DNWP0073 - Lot 1B/In-SEP ID - Controlled Area Initial Decommissioning Operations
Altrad AtkinsRealis Joint Venture (A2R JV)Estimated Value
£10,000,000 – £20,000,000
Deadline
17 September 2026
21 days remaining
Published
27 August 2026
Type
works
Overview
The anticipated scope for DNWP0073 is indicatively only. The Contractor requires support to the Inside Controlled Area (In-SEP) Decommissioning Operations.
This will take the form of the provision of resource, up to 30 Full Time Equivalent (FTE), with an appropriate ratio of blue:white collar resources to be determined by the Subcontractor to best meet the Initial Decommissioning (ID) activities required by the Contractor. A current contract is in place until 31st March 2027 to prove the concept and develop an initial operating capability.
This EOI relates to the longer-term works anticipated to commence thereafter, with an estimated duration of 24 months. The tasks undertaken will be broad and varied, and will be located in existing In-SEP and any future In-SEP buildings.
Additional details
Broadly, the Subcontractor will be required to provide Operational Support to the ID capability, build upon the previously developed ID capability, drive future improvements and assist in building scope of ID workload. Specific work and details will be decided by the ID In-SEP, Delivery Board and locally on plant at Plant Operations Control Centres (POCCs).
Initial works will include waste removal, waste packaging and despatch and size reduction. Deplanting, involving the removal, lifting, size reduction and transport of redundant plant will also be required.
Works will grow and develop in complexity as the capability matures, subject to providing ongoing Value for Money. (VFM) Tasks which meet the definition of 'Construction' (CDM 2015 Part 1 Regulation 2) should now be anticipated and appropriate management and supervision arrangements incorporated.
This Contract Opporutnity represents a long-term commitment by the Contractor to further develop the Suitably Qualified and Experienced Person (SQEP) workforce of the Subcontractor to undertake works in uniquely hazardous facilities requiring prior knowledge and experience. The Subcontractor will be responsible for the design of all temporary works, this is anticipated to primarily be access/scaffolding but may also include design of lifting plans.
The Subcontractor will ensure a safe sequence is adhered to for all activities. This may require the use of Contractor's structural/mechanical engineer on an ad-hoc basis.
The Subcontractor shall integrate and co-ordinate its design with the following design of the Contractor and Others. The Subcontractor shall submit all temporary works plans to the Project Manager for acceptance prior to erection.
The Subcontractor will be responsible for ensuring an appropriate level of checking and approval for their designs. The review period for the Project Manager to review the Review Documents is up to 2 weeks (10 working days).
No temporary works will be erected until the Review Documentation has been authorised by the Project Manager. Important: Delivery is within a live operational environment, and scope is subject to change.
AI Analysis
Get a detailed breakdown of requirements, key tasks, and tips for reading this tender
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Sign up freeto open noticeA free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Useful Resources
A free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.
Buyer Profile
Altrad AtkinsRealis Joint Venture (A2R JV)Key Dates
Published
27 August 2026
Submission deadline
17 September 2026
Notice type
Contract
Source
contracts finder
Related Contracts
CA18389 - leeds college of building - principal contractor
Leeds College of Building are looking for a Principal Contractor to undertake the design, construction, management and delivery of refurbishment works to the newly named CTEC Build
CA18370 - ITT 52/2026 - bessbrook community centre - new mini digi hub
The contract is for upgrading and refurbishing Bessbrook Community Centre, including an extension and internal works to create a new community Digi‑hub, funded by the PEACEPLUS programme.
CA18360 - ITT 31/2026 - peaceplus PP1024 schomberg society kilkeel refurbishment project retender
Applications are invited from Contractors, under the terms of the NEC4 ECSC Short Contract, for PEACEPLUS Project: Schomberg Society Kilkeel - Upgrade & refurbishment Works: A
BLD-3163 store 54 independent heating solution - delivery
This contract is for a full refurbishment of Store 54, covering roof repairs, insulation, ceiling, glazing, doors, mechanical & electrical plant replacement and installation of a new VRV/VRF heating system with an ASHP, plus upgraded lighting that meets ATEX/DSEAR safety standards. It is aimed at contractors who can deliver the build after a Stage 4 design is supplied.
