System operational · UK tenders
closed
2e5af921-ccbf-43a6-a339-e7adf38843f3 · tenderAmendment

London Construction Programme (LCP) Works Contractor Framework 2018

London Borough of Haringey

Estimated Value

Not specified

Deadline

19 November 2018

Published

8 September 2018

Type

works

SME SuitableLondonGBCPV: 45000000
CategoryConstruction

Overview

Text to be corrected in the original notice: Place of text to be modified: II.2.4 Instead of: The lot category will cover Education and Leisure projects in the following sub categories: £1-£5m GBP (split into central, north, east, south and west London), £5-£10m GBP (pan London) £10-£20m GBP (pan London) and over £20m GBP (pan London). The works and services will comprise of all types of building construction works and associated mechanical, electrical and services works and may include design and other services as required for a develop and construct/refurbishment /turnkey or design and build works project.

Read: The lot category will cover Housing and Residential projects in the following sub categories: £1-£5m GBP (split into central, north, east, south and west London), £5-£10m GBP (pan London) £10-£20m GBP (pan London) and over £20m GBP (pan London). The works and services will comprise of all types of building construction works and associated mechanical, electrical and services works and may include design and other services as required for a develop and construct/refurbishment /turnkey or design and build works project.

Other additional information: The purpose of the PIN is to inform the market of the upcoming tendering exercise If you are interested in participating you should follow the steps below. LCP is using the Delta e-sourcing to run the market engagement exercise.

Submission

The completed Questionnaire is to be submitted no later than 5 pm on 20th September 2018 via the Delta portal.

Additional details

Interested parties will be able to access the market engagement documentation on the Delta portal at: https://www.delta-esourcing.com/tenders/UK-UK-Wood-Green:... To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/6929T6JWQY The information and/or documents for this opportunity are available on https://www.delta-esourcing.com (Access Code: 6929T6JWQY). Haringey Council as the Contracting Authority is planning to put in place a new Major Works Framework for the delivery of housing, education & leisure, capital projects, historical & heritage and highway & public realm projects to be utilised by members of the London Construction Programme (LCP).The new framework will replace the existing arrangement which expires in May 2019.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Likely incumbents

Suppliers who won similar work from this buyer in the last 5 years.

5 found
  1. 1

    DCK Construction Ltd

    4 contracts wonlatest 8 Sept 2026ends 30 Mar 2028

    £8m

    total awarded

  2. 2

    EQUANS regeneration Limited

    2 contracts wonlatest 10 Sept 2026CH 1738371

    £52m

    total awarded

  3. 3

    T&B (Contractors) Ltd

    2 contracts wonlatest 5 Dec 2025CH 01667869

    £901,129

    total awarded

  4. 4

    Connect Lettings and Management

    1 contract wonlatest 29 Sept 2026CH 03900592

    £102,599

    total awarded

  5. 5

    Topcoat Construction Limited T/A TCL Group

    1 contract wonlatest 15 Sept 2026ends 4 Jan 2029

    £94,398

    total awarded

DCK Construction Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open noticeStart free trial to download

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Contracts Finder

Visit
1

Open the original notice

Click the button below to view this tender on Contracts Finder

2

Find the submission method

Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)

3

Create an account

Register on the eSourcing platform for free — you'll need a company email and DUNS number

4

Download tender documents

Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates

5

Submit your response

Upload completed documents through the portal before the deadline — late bids are automatically rejected

Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.

Buyer Profile

London Borough of Haringey
Typepublic body
RegionLondon
Total tenders405
Total spend£4,907,319,910
View buyer profile

Key Dates

Published

8 September 2018

Submission deadline

19 November 2018

Notice type

tenderAmendment

Source

contracts finder

Similar

Related Tenders

L
Open
1060154001 · Tender Notice

Stratford park games court refurbishment

London Borough of Newham
WorksLondon

This contract is for the refurbishment of the games court at Stratford Park in Newham, London. It is aimed at contractors who can carry out the repair and upgrade of the sports surface and related fittings.

£On request
Posted · 1mo agoView details →
L
Open
ocds-h6vhtk-04e6d8 · tenderUpdate

London construction programme general works framework MW25-GW

London Borough of Haringey
worksLondon

The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multi

£Up to £3,000,000,000
Posted · 3mo agoView details →
N
Open
networkrail:60952 · Procurement Act – Competitive Flexible

#43028 - IPDR turbostar onboard ETCS fleet fitment contract

Network Rail Infrastructure Ltd
worksLondon

The railway industry is entering a transformative era as it transitions from traditional lineside signalling to a digitally enabled network. Network Rail is introducing digital sig

£Up to £234,000,000
⏱ 19 Jun 2028
Posted · recently617d to apply →
C
Open
c2c-rail:61287 · Procurement Act – Competitive Flexible

Basildon station 603 platforms renewal - detailed design and build (GRIP 5-8)

c2c Railway Limited
worksLondon

c2c Railway Ltd (c2c) holds a 99-year lease from Network Rail for Basildon Station, in which they are responsible for the operation, maintenance and renewal of station assets. Basi

£Up to £20,000,000
⏱ 20 Oct 2026
Posted · recently9d to apply →