NRW All Wales Mountain Bike Trail and Maintenance Framework
Natural Resources WalesEstimated Value
Up to £2,000,000
Deadline
Not specified
Published
23 June 2026
Type
Not specified
Full Description
NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots.
Lot 1 – Mountain Bike Trail Maintenance Works
Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:
- Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor.
- Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk.
- Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager.
- Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure.
- Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities.
- Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements.
Lot 2 – Mountain Bike Trail Design and Construction
Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include:
- Detailed trail design.
- Securing all necessary permissions, approvals, consents and licences required for project delivery.
- Corridor clearance and construction of trails to the specification and grading requirements defined by the Client.
- Testing, commissioning and certification that the completed works are fit for purpose.
- Formal handover of completed trails and associated documentation to the Client.
Requirements
- Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor.
- Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager.
- Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities.
- Securing all necessary permissions, approvals, consents and licences required for project delivery.
- Corridor clearance and construction of trails to the specification and grading requirements defined by the Client.
Site Viewing
Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to:
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
GMD Forestry Ltd
8 contracts wonlatest 2 Oct 2026£79m
total awarded
- 2
Jimmy Hughes Services Ltd
8 contracts wonlatest 12 Aug 2026ends 31 Aug 2030£79m
total awarded
- 3
Beacons Tree Services Ltd
7 contracts wonlatest 2 Oct 2026ends 28 Feb 2030£63m
total awarded
- 4
A.J.Butler Contracting Ltd
7 contracts wonlatest 10 Jul 2026ends 5 Jan 2034£81m
total awarded
- 5
Cwm Agricultural Ltd
6 contracts wonlatest 12 Aug 2026ends 5 Jan 2034£20m
total awarded
GMD Forestry Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Natural Resources WalesKey Dates
Published
23 June 2026
Submission deadline
Not specified
Notice type
planning
Source
find a tender
Related Tenders
Proposed residential development at land adjacent to bro dawel, solva, pembrokeshire, SA62 6TZ
ateb are seeking to appoint a single experienced contractor to design and construct the Solva development, including the associated football pitch and external works. The project c
BCU-ITT-64220 - substation 4 switchgear upgrade -WMH
Betsi Cadwaladr University Health Board requires a suitably qualified and experienced electrical engineering contractor to undertake the phased replacement and upgrade of the Low V
Framework for electrical installation and maintenance, including PAT and fixed wire testing
Mid and West Wales Fire and Rescue Authority on behalf of themselves and the Police and Crime Commissioner for Dyfed Powys Police is seeking to engage electrical contractors to car
WAS-ITT-62703 - C1 driver training tender
NWSSP on behalf of WAST requires suitably qualified and accredited C1 driver training providers to deliver training and testing services to a variable cohort of learners. Training
