appendix 2AL4). We are seeking to appoint a Provider to support our in-house maintenance team with periods of high demand and cover for absence e.g. leave sickness etc. We estimate work to be in the region of 30 orders per quarter to complete orders with 28-day targets.
Works Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all of Tai Tarian’s properties (Table 1 Properties by Ward).
Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot.
It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot The scope of this Lot comprises work to communal aerials as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL5, and in accordance with Specification (Appendix 2AL5).
We are seeking to appoint a Provider to undertake 7-day and 28-day orders. We estimate work to be in the region of 30 orders per quarter to install, maintain or replace communal aerials.
The profile of work allocated is estimated at: • 35% of jobs need to be completed in 7 days. • 65% of jobs requiring completion in 28 days. Works Orders will be issued as individual Call-off Contracts directly from our contact centre colleagues (in house during working hours, externally outside of office hours) on receipt of repairs being reported by tenants.
These will aim to capture details of the repair being reported before forwarding details with the work order via email to the Provider. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties with communal aerials (Table 2 Breakdown of Blocks and Flats by Ward) Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot.
There is not out of hours service provision included in this Lot. It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot
The scope of this Lot comprises replacement of kitchen and bathroom flooring as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1DL6, and in accordance with Specification (Appendix 2BL6) We are seeking to appoint a Provider to undertake 28-day orders. The successful provider will be responsible for undertaking all associated works with the flooring replacement which will include, but not be limited to: • Removal and reinstatement of sanitaryware • Remedial works to flooring e.g. renewal of floorboards and applying self-level materials • Any associated plumbing works • Note – no disruption to gas appliances We estimate work to be in the region of 75 and 100 works orders per quarter to install / replace kitchen or bathroom flooring Renewal of bathroom and WC flooring to be fitted after removal of sanitaryware and same sanitaryware to be refitted on completion of flooring.
Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1 Properties by Ward).
Tai Tarian intends (but there is no obligation) to appoint a maximum of 1 Provider as Primary Provider, within this Lot. There is not out of hours service provision included in this Lot.
It is anticipated that a maximum of 1 Provider will be appointed as Reserve Provider within this Lot The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL7 and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL7, and in accordance with Specifications (Appendix 2AL7 and 2BL7 respectively) We are seeking to appoint a Provider to undertake 60 day and 365 day orders.
We estimate responsive work (60 day) to be in the region of 30 and 40 orders per quarter to replace fencing, re-build steps and walls, re-lay paths. Planned work (365 day) is estimated to be in the region of 20 orders per quarter.
Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all of Tai Tarian’s properties (Table 1 Properties by Ward).
Tai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot, with one focussing on responsive works and the other planned works. It is anticipated that a maximum of 2 Providers will be appointed as Reserve Providers within this Lot.
The scope of this Lot comprises repairs and maintenance of paths, fencing and walls as set out in the NHF Schedule of Rates for Responsive Maintenance (Version 8) included in Appendix 1CL8, and the NHF Schedule of Rates for Planned Maintenance (Version 8) included in Appendix 1DL8, and in accordance with Specifications (Appendix 2AL8 and 2BL8 respectively) We are seeking to appoint a Provider to undertake 60-day orders. We estimate work to be in the region of 25 and 30 orders per quarter to manufacture and fit metal gates, fencing and railings.
Work Orders will be issued as individual Call-off Contracts directly from our Inspectors or Team Leaders, who will provide the necessary scheduled information for work in a work order to be sent via email. The Provider will be required to provide adequate resource to cover all Tai Tarian’s properties (Table 1 Properties by Ward).
Tai Tarian intends (but there is no obligation) to appoint a maximum of 2 Providers as Primary Providers, within this Lot. There is not out of hours service provision included in this Lot.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Derwen Recycling Ltd
1 contract wonlatest 2 Oct 2026ends 31 Oct 2030£700,000
total awarded
- 2
Davies Skips Ltd
1 contract wonlatest 2 Oct 2026ends 31 Oct 2030£700,000
total awarded
- 3
Smiths (Gloucester) Ltd
1 contract wonlatest 2 Oct 2026ends 31 Oct 2030£700,000
total awarded
- 4
Anti-Graffiti
1 contract wonlatest 30 Sept 2026£283,200
total awarded
- 5
TMS ENVIRONMENTAL LTD
1 contract wonlatest 7 Sept 2026ends 30 Sept 2030£480,000
total awarded
Derwen Recycling Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Tai Tarian LtdKey Dates
Published
10 February 2026
Submission deadline
17 March 2026
Notice type
tenderUpdate
Source
find a tender
Related Tenders
Four lanterns network coordinator – art fund going places programme
Wrexham County Borough Council wish to commission a suitably qualified coordinator for the Four Lanterns Network, one of six UK-wide partnerships participating in Art Fund's Going
Framework for electrical installation and maintenance, including PAT and fixed wire testing
Mid and West Wales Fire and Rescue Authority on behalf of themselves and the Police and Crime Commissioner for Dyfed Powys Police is seeking to engage electrical contractors to car
High quality cafe furniture
High quality contemporary external cafe furniture comprising chairs and matching tables, suitable for installation within a publicly accessible outdoor space and intended to remain
POW-ITT-64317 FLAT ROOF FOR monnow WARD, bronllys community hospital
Powys Teaching Health Board (PTHB) require the replacement of the existing flat roof covering over Monnow Ward at Bronllys Community Hospital, Brecon. The existing waterproofing sy
