Demolition of Open Market, former Cinema and Access Bridges - Bankfield, Burnley, Lancashire
BURNLEY BOROUGH COUNCILEstimated Value
£400,000 – £600,000
Deadline
12 May 2017
Published
31 March 2017
Type
works
Overview
The project is for taking down and making good a former cinema block, open-market area, vehicular access bridge and a pedestrian access bridge, all constructed circa 1967. The principal, structural, building elements being in-situ, reinforced concrete beams, columns, floor slabs and roof slabs.
Asbestos surveys, condition surveys and utility surveys have been carried-out. These will be made available for tendering companies together with the appropriate technical drawings.
There are considerable amounts of amosite and chrysotile asbestos throughout the building structures in a number of material finishes. The former cinema block is built over a closed market with retail units, service area sub-station and pedestrian access directly below on the ground floor, all of which will remain open for the duration of the works.
Additional details
The block is adjacent and parallel to the adopted highway known as Bankfield. The block has a central, rectangular service core with a cinema unit to each side.
Construction generally comprises, in-situ, reinforced concrete frame with brickwork and blockwork infill panels, plastered internally and with fluted, render finish externally. The in-situ, split-level reinforced concrete floors, approximately ten metres above external ground floor level, are interconnected by a series of in-situ, reinforced concrete staircases.
The floors have been cast with a gradient appropriate for their use as a cinema. The roof to the cinema block is made up of a 'warm roof' on corrugated, galvanised steel sheeting supported off steel purlins on steel girder trusses at regular intervals supported off the concrete frame.
The roof is approximately twenty metres above the adjacent ground level. The in-situ floor to the western cinema unit has been 'levelled-out' for storage purposes by over-boarding on a timber frame supported off the sloping concrete floor.
The former open-market area at first floor level (approximately six metres above external ground level) is a fully enclosed area. Part of the area has the cinema block over.
The remaining area is roofed over by a mixture of: original, waterproofed, in-situ, reinforced concrete slab, incorporating roof lights supported by in-situ, reinforced concrete columns at regular intervals; and, an 'atrium-type' glazed roof supported by a steel frame built off the in-situ, reinforced concrete floor slab. The whole of the open-market floor has been waterproofed with an asphalt finish with gradients falling to internal cast-iron rainwater pipes.
The works are located adjacent to Bankfield, Burnley Town Centre, Ordnance Survey grid reference E384035 N432723 and the OS Above Ordnance Datum level at ground level is 110.700m. Further information on vehicular and pedestrian access is provided in Additional Text section.
Additional information: Description continued: The vehicular access bridge to the open market comprises ramped access and bridge over the River Brun with an elevated parking platform for approximately twenty vehicles over the highway known as Bankfield. The bridge comprises surfaced, in-situ, reinforced concrete deck slab supported by in-situ, reinforced concrete edge/parapet beams constructed off 'V-trestled' cross beams and columns of similar material.
The elevated parking platform is made up of a surfaced, in-situ, reinforced concrete deck built off pre-cast, pre-stressed concrete intermediate beams between in-situ, reinforced concrete edge/parapet beams. The deck span is approximately 12 metres and is supported off in-situ, reinforced concrete 'V-trestled' cross beams and columns.
The pedestrian access bridge to the open market over Bankfield comprises surfaced, in-situ, reinforced concrete deck slab supported by in-situ, reinforced concrete edge/parapet beams supported by the open-market edge beam to the South and intermediate, in-situ, reinforced concrete 'V-trestled' cross beams and columns to the North of Bankfield. To facilitate safe execution of the works Burnley Council will enter into agreement with the Highway Authority, Lancashire County Council, to provide traffic management measures throughout the duration of the works.
The exact detail will be determined by all parties for inclusion in the Construction Phase Health and Safety Plan. The Council estimates the anticipated range of value for this work to be GBP400,000 to GBP600,000.
An indication as to the commencement of works on site would be October 2017, with completion in June 2018. The Council is undertaking a PAS 91 compliant pre-qualification process using PAS 91 core and supplementary questions.
Only those suppliers successful at the pre-qualification stage will be considered for the invite to tender stage of this opportunity. The Council anticipates that a maximum of five suppliers will be invited to tender.
The values stated in this notice merely stipulates the Council's anticipated range of value for this work. The focus here is that the Council will be looking to secure competitive rates. There is no suggestion that the lowest price acceptable should be interpreted as the 'lowest actual value' recorded in this notice.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Burnley Borough CouncilKey Dates
Published
31 March 2017
Submission deadline
12 May 2017
Notice type
award
Source
contracts finder
Related Tenders
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Improve framework (capital delivery and planned works)
Echelon Consultancy are delighted to be procuring on behalf of Hyde Housing Association a framework for the delivery of Capital and Planned Works. The proposed lots are: Kitchens a
A66 northern trans pennine project(ntp) - schemes 1, 2 traffic signals package
Kier Infrastructure are looking to engage experienced and qualified contractors to carry out works pertaining to the Traffic Signals package on the A66 Northern Trans-Pennine schem
Capital works and associated services dynamic purchasing system
Procurement for Housing (PfH) wish to establish a dynamic purchasing system (DPS) for the delivery of capital works projects and provision of associated services for PfH Members th