Heat Network Technical Assurance Scheme (HNTAS) Scheme Operator
Department for Energy Security & Net ZeroEstimated Value
Up to £9,500,000
Deadline
Not specified
Published
15 May 2025
Type
Not specified
Overview
The Department for Energy Security and Net Zero (DESNZ) wishes to establish a contract for a Scheme Operator to operate the Heat Network Technical Assurance Scheme (HNTAS). In 2020, BEIS consulted on developing a regulatory market framework for heat networks to protect consumers, support market growth and develop low carbon networks.
Within this consultation views were sought on introducing mandatory minimum technical standards for heat networks. This proposal received strong support from respondents, as did the proposal that heat network suppliers should demonstrate compliance with technical standards through an accredited certification scheme.
The full consultation and market response can be found here: https://www.gov.uk/government/consultations/heat-networks... A further heat networks technical standards consultation is planned for 2025, responses to which will need to be taken into consideration for the implementation of the scheme and the proposed requirements of the HNTAS Scheme Operator. The Energy Act (2023) provides for Ofgem to be appointed as regulator of the heat networks sector and grants Ofgem the power to authorise individuals to operate heat networks and undertake supply activity.
Eligibility & compliance
Together, the technical specification and assurance processes represent normative documents, a set of documents describing what heat suppliers must do.
Contact & helpdesk
Further information can be found at Heat Network Technical Assurance Scheme (HNTAS) - GOV.UK We are looking for a supplier, or consortium of suppliers, to provide the following services: • Manage the overarching heat network technical assurance scheme • Maintain the code on behalf of the code manager, in accordance with Ofgem’s licence conditions • Liaise with a Training Provider and Certification Body to ensure the smooth operation of the assurance scheme • Secretariat to the Heat Network Technical Assurance Scheme Board, currently known as the Code Management Committee, and Executive staff • Committee administration • Keep the Heat Network Technial Assurance Scheme and Code Management Committee Terms of Reference up to date • Deal with any appeals or disputes arising from heat network operators, assessors or certifiers in relation to the scheme • Manage an online digital service; o Manage the registration of stakeholders and heat networks o Maintain the Heat Network Technical Assurance Scheme database of information on Heat Networks o Utilise the data collected for the effective running of the scheme • Conduct centralised audits and assessments • Provide wider sector support to aid the industry’s understanding of the scheme’s procedures and requirements • Manage communications to ensure regular updates and changes to scheme are communicated effectively to stakeholders • Promotion of the scheme to achieve early compliance • Develop and update content for guidance on the Heat Network Technical Assurance Scheme and the code • Providing support, including technical support, to heat network operators and assessors in cases where further guidance is needed Estimated Contract value: Likely to be up to £7m for initial term plus optional extension up to £2.5m Estimated Contract duration: potentially 2 years initial term plus optional 6 months + 6 months extensions Please answer the below question and send your responses to katsiaryna.addiego2@energysecurity.gov.uk by 5pm GMT on 17th April 2025.
Additional details
Ofgem will grant authorisation to a heat network operator, provided that the operator’s network meets certain authorisation conditions. The Energy Act provides for compliance with minimum technical standards to be included as one of these conditions.
This lays the foundation for technical standards secondary legislation which is expected to come into force in 2026 to introduce mandated minimum technical standards for heat networks (e.g. mandating requirements on water flow temperatures, pipe insulation, etc). The majority of heat networks (existing and new) across a range of different characteristics (large city sized district heating to single block communal networks) will be in scope of this requirement.
To promote compliance with these minimum technical standards, we are developing an assurance scheme: HNTAS. The technical specifications which set out the minimum technical standards that heat network operators will need to adhere to, and that will be subject to assurance, is being written and is expected to be completed in 2025.
Work is also underway to develop the assurance processes themselves, these being the procedures to assess compliance. Once legislation is in place, we intend to designate these normative documents as a Code, adherence to which will be required in regulation.
Heat networks are comprised of several elements (e.g. energy centre, district distribution network, communal distribution network, thermal substation, consumer connection and consumer heat system). Heat networks also have several stages within their lifespans (e.g. feasibility, design, construction, and operation and maintenance).
We expect the Code to set minimum technical standards for each of these elements and stages. In order for a heat network to be assured as having met the technical requirements in this rulebook, we intend that heat network operators will be awarded assessment passes by HNTAS licensed assessors once they have demonstrated that they have met the necessary standards.
HNTAS licensed certifiers will then need to certify that a network has met these standards across all relevant elements and stages. Assessor and certifier requirements and accreditation processes are currently in development.
DESNZ is currently overseeing a pilot to test the scheme on heat networks, with the pilot being run by a ‘Shadow Service Provider’. Lessons learnt from this pilot will be considered when finalising the requirements of the HNTAS Scheme Operator.
The Energy Act also provides for Ofgem to award a licence to a technical standards Code Manager. The Code Manager, as Ofgem’s licensee, is the entity that must carry out the requirements of that licence.
DESNZ are currently working to establish the form of legal entity that the code manager will take. The Code Manager may take the form of an incorporated entity, called HNTAS Ltd, which would be limited by guarantee.
The primary functions of the Code Manager include overall responsibility for HNTAS, operating the scheme, and maintaining the Code. The Code documents may comprise of technical specifications, assurance procedures and assessor requirements.
We expect that the Code Manager will subcontract many of these functions. We anticipate that DESNZ will procure the contract, with a possibility that the contract is novated or assigned to the technical standards Code Manager at a later date.
We anticipate that the contract would last for 2 years beginning in October 2025, with the options to extend for 6 months + 6 months at the end of year 2 and midway through year 3 respectively. The commencement of the contract is prior to the introduction of minimum standards, planned for 2026, in order to provide the necessary lead-in and setup time.
Interest: Are you provisionally interested in bidding for the contract we are looking to procure? If you would like to send any clarification questions, please use the email address above.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Aether Limited
£184,771
total awarded
- 2
United Kingdom National Nuclear Laboratory
£24m
total awarded
- 3
Energy Systems Catapult
£621,302
total awarded
- 4
YRD İstanbul Reklamcılık ve Danışmanlık Ticaret Anonim Şirketi
2 contracts wonlatest 6 Oct 2026ends 20 Nov 2026£845,026
total awarded
- 5
Version 1 Solutions Ltd
2 contracts wonlatest 19 Aug 2026ends 31 Aug 2029£100m
total awarded
Aether Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Department for Energy Security & Net ZeroKey Dates
Published
15 May 2025
Submission deadline
Not specified
Notice type
planningUpdate
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council currently occupies Wisma Great Eastern, Penang - No. 25, Lebuh Light, 10200 Level 3A, Suite 3A.1. The British Council is required to fitout the premises to reco
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national