System operational · UK tenders
Awarded
ocds-h6vhtk-06479e · award

Cotswold Water Cycle Study

Cotswold District Council

Estimated Value

Up to £47,750

Deadline

Not specified

Published

5 February 2026

Type

services

South WestGBlimitedCPV: 71800000
CategoryArchitecture & engineering

Overview

METHODOLOGY General approach The Water Cycle Study to accompany the Local Plan Partial Update (LPPU) is now complete. Where applicable, the new WCS will draw on this, however the LPPU WCS was prepared over several years, so substantial sections would require revision, in particular because we would anticipate needing to assess the impact of development at a greater volume and number of settlements than the LPPU WCS.

A draft will be provided to the Council, and to key stakeholders (Thames Water, Severn Trent Water, Wessex Water, Bristol Water and the Environment Agency). One round of comments has been allowed for.

Growth scenario A growth forecast will be prepared, to include the latest commitments and completions, and your proposed allocations. We anticipate we will need further information from neighbouring authorities where infrastructure is shared across boundaries.

Additional details

From an initial view of the study area this would need updated growth information from: • Cheltenham • Tewkesbury • Gloucester, Cheltenham and Tewkesbury Joint Core Strategy • South Gloucestershire • Stratford-on-Avon • Stroud • Swindon • Vale of White Horse • West Oxfordshire • Wiltshire • Wychavon In the interests of time, we recommend that CDC initiate this process in advance of the project starting in order to avoid delays in obtaining data. You have advised that the Council will be moving towards a preferred growth option when the study commences.

If it is the case that there remain optional approaches which the Council are still assessing, we can include up to four growth scenarios within our assessment. We will adapt our growth spreadsheet so these scenarios can be turned on and off in order to generate the appropriate water demand forecasts we need in the various assessments.

Water resources The final WRMPs will be reviewed and compared to the overall housing need. Should there be a discrepancy (which is likely given the recent NPPF changes) this will be discussed with the water company and their comments sought on whether the additional growth could be accommodated within their existing plans or whether there are any constraints on timing of growth until additional water resources can be developed.

The analysis of a water efficiency standard for CDC will be further developed including the evidence to support a tighter target if required. Once the growth scenario is prepared, we will provide it to you for review and approval prior to proceeding with the WCS assessments.

Water supply We will provide details of potential allocations to the water supply companies and request that they provide comments / RAG assessment of these sites. These will be collated and followed up where appropriate to understand any additional infrastructure required, constraints or implications for the phasing of sites.

Wastewater network As in the water supply assessment we will request RAG assessments from the sewerage undertakers, alongside information contained in their Drainage and Wastewater Management Plan (DWMP). Storm overflows The LPPU WCS assessed storm overflow performance using data from 2020 to 2022.

We will update the storm overflow assessment with the latest available data (up to 2024) and Environment Agency methodology (published in 2025) which now requires 5 years of data to be used where available. Wastewater treatment We will assess current and future headroom at each wastewater treatment works (WwTW).

Where this assessment shows a WwTW is close to, or exceeding its permit limit, comments will be sought from the water company on whether there are any constraints to providing upgrades, or land that requires safeguarding in the Local Plan. This will be supported by information from the Drainage and Wastewater management Plan (DWMP).

Water quality and environmental impact The EA's SIMCAT water quality modelling tool will be used to assess the impact of growth in the Local Plan period on water quality. A baseline scenario will be created using the existing model updated to the latest WwTW flow data and planned improvements at WwTWs.

Future scenarios will then be created using the new growth forecast to simulate the predicted wastewater discharges at the end of the plan period. The following tests will then be carried out: • Could the development cause a greater than 10% deterioration in water quality?

This objective is to ensure that all the environmental capacity is not taken up by one stage of development and there is sufficient capacity for future growth. • Could the development cause a deterioration in WFD class of any element assessed? This is a requirement of the Water Framework Directive to prevent a deterioration in class of individual contaminants. • Could the development alone prevent the receiving watercourse from reaching Good Ecological Status (GES) or Potential?

