GMCA 1185 Salford Road MRF Equipment
Greater Manchester Combined AuthorityEstimated Value
Up to £20,000,000
Deadline
17 October 2025
Published
30 September 2025
Type
Not specified
Overview
Under the national Resources and Waste strategy and requirements of Simpler Recycling policy, waste collection authorities (WCAs) that are part of the GMCA waste management arrangements will be required to make changes to current dry, mixed recycling (DMR) collections increasing the range of materials to be collected. The existing materials recovery facility (MRF) at Longley Lane, Sharston does not have the capacity or the sorting equipment required to process these additional materials.
GMCA (the Authority) is therefore looking to procure the design, build, installation, commissioning, and testing of new commingled dry recyclable material processing systems to be installed within the existing building at the Salford Road, Over Hulton, Bolton site to create a new Mechanical Recovery Facility (MRF). The Salford Road site building has previously operated as an In-Vessel Composting facility and most recently a Bio Transfer Loading Station.
The previous equipment has been removed and internal structure of the building refurbished to provide a clean operational space to accommodate new recyclable sorting equipment. On completion of the works the site will be able to process commingled dry recyclable material collected from households across Greater Manchester, with plant outputs in the form of loose material (glass) or baled recyclable materials, with a capacity 140,000 tonnes per annum of input commingled material.
Regulations cited
- Procurement Act 2023
Additional details
The new plant is expected to operate across two x 8 hours shifts daily (Monday - Friday) plus one additional 8-hour shift (Saturday). It is expected to employ one 8-hour daily cleaning shift (Monday - Friday).
Maintenance which cannot be completed with the plant "on-line" will be scheduled for non-operational periods, i.e. overnight and at weekends. The key objectives of the procurement are: • That the Works are executed with the highest regard for Health and Safety. • In considering Plant performance, the design and equipment selection shall consider the following objectives: o High equipment availability o High equipment reliability over the long term o Consideration of Capital vs Operational Costs to produce the lowest total cost of ownership o Minimising low-grade operator roles through the use of automated processes o The use of AI to enhance capture and purity rates of materials o Good access for maintenance, demonstrated through HAZOP and Access, Lifting and Maintenance workshops o Good design and access for regular cleaning o High capture rate and purity of Aluminium o High capture rate and purity of natural HDPE o High capture rate and purity of clear PET o High capture rate of glass o High capture rate of film o Flexibility in the design to allow for the future capture of new materials, or to adapt to changes in market specifications of existing materials (eg purity levels), or to allow integration of AI/automation Civil works do not form part of this procurement.
Following the Pre-Market Engagement Events, which were carried out on Monday 30th June 2025 and Wednesday 2nd July 2025, the Authority will now commence with the Competitive Flexible Procedure. The Authority reserves the right to issue updated versions (Modifications) of the documents to Suppliers as and when the need arises, in order to reflect the corresponding stage of the Competitive Flexible Procedure, together with any changes to the Procurement or any other new information.
The Authority also reserves the right following contract award, as reflected in Schedule 8 of the new Procurement Act 2023, to make various Modifications (unforeseen at this moment) as the contract evolves over the full term of the agreement. In order to bid for this procurement, interested parties must ensure they are registered on the Central Digital Platform (https://www.gov.uk/find-Tender) and the Chest e-tendering portal (www.the-chest.org.uk).
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
METRO DYNAMICS LIMITED
£268,065
total awarded
- 2
MARKETING MANCHESTER
£3m
total awarded
- 3
Bluestar Software Limited
4 contracts wonlatest 19 Feb 2026£119,580
total awarded
- 4
THE GROWTH COMPANY LIMITED
£76m
total awarded
- 5
HAYS SPECIALIST RECRUITMENT LIMITED
£176,200
total awarded
METRO DYNAMICS LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Greater Manchester Combined AuthorityKey Dates
Published
30 September 2025
Submission deadline
17 October 2025
Notice type
tenderUpdate
Source
find a tender
Related Tenders
Asset management and property management
You are invited to submit a response to this Request to Participate (RtP) for the provision of Asset Management and Property Management Services. This procurement is being conducte
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Provision of linen and laundry services
Provision of Linen and Laundry Services for NHS Trusts within Lancashire and South Cumbria. The Contracting Authorities are seeking a supplier or suppliers to provide comprehensive
Tfgm single view of the network
Transport for Greater Manchester (TfGM) is seeking a cloud-hosted, AI-assisted Intelligent Transport Systems decision-support platform. The platform is intended to bring together a