Materials Recovery Facility (MRF) design and build project - Lancashire Renewables

LANCASHIRE RENEWABLES LIMITED

Estimated Value

Not specified

Deadline

Not specified

Published

21 August 2026

Type

Not specified

North WestGB

Full Description

Lancashire Renewables Limited (LRL) operates and manages two waste treatment facilities on behalf of its public sector shareholders. LRL is undertaking a strategic review of the Materials Recovery Facility (MRF) at Farington Waste Recovery Park, Sustainability Way, Leyland, PR26 6TB.

The existing MRF was commissioned approximately 15 years ago. It processes dry mixed recyclables but is increasingly constrained by its design capacity, ageing infrastructure, process bottlenecks, variable output quality and limited ability to recover additional materials. LRL currently manages approximately 65,000 tonnes per annum of dry mixed recyclables, of which approximately 50,000 tonnes per annum can be processed at Farington; the balance is diverted off site. The existing plant operates at an estimated average throughput of approximately 16 tonnes per hour and does not currently target paper, card, cartons or flexible plastics as separate output streams.

Changes to waste composition, end-market quality requirements and national policy initiatives, including Extended Producer Responsibility, the Deposit Return Scheme and Simpler Recycling, create a need for greater capacity, recovery, quality and flexibility. LRL has recently concluded an independent feasibility study assessing three strategic options: refurbishment of the existing MRF; construction of a new advanced MRF; and a hybrid solution combining a new MRF with redevelopment of the existing plant. The study identifies a new MRF as the most robust long-term option, while recognising the higher capital requirement and the need for further design and commercial validation.

LRL is therefore undertaking preliminary market engagement to substantiate the feasibility study's principal cost, programme, technical and delivery assumptions before further developing a business case for its Shareholders. LRL's earlier high-level market understanding indicated a potential new-MRF cost in the region of £13-15m, whereas the independent feasibility assessment produced an indicative total project cost closer to £20m and a delivery period of approximately 3-4 years. The cost figures are not a budget, target price or statement of affordability.

At this stage, LRL would like to formally engage with experienced MRF designers and builders, process-equipment integrators, principal contractors and organisations capable of turnkey, EPC or EPCM delivery. Consortium or supply-chain responses are welcome where the proposed team can demonstrate an integrated route to delivery.

The indicative project requirements and outputs from a future MRF build project are to

  • Provide a resilient facility capable of processing LRL's forecast dry mixed recyclables, currently considered to be broadly 64,000 to 67,000 tonnes per annum, subject to validation.
  • Enable full or materially increased on-site processing and reduce reliance on off-site diversion.
  • Improve recovery rates, output purity and revenue potential across plastics, ferrous and non-ferrous metals, glass and fibre streams.
  • Provide a credible approach to flexible plastics, cartons, paper and card, taking account of evolving collection systems, legislation and end markets.
  • Make effective use of the existing building shell and available site infrastructure where practicable, including existing power and utilities, while identifying upgrades if required.
  • Maintain safe, compliant and efficient operations and minimise interruption to the existing MRF during delivery and transition.
  • Include appropriate process control, data, automation, optical sorting, AI-enabled monitoring or robotics where technically and commercially justified.
  • Provide suitable redundancy, maintainability, access, storage and future flexibility.

The purpose of this engagement is to obtain current market evidence sufficient to inform LRL's business case, preferred technical option, delivery strategy and any subsequent procurement. It is not a call for competition, invitation to tender or request for a developed design.

The engagement is intended to operate in two stages: an initial, light-touch expression of interest followed by site visits and structured post-visit feedback from selected participants. More detailed market views will be sought only after participants have received further context.

LRL intends to use the engagement to

  • Test the likely total project cost and the principal components of that cost;
  • Understand what a proportionate, value-for-money technical solution would look like for the site;
  • Understand realistic project development and delivery timescales;
  • Identify the main technical, commercial, programme, operational, planning, permitting and interface risks;
  • Understand preferred contracting and risk-allocation models;
  • Identify information required from LRL to enable a future market to price and programme the project with confidence;
  • Ultimately, assess market capability, capacity and interest in a potential future procurement to build a new MRF at LRL's Leyland facility.

The contract dates provided are indicative placeholders for system compliance purposes only. Actual contract dates will be determined upon completion of this PME exercise and will be subject to subsequent business case approval.

Requirements

  • Make effective use of the existing building shell and available site infrastructure where practicable, including existing power and utilities, while identifying upgrades if required.
  • Identify information required from LRL to enable a future market to price and programme the project with confidence;

Site Viewing

The engagement is intended to operate in two stages: an initial, light-touch expression of interest followed by site visits and structured post-visit feedback from selected participants. More detailed market views will be sought only after participants have received further context.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Likely incumbents

Suppliers who won similar work from this buyer in the last 5 years.

5 found
  1. 1

    MELCOURT INDUSTRIES LIMITED

    1 contract wonlatest 6 Oct 2026CH 01734220

    £1m

    total awarded

  2. 2

    TMA BARK SUPPLIES LIMITED

    1 contract wonlatest 6 Oct 2026CH 04597067

    £1m

    total awarded

  3. 3

    HOVERDALE UK LIMITED

    1 contract wonlatest 24 Sept 2026CH 06720334

    £339,000

    total awarded

  4. 4

    ALKALI ENVIRONMENTAL LIMITED

    1 contract wonlatest 8 Jul 2026ends 31 Jul 2029CH 11309998

    £800,000

    total awarded

  5. 5

    ASSURED ENVIRONMENTAL SERVICES LIMITED

    1 contract wonlatest 2 Jun 2026CH 05266009

    £100,000

    total awarded

MELCOURT INDUSTRIES LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

LANCASHIRE RENEWABLES LIMITED
Typepublic body
RegionUKD45
Total tenders11
Total spend£18,387,000
View buyer profile

Key Dates

Published

21 August 2026

Submission deadline

Not specified

Notice type

planning

Source

find a tender

Similar

Related Tenders