Is GES possible with current technology or is GES technically possible after development with any potential WwTW upgrades. Cotswold District is covered by two EA SIMCAT models (Thames and Severn).

If the Council has multiple growth scenarios to be tested, this, in combination with climate change testing, would increase the volume of work significantly if we were to test every option. We therefore propose that we test the preferred option and create a "worst case scenario" combining several of the scenarios.

Should the water quality modelling indicate an issue that cannot be resolved by improving treatment processes, we may recommend that further water quality modelling is carried out in order to understand the limit for this catchment. An indicative fee for additional model runs is provided.

We will undertake a screening exercise to identify protected sites (SACs, SPAs, SSSIs and Ramsar sites) that could be impacted by a deterioration in water quality. The water quality modelling results will be used to determine the predicted water quality in the waterbodies adjacent to these protected sites.

These results can be used to inform the appropriate assessment of the plan's impact on protected habitats. Further model runs will be undertaken to test the future impact of climate change on the water quality modelling results.

Odour and flood risk An odour screening assessment will be carried out using a simple buffer (800m) around each WwTW. This will identify potential allocations that may be at risk of nuisance odour.

An assessment will also be made of the impact of additional wastewater discharge on downstream flood risk. A flood estimate will be made on the receiving watercourse. Where the additional flow from the treatment works makes up a significant proportion of the storm flow, then it is deemed that flow from the WwTW could increase flood risk.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Award Details

Jeremy Benn Associates Ltd (trading name JBA Consulting)

£47,750

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Submission Portal

Find a Tender

Visit
1

Open the original notice

Click the button below to view the full notice on Find a Tender Service (FTS)

2

Check the procedure type

The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply

3

Access the eSourcing portal

FTS notices link to the buyer's eSourcing platform — register there to access documents

4

Complete the Selection Questionnaire

Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage

5

Submit electronically

Upload your completed response through the eSourcing platform before the closing date and time

FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.

Buyer Profile

Cotswold District Council
Typepublic body
RegionUKK13
Total tenders21
Total spend£5,402,123
View buyer profile

Key Dates

Published

5 February 2026

Submission deadline

Not specified

Notice type

award

Source

find a tender

Similar

Related Tenders

S
Open
1159dbf2-a8f6-4041-9c42-8c650021f021 · Contract

Traffic & transport consultancy services (swindon lane development)

Swindon Parish Council
servicesSouth WestSME friendly

Swindon Parish Council seeks to appoint a qualified Traffic & Transport consultant to support its technical review of the forthcoming planning application for development at Sw

££15,000
⏱ 23 Oct 2026
Posted · today10d to apply →
N
Open
ocds-h6vhtk-07755a · tender

Reopening of framework agreement for live-in care (all-ages), complex care (all-ages) and trusted assessors for spot therapy and clinical psychology provision for NHS devon integrated care board

NHS DEVON INTEGRATED CARE BOARD
servicesSouth West

NHS Devon Integrated Care Board (the Commissioner) is seeking to reopen the Framework Agreement and appoint suitable providers who have the capability and capacity to deliver the f

£Up to £61,297,064
⏱ 11 Nov 2026
Posted · yesterday29d to apply →
S
Open
ocds-h6vhtk-077d5b · tender

Reopening of the over 65 residential care home framework for swindon

Swindon Borough Council
servicesSouth West

Swindon Borough Council invites expressions of interest from suitably qualified and experienced service providers for admission to the existing Over 65 Years of Age Residential Car

£On request
⏱ 14 Oct 2026
Posted · 1w ago1d left →
N
Open
ocds-h6vhtk-06e0c8 · tenderUpdate

Plymouth home-based intermediate care

NHS DEVON INTEGRATED CARE BOARD
servicesSouth West

NHS Devon sought to procure a managed Pathway 1 home-based intermediate care support service for Plymouth - to fully manage provision to support circa 60-80 individuals at any one

£Up to £4,500,000
Posted · 1mo agoView details →