MTIB – Design and Installation of an Integrated Smart Local Energy System (SLES)
The Merthyr Tydfil Institute For The BlindEstimated Value
Up to £388,840
Deadline
2 November 2026
19 days remaining
Published
13 October 2026
Type
Not specified
Overview
The Merthyr Tydfil Institute for the Blind (MTIB), a registered charity and social enterprise based in Pentrebach, Merthyr Tydfil, is seeking to appoint a suitably qualified and experienced Principal Contractor to design, supply, install, integrate, test and commission a fully operational Smart Local Energy System (SLES) at its premises. The project is supported by the Welsh Government Ynni Cymru Capital Grant Funding Programme and aims to reduce energy costs, improve energy efficiency, lower carbon emissions and support the long-term sustainability of MTIB, which provides supported employment and employability opportunities for blind, disabled and disadvantaged people.
The proposed works comprise the installation of approximately 108.36 kWp of rooftop solar photovoltaic generation, a battery energy storage system with approximately 197 kWh storage capacity and 50 kW power conversion capability, a variable refrigerant flow (VRF) air source heat pump system with an indicative heating capacity of 60 kW and a minimum seasonal coefficient of performance of 4.0, four 22 kW AC electric vehicle charging outlets, one 50 kW DC rapid charger, and an integrated smart energy management and monitoring system. The successful contractor will be responsible for the complete delivery of the project, including site surveys, structural assessments, system design, equipment procurement, electrical and civil engineering works, Distribution Network Operator applications and approvals, planning and building regulations requirements where applicable, subcontractor coordination, installation, integration, testing, commissioning, certification and handover.
All works must comply with applicable UK legislation, relevant British Standards, electrical installation regulations, Construction Design and Management Regulations 2015, manufacturer requirements and recognised industry standards. The contractor must demonstrate appropriate technical competence, experience and resources to deliver a fully integrated renewable energy installation within the required programme.
Regulations cited
- Management Regulations 2015
Submission
All tender clarification questions must be submitted through Sell2Wales by the published clarification deadline.
Additional details
The completed system must include suitable monitoring, metering and energy optimisation capabilities, together with operating manuals, maintenance information, warranties, certification and staff training. MTIB intends to appoint a single Principal Contractor with overall responsibility for managing and coordinating all elements of the works.
The project is subject to a strict funding deadline. All installation works, testing, commissioning, outstanding defects and snagging, compliance documentation, formal handover, MTIB sign off and final invoicing must be completed by 31 March 2027.
The maximum available project budget is GBP 388840 excluding VAT. Contract award will be subject to final confirmation of funding and completion of the necessary procurement approvals.
A mandatory pre tender site visit will be required. Full technical specifications, contractual requirements, evaluation criteria and tender submission instructions are provided within the accompanying tender documentation.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Procurement Portal
Open the original notice
Click the button below to view this tender on the official portal
Find submission instructions
Look for "How to apply" or "Submission" sections in the notice
Register on the portal
Create a free account on the buyer's procurement platform
Download tender documents
Download all specifications, templates, and pricing schedules
Submit before the deadline
Complete all documents and submit through the portal — do not email unless explicitly instructed
Always check the official notice for the exact submission method and deadline.
Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Buyer Profile
The Merthyr Tydfil Institute For The BlindKey Dates
Published
13 October 2026
Submission deadline
2 November 2026
Notice type
Contract notice
Source
sell2wales
Related Tenders
Cynllun caffael strategaeth cyflenwad dŵr cwm taf - caffael uniongyrchol i gwsmeriaid (DPC)
Dŵr Cymru (DCWW) yw'r cwmni dŵr a charthffosiaeth mwyaf yng Nghymru a'r chweched mwyaf sy'n gweithredu yng Nghymru a Lloegr. Mae’n gyfrifol am ddarparu dŵr yfed o ansawdd uchel i d
Reconfiguration and refurbishment of tylorstown welfare hall and institute
The client is seeking the involvement of a Main Contractor to carry out the transformational re-development of the Grade II listed hall. Steeped in local heritage and civic pride,
Pontsticill landslip remedial works
Bydd Cyngor Bwrdeistref Sirol Merthyr Tudful yn ceisio tendrau gan gontractwyr profiadol ar gyfer gwaith adfer tirlithriadau Pontsticill. Bydd y gwaith yn cynnwys y cynllun a'r cyn
002468 - Contract for fleet equipment maintenance and potential repair
Durham County Council (DCC) have a requirement for the ongoing maintenance, calibration, and potential repair of all workshop equipment across all four of their workshops. The flee