Awarded
ocds-h6vhtk-046d45 · award

London Construction Programme Major Works Education Framework MW24-E

London Borough of Haringey

Estimated Value

Not specified

Deadline

Not specified

Published

28 July 2025

Type

works

LondonGBopenCPV: 45000000
CategoryConstruction

Overview

The London Construction Programme (LCP) was established in 2012 by Haringey Council, supported by other London Local Authorities, to develop a pan-London strategy to improve construction procurement. The LCP is a 'virtual organisation' currently hosted and operated by Haringey Council's Strategic Procurement Team, led by the Chief Procurement.

The LCP currently has a membership of 60 London and Home County Public Sector organisations. A new Framework is required to replace the current LCP Framework (MW19) which expired in December 2024.

The new Framework is to provide construction related activities for Education provisions covering Planned maintenance, Fire safety, Retrofit and Refurbishments. The works will be procured in 8 lots: Lot 1.1 New Build £1m-£5m contract value Lot 1.2 New Build £5m+ contract value Lot 1.3 Single Stage tendering, £1m+ contract value Lot 1.4 Modern Methods of Construction, (no minimum contract value) Lot 2.1 Retrofit, refurbishment, adaptations and remediations £1m-£5m Lot 2.2 Retrofit, refurbishment, adaptations and remediations £5m+ Lot 3.1 Planned component replacement works and fire safety works £1m-5m Lot 3.2 Planned component replacement works and fire safety works £5m+ The Framework will be established for a period of 5 years and will be available to any public sector body in London and the Home Counties.

Key dates

Duration
5 years

Additional details

LCP awarded reserved places for micro-, small-, medium- and large-enterprises on different Lots in order to encourage SMEs and provide choice for its Clients. The Reserve List will also be used for this framework for those Tenderers who are unsuccessful in being awarded a place on the main Lots who qualified to met the minimum quality criteria.

The framework will be established with four main objectives in mind:- 1. To support its Clients to deliver on their net zero commitments in the following areas:- • Biodiversity assets • Climate Change adaptation • Zero Carbon Supply Chain • Low Carbon Transportation • Operational Low Carbon 2.

To provide a fast and efficient route to market for education schemes across London and the Home Counties that offers value for money. 3. To drive positive change in mental health and equality, diversity and inclusion in the construction sector. 4.

To apply best practice, unlock innovation and work collaboratively with its Client and the Supply Chain. Lot 1.1 is for new build education buildings, for contracts between £1m-£5m.

Lot 1.2 is for new build education, contract values of £5m or more Lot 1.3 is for new build education, procured by single stage tendering, for contract values of £1m or more

Lot 1.4 New Build education buildings using Modern Methods of Construction, and Temporary Buildings (no minimum contract value) Lot 2.1 Retrofit, refurbishment, adaptations and remediations for contracts worth £1m-£5m

Lot 2.2 Retrofit, refurbishment, adaptations and remediations for contracts worth £5m+ Lot 3.1 Planned component replacement and fire safety works contract value £5m+ Lot 3.2 Planned component replacement and fire safety works for contract value £5m+

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Award Details

Alcema Limited

Alexander James Contracts Ltd

Ark Build Plc

Ashe Construction Ltd

Aston Heating Ltd

The Barnes Group Ltd

BAXALL CONSTRUCTION LIMITED

Boom Construction Ltd

Built Fitout and Refurbishment Ltd

City Axis Ltd

Equans Regeneration Ltd

Etec Contracts Services Ltd

Northstone (NI) Limited

Galliford Try Construction Limited

Graham Asset Management Limited

H. A Marks Ltd

Helix Construct Ltd

Hollington & Sons (Builders) Ltd

Houghton and Son Ltd

Jerram Falkus Construction Ltd

John Graham Construction Ltd

Kind Diamond Build Consortium Ltd

Longley Group Ltd

Mac Zero Modular Buildings Limited

Management & Construction Services Ltd

McAvoy Modular Offsite Ltd

Mulalley & Co Ltd

MY Holdings Group Ltd

Neilcott Construction Ltd

Redec Limited

Reds10 (UK) Limited

Rooff Construction Limited

Spacemaker Developments Ltd

T & B (CONTRACTORS) LIMITED

Thomas Sinden Ltd

THURSTON GROUP LIMITED

Vision Built Structures Ltd

Wernick Buildings Ltd

Western Building Systems Ltd

Likely incumbents

Suppliers who won similar work from this buyer in the last 5 years.

5 found
  1. 1

    DCK Construction Ltd

    4 contracts wonlatest 8 Sept 2026ends 30 Mar 2028

    £8m

    total awarded

  2. 2

    Connect Lettings and Management

    1 contract wonlatest 29 Sept 2026CH 03900592

    £102,599

    total awarded

  3. 3

    Topcoat Construction Limited T/A TCL Group

    1 contract wonlatest 15 Sept 2026ends 4 Jan 2029

    £94,398

    total awarded

  4. 4

    PRB Estates Ltd

    1 contract wonlatest 10 Sept 2026CH 4115370

    £13m

    total awarded

  5. 5

    Mulalley and Company Limited

    1 contract wonlatest 10 Sept 2026CH 1534913

    £59m

    total awarded

DCK Construction Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

London Borough of Haringey
Typepublic body
RegionLondon
Total tenders405
Total spend£4,907,319,910
View buyer profile

Key Dates

Published

28 July 2025

Submission deadline

Not specified

Notice type

award

Source

find a tender

Similar

Related Tenders

L
Open
1060154001 · Tender Notice

Stratford park games court refurbishment

London Borough of Newham
WorksLondon

This contract is for the refurbishment of the games court at Stratford Park in Newham, London. It is aimed at contractors who can carry out the repair and upgrade of the sports surface and related fittings.

£On request
Posted · 1mo agoView details →
L
Open
ocds-h6vhtk-04e6d8 · tenderUpdate

London construction programme general works framework MW25-GW

London Borough of Haringey
worksLondon

The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multi

£Up to £3,000,000,000
Posted · 3mo agoView details →
N
Open
networkrail:60952 · Procurement Act – Competitive Flexible

#43028 - IPDR turbostar onboard ETCS fleet fitment contract

Network Rail Infrastructure Ltd
worksLondon

The railway industry is entering a transformative era as it transitions from traditional lineside signalling to a digitally enabled network. Network Rail is introducing digital sig

£Up to £234,000,000
⏱ 19 Jun 2028
Posted · recently617d to apply →
C
Open
c2c-rail:61287 · Procurement Act – Competitive Flexible

Basildon station 603 platforms renewal - detailed design and build (GRIP 5-8)

c2c Railway Limited
worksLondon

c2c Railway Ltd (c2c) holds a 99-year lease from Network Rail for Basildon Station, in which they are responsible for the operation, maintenance and renewal of station assets. Basi

£Up to £20,000,000
⏱ 20 Oct 2026
Posted · recently9d to apply →