Overview
The requirement is summarised below: The BBC are looking to appoint a contractor to carry out fit-out works at their new home at The Tea Factory in Digbeth. The BBC’s current home to its 650 staff is The Mailbox.
Staff are expected to move from The Mailbox to The Tea Factory in 2027. Stoford (with BAM) started redeveloping The Tea Factory from a derelict building to a Shell and Core office1 in January 2024.
They are making good progress and expect to complete their works in late December 2025. 1 As part of the Shell and Core, Stoford and BAM are also building the walls and lids to the Technical Rooms (i.e., Studios, Edit Suites, etc). The fit-out works are expected start on site date in early January 2026 and be completed by no later than the end of September 2026.
Additional details
The fit-out is over four floors (Ground, 1, 2 and 3) with a plant area on the roof. The scope of fit-out works includes: • Finishes (including acoustics) to the Technical Rooms: o 8x Radio Studios. o 10x Edit Suites. o 1x TV Studio. o 1x TV Studio Gallery. o 1x Lecture Theatre. o 4x Apparatus Rooms. • Construction of Radio Drama Studio and Control Room including a ‘Dead Room’. • Construction of six meeting rooms with structural lids. • All M&E to the floor plates and all rooms / spaces. • Raised access floor. • Acoustic finishes. • Wall and floor finishes. • FF&E (excluding technical rooms).
Design of the works has been progressed to RIBA Stage 4 by BBC Workplace with support from the following consultants: • J4 Projects Project Managers • MGAC Cost Consultant • AWW Architects • IDSR Interior Designers • CMB MEP Design • Arup Structural Engineer • Ion Acoustics Acousticians The works will be procured under the JCT 2024 D&B Contract. The BBC does not intend to novate the designers to the contractor; however, it may be acceptable for the contractor to directly appoint the designers if they (a) deem it to be beneficial for the project and (b) can demonstrate that any associated risks (e.g., conflicts of interest) can be mitigated.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Overbury Plc
£10,400,000
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Computacenter (UK) Ltd
2 contracts wonlatest 3 Sept 2026ends 31 Jul 2029 - 2
Medigold Health Consultancy
£1m
total awarded
- 3
Heydon & Carr Ltd
1 contract wonlatest 11 Aug 2026ends 28 Apr 2028£19m
total awarded
- 4
BJM Design
1 contract wonlatest 23 Jul 2026ends 31 Oct 2026 - 5
Baxterstorey Limited
1 contract wonlatest 9 Jun 2026ends 4 Oct 2029£4m
total awarded
Computacenter (UK) Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
BBC (British Broadcasting Corporation)Key Dates
Published
30 October 2025
Submission deadline
16 June 2025
Notice type
award
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council needs a contractor to refit its Penang office (Wisma Great Eastern) so it can host examinations, adding exam rooms and related facilities.
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national