CUE & Butterfly House Decarbonisation
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUSTEstimated Value
Up to £900,000
Deadline
10 April 2026
Published
31 March 2026
Type
Not specified
Full Description
The Butterfly House and Centre for Understanding the Environment (CUE) are located within the wider Horniman Gardens site, which is a Grade II listed Park and Garden. The CUE was constructed in 1995 and was originally intended as a temporary structure with an expected lifespan of 20 years. The Butterfly House was constructed in 2016 as glasshouse for tropical plants and butterflies.
The Horniman wish to engage a Main Contractor who will manage and deliver the implementation of the decarbonisation of the above buildings in the listed setting. The works will be let on the basis of traditional JCT contract intermediate form without quantities, but with some contractor design elements.
As part of the Horniman's Climate and Ecology Manifesto we have made a commitment to become Greenhouse Gas Neutral by 2040. The key objective of this project is to move us towards this goal by doing the following:
- Butterfly House: Replacing the gas cabinet air heater with air-to-air Air Source Heat Pumps (ASHPs).
- Butterfly House: Thermal performance and air tightness improvement by replacing existing glass and acrylic with triple layer polycarbonate cladding to existing steel structure with new aluminum glazing bars, window and vents.
- Butterfly House: Thermal performance and carbon reduction by installation of new trench heating with new Air Handling Unit and visitor path surface or as an alternative an fan-coil system
- CUE: Replacing the gas boiler in the Centre for Understanding the Environment (CUE) building with air-to-water Air Source Heat Pumps.
- CUE: Improve the thermal performance and air tightness improvement by draught proofing and thermal bridge mitigation including floor, wall and roof new thermal insulation.
- CUE: Install Mechanical Ventilation Heat Recovery (MVHR)
- Upgrading the electrical cables inside both the Butterfly House and CUE building.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Rose Refurbishment & Construction Ltd
1 contract wonlatest 1 Dec 2025ends 31 Mar 2026£69,716
total awarded
- 2
RELIANCE HIGH-TECH LIMITED
£44,535
total awarded
- 3
POWELL SYSTEM ENGINEERING LIMITED
£167,483
total awarded
- 4
VERTEX SERVICES GROUP LIMITED
£476,655
total awarded
- 5
PRINGLE RICHARDS SHARRATT LIMITED
£91,827
total awarded
Rose Refurbishment & Construction Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
THE HORNIMAN PUBLIC MUSEUM AND PUBLIC PARK TRUSTKey Dates
Published
31 March 2026
Submission deadline
10 April 2026
Notice type
tenderUpdate
Source
find a tender
Related Tenders
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
Malaysia penang centre regear and refit
The British Council currently occupies Wisma Great Eastern, Penang - No. 25, Lebuh Light, 10200 Level 3A, Suite 3A.1. The British Council is required to fitout the premises to reco
Poplar harca lift service and maintenance – all estates
Poplar HARCA is seeking to procure a new Contract for Lift Service and Maintenance. The Contract will require the Contractor to provide and manage all the necessary resources and i
Integrated security solutions (ISS) works at walham and pentir
National Grid Electricity Transmission Plc is seeking experienced and suitably qualified suppliers capable of delivering a fully integrated security solution for critical national
