The following summary is not intended as a complete or definitive specification of the requirement. A purpose of this engagement is to seek information from the market to help refine our understanding and aid the development of a future specification.
STEP is currently in its Concept Design phase, which is expected to be completed by 2026. The electrical infrastructure of STEP will resemble that of large conventional thermal power stations; however, its design presents unique challenges: Fusion power stations like STEP have exceptionally large parasitic (auxiliary/house) loads required to initiate and sustain fusion reactions—significantly higher than those in conventional power plants.
These parasitic loads must be supplied by external sources during plant start-up, before the power generation cycle begins producing electricity. The highly dynamic nature of these loads could make compliance with grid code requirements challenging.
Additional details
For more information, please refer to: Staying positive: producing net power | Philosophical Transactions of the Royal Society A | The Royal Society UKIFS is seeking experts to support the technology selection of a Central Energy Storage System (CESS) that is part of the STEP Electrical infrastructure. Due to the power dynamics of operating the STEP power plant and the operating parameters set by the National Energy System Operator (NESO), an energy storage system is required to provide a mechanism to ensure that we remain within the NESO operating parameters.
Rather than a continuous output, STEP will operate on a pulsed basis. The power dynamics of the fusion pulses are typically different to a conventional power plant.
The CESS has been identified as a critical system to the design as it provides a mechanism to compensate for the changing load dynamics throughout the pulse. This will ensure STEP remains within the NESO defined operating parameters at the point of grid connection.
The scope of the CESS cannot be fully defined due to knowledge gaps in CESS behaviour and limitations. Once these are understood, a technology will be selected, and limitations will be incorporated into the electrical infrastructure design.
This PME is looking to address the knowledge gaps. The proposed technical and operations of the CESS are •2 operational cycles per day •Pulse length will be over 1 hour (continuous) •Power range larger than 300MW •Energy capacity 100-300MWh •Response in the millisecond range •Similar charge and discharge rates. •Fast response time during power swings (full charge to discharge) •High round trip efficiency: 80% In conjunction the CESS will be required to be operated and maintained for the 20-year life of the STEP machine. Due to the requirements, we are attempting to ascertain if this could be accomplished or partly accomplished by a non-battery-based system (Flywheel, Super-conducting magnetic storage (SMES), Capacitor, Super Capacitor, Fuel Cells or other) For more information about this opportunity, please visit the Delta eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-Culham:-Eng... To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/W8UFJUNW28
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Amentum Clear Energy Limited
1 contract wonlatest 16 Oct 2025ends 31 Mar 2026
Amentum Clear Energy Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
United Kingdom Industrial Fusion SolutionsKey Dates
Published
27 January 2026
Submission deadline
Not specified
Notice type
planning
Source
find a tender
Related Tenders
Extra care housing development - edinburgh house
NB: The Councils' high level requirements are summarised below with further important details included within the Procurement Documents accessible via https://supplier.in-tend.co.u
Carbine backup sights
The CNC requires Backup Iron Sights (BUS) to provide a reliable secondary sighting capability for its GR115 carbines. The BUS will be used alongside the CNC’s chosen primary sighti
Office facilities, HVAC & building services management for lifestone homes
Lifestone Homes Limited wishes to appoint an experienced M&E contractor to undertake varied statutory services of the group and its subsidiaries. The intention is to commence April
Grounds and hedges maintenance
Cut hedges located at the Recreation ground perimeter including PROW, carpark. Cut hedges by bus shelter. Gang Mowing Halstead Recreation Fertilise recreation field Weed treatment