Morridge Hill Country Habitat Restoration Tender
Peak District National Park AuthorityEstimated Value
Up to £38,275
Deadline
6 June 2025
Published
19 August 2025
Type
Not specified
Full Description
Morridge Hill Country (MHC) is one of DEFRA's Landscape Recovery Projects and is located within the South West Peak of the Peak District National Park. It is an ambitious landscape scale project with nature recovery at its heart.
Whilst the area is already relatively biodiverse compared to other parts of the country, there are significant opportunities here to restore ecosystems and increase resilience to change, and in doing so providing many additional benefits.
As part of the 20-30 year vision for MHC we are exploring opportunities to
- diversify currently species-poor and depleted vegetation, including grasslands, mires, heaths etc.
- restore a more natural hydrologically functioning landscape.
We are therefore seeking updated vegetation survey of the extent and condition of the in-bye land across c.865ha together with Hydrological study and associated field survey. These surveys will inform recommendations for habitat restoration across the landscape (Opportunity mapping reports).
Scope and requirements for each site
- Updated survey of the extent and condition of vegetation types currently present across the area
- Across the sites, map the current extent and type of the vegetation together with supporting habitats such as open water.
- Boundaries of the main vegetation types in each field should be recorded and registered with the appropriate NVC code.
- Hydrological study and field survey :
A: Study
- Review of existing surveys;
- Review of the hydrogeology/soils;
- Review existing data pertaining to drainage;
- Sub surface drains;
- Wetness index.
B: Field survey
- Undertake field survey of all hydrological features identified through the desk review process.;
- Each feature should be given a unique mapped identifying code;
- Individual parameters for each feature should be recorded as shown in the example spreadsheet provided at Appendix B or as otherwise agreed;
- Undertake soil profile augers/probes where considered necessary;
- Undertake soil moisture and compaction measurements (e.g soil penetrometer) where considered necessary;
- Undertake any pH and conductivity measurements where considered necessary.
- Opportunity mapping document:
Brief opportunity mapping report for each site. This should pull together all the above information to identify opportunities for habitat restoration to include:
- Likely outcomes on Proposed Hydrological regime and how this will differ from the current situation (including completed spreadsheet Appendix B*);
- Specifications for suggested works and methodology;
- Likely changes to vegetation, species composition and condition with reference to NVC types where appropriate;
- Details and specification for all methods proposed for introduction of plant species;
- Identify any additional benefits to the works;
- Steps in the process to such a recovery;
- Likely impacts on the site and surrounding land;
- Consider partial restoration scenarios and likely outcomes;
- Schedule of works and Costings to achieve the above.
Maps
- Map to show wetland conceptualisation plan showing likely influence of works and locations and type of hydrological interventions;
- Before and after maps to show water supplies and drainage networks-includes routes of water into and out of areas;
- Map to show current habitat types (with NVC notation);
- Map to show potential habitat change as result of proposals;
- Map to show where areas could be planted or seeded with 'missing' plant components relative to the target vegetation type including higher plants and sphagnums;
- Constraints map
- Map showing any infrastructure required to enable landscape management.
Timescales
This is a time sensitive project, we are looking for this work to be completed as soon as possible. All surveys must be completed by the 30th September 2025.
Draft reports must be provided by 15th October 2025
Final report must be provided by 30th October 2025
All other outputs (data) associated with the Brief must be provided by 30th October 2025 (the Target Completion Date).
Please see the Invitation to Tender Brief and associated documents for further details
Requirements
- Specifications for suggested works and methodology;
- Details and specification for all methods proposed for introduction of plant species;
- Map showing any infrastructure required to enable landscape management.
This is a time sensitive project, we are looking for this work to be completed as soon as possible. All surveys must be completed by the 30th September 2025.
Draft reports must be provided by 15th October 2025
Final report must be provided by 30th October 2025
All other outputs (data) associated with the Brief must be provided by 30th October 2025 (the Target Completion Date).
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
WARDELL ARMSTRONG LLP
£38,275
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
T.S.L. CONTRACTORS LTD.
£6m
total awarded
- 2
A. H. HELICOPTER SERVICES LIMITED
£3m
total awarded
- 3
CONSERVEFOR LIMITED
£7m
total awarded
- 4
ENVIRONMENTAL LAND MANAGEMENT SOLUTIONS LIMITED
£7m
total awarded
- 5
Michael Wynne
2 contracts wonlatest 16 May 2026ends 21 Sept 2031£7m
total awarded
T.S.L. CONTRACTORS LTD. is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeStart free trial to downloadCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Peak District National Park AuthorityKey Dates
Published
19 August 2025
Submission deadline
6 June 2025
Notice type
award
Source
find a tender
Related Tenders
Design and installation of the east midlands pavilion at ukreiif 2027
This Team East Midlands opportunity is advertised to set out the mandatory and required services, Deliverables, standards, outputs and outcomes for the design and installation of t
The provision of services for all victims of domestic abuse in derby city
The Police and Crime Commissioner for Derbyshire is looking for a provider to deliver support services to all victims of domestic abuse in Derby City.
Urban design consultancy
Our Planning and Development Service is seeking an urban designer to work within our busy development management team. Your case load would comprise largely of volume house builder
Plumbing room workshop and classroom alterations at the roundhouse stephenson building.
DCG’s Estates team undertakes planned preventative maintenance each year to ensure that facilities meet required safety and operational standards to support Campus maintenance and
