GB-Liverpool: Framework Agreement for Repairs, Maintenance, Gas servicing & Planned Works
Plus Dane Housing LimitedEstimated Value
Up to £2,500,000
Deadline
8 August 2018
Published
5 September 2018
Type
works
Overview
Plus Dane Housing intends to enter into a framework contract with a single service provider for a period of 4years. This will act as the umbrella agreement and establish the terms and conditions for contract award.
Thedelivery contract will be the ACA Standard form of contract for term partnering; TPC 2005 (incorporating 2013amendments) as amended. Work will be issued through periodic task orders and work issued in the final year ofthe framework may extend in to a 5th year.
Works are planned to commence in October 2018. There are 2 distinct ways in which work will be delivered: OJ/S S33 16/02/2018 71146-2018-EN - - Works - Contract notice - Restricted procedure 3 / 6 16/02/2018S33 http://ted.europa.eu/TED - - Works - Contract notice - Restricted procedure Supplement to the Official Journal of the European Union 3 / 6 Delivery method A: The service provider will act as a subcontractor to the Plus Dane repairs team (RT)delivering works on a job by job basis where required.
Eligibility & compliance
In the latter example the service provider will be required to coordinate deliveryof the required work with the RT and other contractors.
Additional details
Works issued under this method may be responsiveworks (covering occupied and non-occupied properties and common parts) or planned works. In someinstances, the service Provider is likely to carry out all of the works to a particular property whilst in others theywill carry out only elements of it.
Work issued under this method will be via an individualtask order. Delivery method B: The service provider will plan and deliver agreed programmes of work.
In this scenarioa 2 stage ordering approach will be used. Plus Dane will issue to the service provider a task order for eitheradefined batch, phase or entire works programme.
The service provider will use his experience to produce taskproposals for the works including a task price, task timetable, H&S plan (to coordinate with the Constructionphase health and safety plan produced by RT), and present this proposal to Plus Dane for consideration. Ifthe task proposals are acceptable then Plus Dane will issue a task commencement order and the serviceprovider will proceed to deliver the works in accordance with their proposals including inspecting/visiting allof the properties contained in the task order to undertake all necessary, design work.
This will be done jointlywith the RT where required or where the RT and service provider will both be working within the property. TheService Provider should note that inspections may need to be coordinated with RT in order that the customeronly has one visit. Tenderers should note that the contract does not give any guarantee of any work being called off or exclusivity.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Plus Dane Housing LimitedKey Dates
Published
5 September 2018
Submission deadline
8 August 2018
Notice type
award
Source
contracts finder
Related Tenders
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Improve framework (capital delivery and planned works)
Echelon Consultancy are delighted to be procuring on behalf of Hyde Housing Association a framework for the delivery of Capital and Planned Works. The proposed lots are: Kitchens a
A66 northern trans pennine project(ntp) - schemes 1, 2 traffic signals package
Kier Infrastructure are looking to engage experienced and qualified contractors to carry out works pertaining to the Traffic Signals package on the A66 Northern Trans-Pennine schem
Capital works and associated services dynamic purchasing system
Procurement for Housing (PfH) wish to establish a dynamic purchasing system (DPS) for the delivery of capital works projects and provision of associated services for PfH Members th
