Digestor Roof Replacement Design & Build
SEVERN TRENT WATER LIMITEDEstimated Value
Up to £7,000,000
Deadline
16 July 2026
Published
20 May 2026
Type
Not specified
Full Description
Digestor Roof Replacement Works
The works requirement, being Design and Build is for the provision of new replacement fixed steel painted digester rooves. The Contractor(s) is required to develop the Client's Outline and Detailed Design and undertake Build in the role Principal Designer and Principal Contractor. The works include;
- Outline and Detailed Design
- Digestor Decommissioning & Purging (Emptying/ Cleaning/Waste Management)
- Demolition and disposal of existing steel roof
- Build including any Remedial Works (Roof fabrication & installation Civils/MEICA/DSEAR/ Welding Electrical & Instrumentation)
- Reinstatement & Commissioning
- Including but not limited to requirements for surveys, temporary works, necessary plant, equipment, materials, site management and welfare facilities.
- Works completion date across all sites is required by 2030.
- Framework duration 8 years.
The framework's objective is to;
- Replace aging assets, providing new fixed roofs to digesters. The new, fixed roof is to be sealed preventing any foam and sludge leakage from digester sludge seal annulus associated with floating roofs, reducing pollution events.
- Improve safety associated with the new assets. Including upgraded lightning protection, enhanced monitoring and control around digester gas headspace, and protection against rapid volume expansion (RVE's).
- Significantly reduce the risk of serious structural failure of the roof
- Drive benefits to Net Zero efficiencies
- Comply with company digester design manual and specifications (fixed roof)
- Comply with the Environment Agency's Industrial Emissions Directive (IED), achieving compliance before end of AMP8.
Requirements
The works requirement, being Design and Build is for the provision of new replacement fixed steel painted digester rooves. The Contractor(s) is required to develop the Client's Outline and Detailed Design and undertake Build in the role Principal Designer and Principal Contractor. The works include;
- Works completion date across all sites is required by 2030.
- Comply with company digester design manual and specifications (fixed roof)
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
SUEZ Advanced Solutions UK Limited
£20m
total awarded
- 2
Transcend Software, Inc.
2 contracts wonlatest 28 Jul 2026ends 30 Apr 2029£1m
total awarded
- 3
EMPEROR DESIGN CONSULTANTS LIMITED
£600,000
total awarded
- 4
TUSKERDIRECT LIMITED
- 5
Certora Training Limited
1 contract wonlatest 16 Sept 2026ends 30 Sept 2029£933,473
total awarded
SUEZ Advanced Solutions UK Limited is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
SEVERN TRENT WATER LIMITEDKey Dates
Published
20 May 2026
Submission deadline
16 July 2026
Notice type
planning
Source
find a tender
Related Tenders
Cultural host request
Telford and Wrekin Council would like to establish a contract to provide and support the maintenance of a secure partner portal that allows organisations to upload and update infor
Tender for sensory impairment rehabilitation service in herefordshire
Herefordshire Council is seeking to appoint a suitably qualified and experienced provider to deliver a countywide Sensory Impairment Service for adults aged 18 and over who are liv
Provision of energy performance certificate (EPC) assessments
Platform Housing Limited is seeking to appoint suitably qualified and experienced suppliers to deliver Energy Performance Certificate (EPC) assessments across our operational areas
The supply of electricity to MOD sites in northern ireland
PROCUREMENT SUMMARY Procedure: Open Procedure under the Procurement Act 2023. Contract Length: 24 Months + 12 Month Extension + 12 Month Extension. Maximum Contract Duration: 48 Mo
