Guildhall Mechanical CWP Design - 3 lots
The Mayor and Commonalty and Citizens of the City of LondonEstimated Value
£95,878 – £387,486
Deadline
18 September 2025
Published
28 January 2026
Type
Not specified
Overview
Please note the assessment summaries were initially sent out on 28/11/2025, however, due to an administrative error, they are being re-issued to bidders on 28/01/26 to ensure alignment with the publication of this UK6 Contract Award Notice. Therefore, the standstill period will commence 28/01/26.
Tender for mechanical design consultants across 3 packages across the Guildhall, split by building: North Wing & 65 Basinghall/GJR; East Wing; West Wing. This will result in design and project management of the cyclical works projects across the Guildhall.
This tendering exercise is being undertaken using the electronic tendering system ‘City of London Corporation Sourcing & Contracts Portal’ (https://cityoflondon.ukp.app.jaggaer.com/). Suppliers will need to register an interest on the system in order to participate and registration is free.
Lots (3)
- Lot 1£200,000
- Lot 2£200,000
- Lot 3£400,000
Key dates
- Commences
- 28/01/26
Additional details
The estimated contract value given at sections 31 and 32 is for the full duration of the contract including the maximum possible extensions. The Consultant for each lot is to provide professional services as defined in the respective applicable part of Section 3 Lot 1, 2 or 3 of this brief.
The lots will be split according the following principles: a. Generally the North Wing mechanical services are relatively modern, with plant maintained and upgraded since 2007 inter alia main AHUs upgraded in 2020, along with heating and BEMS upgrades between 2020 and 2024. ii.
Perimeter heating systems still require some control refinement. FCUs across the North Wing are due for replacement. iii.
Some design work has taken place to reduce cold spots. iv. Heating pipework has had some remedial work taking place due to leaks developing on galvanised steel pipework and fittings. v.
Kitchen ventilation systems are due to be upgraded, which could realise energy savings and potentially rationalise the hydraulic arrangement with regards to air flows and interlocks. vi. Domestic Hot Water Systems are to be replaced following capacity assessment along with shower valves in the Lower Ground Floor. vii.
The steam humidification system serving the main office was decommissioned some years ago. A design to reinstate a humidification system to the vent is to be provided, ideally retaining the existing AHU chassis, as these are not due for replacement. viii.
Overall, the plant replacement strategy has been to upgrade BEMS and now due to follow with emitters and make improvements along the way. ix. Chillers and pumps have been replaced as part of a major works project, which is currently on-site. x. 65 Basinghall Street is also known as Guildhall Justice Rooms or GJR. xi.
The old main CER room is located here and fed from the same chiller as the office area. xii. The chiller is to be decommissioned, a replacement service is to be designed and provided.
The CER xiii. The FCUs serving GJR are noted as being difficult to service and have 3P valves which create a by-pass which adversely affects return temperatures back to Citigen. b.
Lot 2 – Guildhall Yard East (GYE) i. There is currently a BEMS replacement project in pre-start phase with Sykes & Son on D&B contract. ii.
The Private part of the building is demised to the City Of London Police. There is a major refurbishment planned for this part of the building, which is currently in the design phase. iii.
Mechanical emitters are due for replacement across the Public side of the building. iv. Pumps serving both Public and Private areas have recently been replaced. v.
AHUs serving the Public areas were upgraded in 2021 along with the BEMS that controls them. vi. The general replacement/upgrade strategy for systems excluding the AHUs, is to replace and upgrade the emitters following on from the BEMS works. c.
Lot 3 – West Wing i. Mechanical systems are beyond end of working life and controlling the environment is extremely and increasingly challenging for FM to manage. ii.
Systems need to be replaced and upgraded to achieve another 5 years of useful life, as a minimum. iii. The BEMS is entirely on the legacy Continuum system and needs replacing. iv.
The chillers are life expired and currently due for replacement by connecting via PHX to North Wing under a separate project. v. The proposed strategy for mechanical replacement and upgrades, is to undertake rationalisation of systems to allow mechanical plant, emitters and controls to be replaced system-by-system.
Works should look to improve, rationalise and upgrade performance and control where possible. vi. The West Wing is Grade II listed and classed as a High-Risk Building.
The Consultant M&E Engineer shall fulfil the Lead Function including BRPD and PM. They have the duty and responsibility of co-ordinating and integrating the work of the other Consultants employed on the project to maintain the Programme on all items of works.
The other respective appointed Consultants will be responsible for the duties as defined in draft scope of service documents created by the Lead Consultant on an emergent basis. All consultants should be mindful of the interdependencies between disciplines and ensuring a smooth interface between co-dependent third parties. The COL Supervising Officer or Senior Principal Mechanical Engineer will take overall responsibility for design management and decision making across services.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Beveridge Associates Partnership Ltd
£189,679
Rybka Ltd
£95,878
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Softcat Ltd
£1m
total awarded
- 2
Ove Arup & Partners Ltd
5 contracts wonlatest 31 Jul 2026£39,420
total awarded
- 3
NorthSouth Consultants Ltd
£54,730
total awarded
- 4
Stace LLP
5 contracts wonlatest 12 Feb 2026£326,336
total awarded
- 5
BM Coaches & Rental Ltd
5 contracts wonlatest 29 Sept 2025£76,608
total awarded
Softcat Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
The Mayor and Commonalty and Citizens of the City of LondonKey Dates
Published
28 January 2026
Submission deadline
18 September 2025
Notice type
award
Source
find a tender
Related Tenders
Delivery of the uk-ireland youth forum 2027
Provision of services for the design, delivery and evaluation of the UK-Ireland Youth Forum 2027, including participant engagement, programme development, event management, safegua
ET89NFE92026 - inclusive leadership and governance training programme
Sustainable societal change requires institutions, communities and leaders that are equipped to work collectively to address complex social, governance and development challenges.
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
NHSE1114 sunderland APMS - CP
North of England Commissioning Support (NECS) is a commissioning support service working for and on behalf of NHS North East and North Cumbria Integrated Care Board (ICB) (NENC ICB
