FW Construction – Civils, Buildings, OHL and UGC Framework – Multi Site 1231
SCOTTISH HYDRO ELECTRIC TRANSMISSION PLCEstimated Value
Up to £7,400,000,000
Deadline
20 August 2026
Published
22 July 2026
Type
Not specified
Overview
IMPORTANT NOTE: This notice supersedes the previously published notice relating to this procurement (FTS 2026/S 000-052513). To ensure compliance with the applicable legislation, this replacement notice has been published and should be regarded as the authoritative notice for this procurement.
Suppliers should note that: • Minor amendments have been made to PQQ_486 - All Lots Questionnaire to align with the requirements of this notice. The Contracting Authority apologises for any inconvenience caused and thanks suppliers for their continued participation in this procurement.
Procurement Description: This procurement establishes a multi-lot framework for civils, buildings, overhead line and underground cable works across Scottish Hydro Electric Transmission’s large capital delivery portfolio in Scotland. The framework covers six lots: -civils works up to £10m -civils works over £10m -buildings and infrastructure -overhead line pole construction -overhead line tower construction -underground cable construction It is intended to appoint long-term strategic partners with the capability and capacity to deliver design, management, construction, testing and completion works, supporting network investment, renewal, customer connections and the transition to net zero.
Key points
- Typically, standalone or enabling works.
- Limited third party interfaces and temporary works.
- Defined, well scoped packages with repeatable delivery characteristics. Indicative scope may include:
- Substation site clearance and earthworks.
- Foundations for plant (excluding specialist or high risk structures).
- Internal substation roads, hardstanding and drainage.
- Access track construction, strengthening and minor realignments.
- Public road improvements of limited complexity (e.g. passing places, junction tie ins).
- Standard ducting, cabling, troughing and fencing.
- Peatland restoration and environmental mitigation work using established methods. This lot is also split into 5 regions across Scotland which bidders can apply for one or more of.
Key points
- Storage buildings, training school facilities, accommodation and welfare facilities
- Office buildings
- Upgrades, refurbishments, and extensions to existing.
- Internal fit out works to new and existing buildings, including partitions, raised access floors, finishes, cable management systems, containment, and earthing and bonding.
- Mechanical and electrical fit out of building services within new and existing buildings.
- Replacement of RAAC roof structures were identified Design Management and Development
- Establish and manage a suitably qualified design team covering all design and construction aspects of the project.
- Undertake surveys necessary to complete the project.
- Carry out gap analysis and value engineering, as appropriate.
- Develop, complete, and manage design, including managing responses to planning conditions.
- Prepare interim and final RIBA Stage 4 drawings and reports.
- Complete room data sheets and room layouts.
- Prepare and maintain the BIM model for design and construction, including updating any RIBA Stage 3 information produced by others. Planning, Programming and Coordination
- Develop the Construction Phase Plan and detailed programme.
- Attend and lead a project kick off meeting to agree deliverable stages and key milestones.
- Assist with coordination alongside the Project Manager, Project Sponsors, and stakeholder engagement activities.
- Support utility investigations and statutory enquiries.
- Prepare planning application deliverables, including DAS, DIAs, visualisations’, noise studies, CTMPs, designs Enabling and Construction Works
- Undertake any enabling works identified, including service diversion works.
- Prepare design and specifications, coordinating SSEN T fit out, IT, and OT designs and incorporating these into the Works Information. Health, Safety, Environment and Sustainability
- Fulfil all duties required of the Main Contractor under CDM Regulations, supporting other duty holders as required.
- Complete SSEN T Gate process documentation, including but not limited to:
- Design Risk Management Index (DRMI)
- Hazard Identification Workshops (Design HAZID, Construction HAZCON, Operational HAZOP)
- Project safety reviews and reports
- Develop carbon and sustainability assessments
- Prepare Environmental Management Plans, Environmental and Biodiversity Net Gain reports. Training School Specific Infrastructure
- Delivery of offline electrical substation works including substation, associated control, AIS and GIS buildings and OHL works
Key points
- Detailed design of pole foundations, assemblies and interfaces.
- Temporary works design associated with pole installation.
- Design development to support constructability, safety and environmental compliance. Pre construction and enabling works
- Surveys, setting out and ground investigations.
- Access provision, compounds, crane pads and working areas.
- Coordination with land access, wayleaves and stakeholder requirements. Construction
- Installation of wood, steel or composite poles.
- Construction of pole foundations, including reinforced concrete, embedded or piled solutions where required.
- Pole erection, alignment and stability works.
- Installation of crossarms, insulators, fittings and associated hardware.
- Conductor stringing, tensioning, sagging and clipping.
- Installation of earth wires, fibre or auxiliary equipment where specified.
- Removal, replacement or modification of existing pole structures where required.
