Estimated Value
Up to £9,000,000
Deadline
14 October 2026
Published
19 August 2026
Type
Not specified
Overview
MEPH 1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner. 2.
Survey and report on condition of existing services in the Phase 1 areas that are being retained 3. Enabling works and decommissioning of Phase 1 works 4.
CCTV Survey of existing drainage/rainwater stacks 5. Above ground soil & waste drainage consisting of new pipework, thermal and acoustic insulation, chlorination and treatment 6.
Additional details
Above ground rainwater drainage system consisting of new pipework, thermal and acoustic insulation, sump pump 7. Supply and installation of sanitaryware including, but not limited to WCs, sinks, taps 8.
Domestic cold water services including mains supply, boosted distribution, storage tank, booster set, pumps, conditioner, trace heating, leak detection and insulation 9. Water booster set located in the 'Strands vaults', provided as Part of Phase 1 is to be extended as part of Phase 2 works. 9.
Hot water plant and distribution pipework including insulation 10. Low temperature hot water (LTHW) heating systems 11.
Dry riser system 12. Water treatment, flushing & chlorination 13.
Specialist water treatment / humidification systems (RO plant) 14. Pipework insulation & trace heating 15.
Chilled water systems 16. Heat pump plant & associated infrastructure 17.
Underfloor heating systems 18. Variable refrigerant flow (VRF) system including cooling units, controllers, refrigerant & condensate pipework distribution, FCUs and insulation 19.
Refrigerant leak detection 20. Electric heating systems - radiant heaters and controls 21.
Gas installation to Kitchens 22. Boiler flue 23.
Meters - heat interface, water and gas. All meters shall be connected and monitored from the Courtauld's automated metering system. 24.
Liaison with Thames Water VENTILATION 1. Air handling units and heat recovery units 2.
Toilet extract fans 3. Attenuators including cross talk 4.
Fresh air intake ductwork 5. Exhaust ductwork 6.
Supply ductwork 7. Extract ductwork 8.
Kitchen fire rated ductwork 9. Diffusers, grilles and flexible connections 10.
Motorised fire / smoke dampers 11. Thermal Insulation 12.
Acoustic lining where required 12. Ductwork cleaning 13.
General fire rated ductwork 15. Volume control dampers 15.
Variable air volume (VAV) systems 16. Smoke extract and smoke control systems 17.
Natural ventilation controls & actuated windows 18. Air handling plant ancillary equipment 19.
Ceiling and wall fans within East wing & Library ELECTRICAL 1. Survey, isolate, strip out and dispose of relevant existing services in a safe manner. 2.
Survey and report on condition of existing services in the Phase 1 areas that are being retained 3. Enabling works and decommissioning of Phase 1 works 4.
Liaison with UKPN for their works involving upgraded supply 6. LV switchgear 7.
Distribution boards 8. Sub-main cabling distribution 9.
Sub-metering 10. Busbar systems 11.
Life safety LV cable distribution 12. Life safety emergency lighting cable 13.
Primary and secondary containment 14. Mechanical power supplies 15.
Power supplies for specialist systems 16. Floor boxes 17.
Isolators 18. Sockets 19.
General lighting systems 20. Emergency lighting systems 21.
Lighting Control including cabling 22. Transformer enclosures 23.
Hook up connection to be utilised for a generator to provide temporary power for changeover of UKPN supply 24. Energy metering & monitoring 25.
Main equipotential bonding 26. Earthing to lift shafts 27.
Surge protection 28. Electromagnetic screening 29.
Automatic Transfer Switches (ATS) including mimic panels for evacuation lifts. MEP COMMON 1.
Plant handling and movement 2. Testing & commissioning 3.
Interfaces & overall systems integration 4. Bracketry and secondary steelwork 5.
O&M manuals 6. Labelling and identification 7.
Integrated and black building testing 8. Integrated systems testing (IST) 9.
BREEAM requirements 10. Surveys and validations 11.
Final clean 12. Temporary protection 13.
Inertia bases 14. Client training 15. 12 month warranties 16.
Samples 17. Soft landings 18.
Noise & vibration control 19. Seasonal commissioning 20.
Fire protection pillows within containment 21. Intumescent Putty Pads (supply and install) / Hockey Sticks (supply and free issue to Dryliner) 22.
Fire Stopping and Fire Collars to all penetrations of 50mm x 50mm or less through all walls or floors (including concrete). 23. Existing services being retained 24.
Arrange lift & shift equipment 25. BWIC up to 50mm 26. Big foot system and hop overs
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
KILNBRIDGE CONSTRUCTION SERVICES LTD.
£6m
total awarded
- 2
BOVIS CONSTRUCTION (EUROPE) LIMITED
£5m
total awarded
KILNBRIDGE CONSTRUCTION SERVICES LTD. is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Useful Resources
Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Buyer Profile
COURTAULD INSTITUTE OF ARTKey Dates
Published
19 August 2026
Submission deadline
14 October 2026
Notice type
tender
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council currently occupies Wisma Great Eastern, Penang - No. 25, Lebuh Light, 10200 Level 3A, Suite 3A.1. The British Council is required to fitout the premises to reco
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national