Estimated Value
Up to £6,045,620
Deadline
27 August 2026
Published
23 September 2026
Type
Not specified
Overview
All structural interventions, modifications and demolition as detailed in Price & Myers, Witherford Watson Mann and Purcell design drawings; Demolition of Strand floor, facade, and other elements as specified by the design engineers; Survey and investigation works required to ensure design and methodology is completed in time within the restraints of the existing structure; Localised noise, dust and vibration monitoring; Clean and re-use of existing brickwork for new wall installs; Formation of new floors including padstones or steel bearing plates, steels, joisting and sheathing; Formation and infills to all pockets formed for new structure install, both for this package and other (i.e. Structural Steelwork), including padstones and steel bearing plates; All mass poured, pre-cast, or reinforced concrete works including the new stair core, stairs, underpinning, pads, ramps, slabs and upstands; All dry packing, grouting, and encasement to steel members, including those installed by Others; Attendance and return visits required for the above installs by Others; External Luxcrete repairs; CCTV and repairs of existing below ground drainage. CCTV of new drainage; Install of items free issued by others (e.g. cast-in plates by Structural Steelwork contractor); Where shown in package split, all new primary and secondary steelwork, connections, metal deck, intumescent coating, padstones, steel bearing plates and dry packing; Alterations to existing structure including formation of new risers and services penetrations, box frames and trimmer steels and timbers; 3rd party review and confirmation of any intumescent and fire stopping installs; Forming of all new lift pits including underpinning, reinforcement and waterproof concrete; Installation of all waterproofing, blinding, insulation and sump (including commissioning) requirements; Facade and party wall retention propping to facilitate demolition Works; Demolition of existing stairwell in the East Wing including all associated temporary works, and infill of new landing; All blockwork and brick walls as shown in package split including windposts; Form new openings including lintels, beams, posts; Re-levelling of existing floor substrates; Removal and excavation of existing screed and slabs, including localised repaires where required; Covering or edge protection install to all voids and openings formed by the Works; Installation of riser flooring systems to all newly formed and existing riser opening; Strengthening of existing beams, including services opening coordination and formation; Removal or containment of any asbestos (e.g. Strand buildings timber flooring), lead, guano and anthrax where required to complete the Works, with appropriate measures in place; Removal, protection and off-site storage of heritage items such as stone beams and flags, grilles, fireplaces and hearths; Removal of existing heritage windows following surveys by Others; Installation of tower crane base including piles and cap; Fire and corrosion protection to steel in-situ application (new only); Temporary & permanent steel bracing; Protection of all existing heritage finishes (where at risk of damage from the works); All scaffolding and crash decks to facilitate the works (e.g. Strand south facade elevation); Propping of existing vaults at Strand; Underslab drainage works and GRP sumps; Surveys of existing structure, looking ahead on programme to avoid last minute discoverables; Install of gulleys, manhole covers and associated below-ground drainage components;
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
KILNBRIDGE CONSTRUCTION SERVICES LTD.
£6,045,620
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
BOVIS CONSTRUCTION (EUROPE) LIMITED
£5m
total awarded
BOVIS CONSTRUCTION (EUROPE) LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
COURTAULD INSTITUTE OF ARTKey Dates
Published
23 September 2026
Submission deadline
27 August 2026
Notice type
award
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council currently occupies Wisma Great Eastern, Penang - No. 25, Lebuh Light, 10200 Level 3A, Suite 3A.1. The British Council is required to fitout the premises to reco
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national