- Tie ins to existing overhead lines and interfaces with substations or transition structures. Testing, commissioning and completion
- Inspection and testing required to demonstrate compliance with the Works Information.
- Support to commissioning activities defined in the PSWI.
- As built records, data capture and handover documentation.
Key points
- Detailed design of tower foundations and structural interfaces.
- Temporary works design for excavation support, lifts and erection activities.
- Design risk management and constructability reviews. Pre construction and enabling works
- Surveys, ground investigation and setting out.
- Access tracks, temporary works areas, crane pads and compounds.
- Environmental mitigation and land management measures. Construction
- Construction of tower foundations, including piled, reinforced concrete and specialist foundations.
- Tower steelwork delivery, assembly and erection.
- Installation of insulators, fittings and tower accessories.
- Conductor stringing, tensioning and clipping.
- Removal, replacement or modification of existing towers.
- Overhead line realignments, deviations and rebuilds.
- Interfaces with live assets, outages and system constraints where defined in the PSWI. Testing, commissioning and completion
- Structural inspection, verification and testing.
- Support to system testing and commissioning activities.
- Production of as built documentation and asset data.
Key points
- Detailed design of cable routes, trenching, ducts, joint bays and interfaces.
- Temporary works and traffic management design.
- Coordination with consents, planning conditions and third party interfaces. Pre construction and enabling works
- Surveys, trial holes and utilities investigations.
- Access, compounds, traffic management and enabling civils.
- Environmental protection and mitigation measures. Construction
- Trenching and excavation.
- Duct installation, bedding and backfill.
- Construction of joint bays and termination compounds.
- Cable pulling, installation and protection.
- Installation of joints and terminations where within Contractor capability and scope.
- Interface works with substations and overhead line transitions.
- Surface reinstatement, agricultural reinstatement and environmental restoration. Testing, commissioning and completion
- Cable testing, verification and commissioning support.
- Production of as built drawings, GIS data and handover records.
Submission
Details of the amendments have been made clear in updated ‘Response Configuration’ file within the attachments section. • All lot-specific PQQ questionnaires remain unchanged. • The submission deadline has been extended to provide suppliers with adequate time to review and respond to the updated notice and questionnaire.
Additional details
The framework has a potential total value of up to £7.4 billion, with lot specific framework appointed for a period up to eight years. Characteristics: 1.
Multi disciplinary, interfacing or staged works. 2. Higher construction, environmental or third party risk. 3.
Complex temporary works, geotechnical, hydraulic or structural solutions. 4. Integration with live substations or critical transmission assets. Indicative Scope Includes: • Complex substation platforms and reinforced foundations. • Complex/lengthy access track construction, strengthening and realignments. • Bridges, retaining walls, culverts and major public road realignments. • Flood defence schemes involving sheet piling, flood walls, pumping stations and storage. • Watercourse diversions, culvert upgrades and return period capacity improvements. • High risk peatland restoration and slope stability works. • Resilient substation adaptations including elevation of existing plant and equipment. • Works requiring significant statutory interfaces, stakeholder coordination or technical approvals.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Accenture (UK) Limited
3 contracts wonlatest 13 Jul 2026ends 1 Feb 2029£820m
total awarded
- 2
Sword IT Solutions Ltd
3 contracts wonlatest 22 Dec 2025ends 1 Feb 2029£820m
total awarded
- 3
Baringa Partners
2 contracts wonlatest 13 Jul 2026ends 1 Feb 2029£820m
total awarded
- 4
Capgemini UK Plc
2 contracts wonlatest 13 Jul 2026ends 1 Feb 2029£820m
total awarded
- 5
DELOITTE LLP
2 contracts wonlatest 13 Jul 2026ends 1 Feb 2029£820m
total awarded
Accenture (UK) Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Scottish Hydro Electric Transmission plcKey Dates
Published
22 July 2026
Submission deadline
20 August 2026
Notice type
tender
Source
find a tender
Related Tenders
Libraries scotland enewspaper and emagazine
The aim of this tender is to provide a single national eMagazines and eNewpapers service to all thirty-two public library services for access by their members. Scottish Library and
Pupil equity funding (PEF) flexible framework
The Scottish Government has committed to providing additional funding in the form of Pupil Equity Funding (PEF), to schools as part of the Scottish Attainment Challenge programme.
Provision of homeless supported accommodation, outreach tenancy support and housing first services
Falkirk Council is setting up a framework to contract providers to deliver homeless support services, including interim accommodation for young people and adults, community tenancy support, and a Housing First programme.
EDC/2026/4456 framework for traffic signal equipment maintenance, supply & associated works
East Dunbartonshire Council wishes to establish a public contract (within the meaning of the Procurement Regulations) and appoint a number of suppliers under an overarching ranked