Construction of an Extension to existing Park & Ride Car Park at Birkenhead North Train Station
MerseytravelEstimated Value
Up to £1,000,000
Deadline
25 January 2016
Published
18 November 2016
Type
works
Overview
Merseytravel is seeking to procure a suitably qualified Contractor from Contactors for Civils and Highways Works for the construction of an extension to the park and ride facility at Birkenhead North Station. Merseytravel has an on-going commitment to provide strategic park and ride facilities across Merseyside.
The scheme at Birkenhead North is seen as being part of the fulfilment of the commitment. The scheme has hitherto been developed independently to detailed design stage including the obtaining of Planning Permission (with conditions).
The outline proposals for the scheme is as follows: Birkenhead North Proposal is to construct an extended 671 space car park (267 existing + 404 new) on land formerly occupied by housing to the North of the railway. The existing facility occupies the southern part of the site (immediately north of Station) and was constructed in 2012 when the site was cleared, levelled, and fully enclosed by secure fence.
Additional details
As part of the 2012 scheme, the Phase 2 site was cleared, utility service mains disconnected (former residential road closed) and top soiled / seeded. The existing operational parking is accessed via a road which crosses the Phase 2 site off Beaufort Road.
The works will require excavation to formation, construction of hard standing surface, the necessary marking out, provision of drainage, CCTV and lighting (linked to station), provision of signage within and around the facility. Existing trees planted on North and West boundaries to be retained within the scheme.
Limited works will be carried out on the existing operational site to relocate disabled parking spaces and provide new pedestrian walkways. All works to be carried out whilst maintaining normal access to and operation of the existing Park & Ride facility.
Merseytravel would expect the successful Contactor to implement the schemes in line with the requirements of the Planning Conditions, recommendations made by the Environment Agency and in accordance with the recommendations of CEEQUAL including the production of an evidence file. It would be the responsibility of the successful Contractor to provide the necessary documentation in relation to, but not limited to, Construction Phase Health and Safety Plans, Site Waste Management Plans, Environmental Plans and the O&M Manuals upon completion.
Merseytravel has employed Waterman Consultants to review the existing design information, obtain any outstanding consents and approvals and undertake Contractor Management during the delivery including Site Supervision, CDM-C and Quantity Surveyor services. Although the scheme is to provide a park and ride site at a railway station, the plot of land on which it is to be created does not lie in rail ownership (though there are interfaces with rail owned land).
The land is owned by Wirral MBC and is leased to Merseytravel who in turn lease the land to Merseyrail Electrics (the SFO of Birkenhead North station). Additional information: Merseytravel is seeking to procure a suitably qualified Contractor from Contactors for Civils and Highways Works for the construction of an extension to the park and ride facility at Birkenhead North Station.
Merseytravel has an on-going commitment to provide strategic park and ride facilities across Merseyside. The scheme at Birkenhead North is seen as being part of the fulfilment of the commitment.
The scheme has hitherto been developed independently to detailed design stage including the obtaining of Planning Permission (with conditions). The outline proposals for the scheme is as follows: Birkenhead North Proposal is to construct an extended 671 space car park (267 existing + 404 new) on land formerly occupied by housing to the North of the railway.
The existing facility occupies the southern part of the site (immediately north of Station) and was constructed in 2012 when the site was cleared, levelled, and fully enclosed by secure fence. As part of the 2012 scheme, the Phase 2 site was cleared, utility service mains disconnected (former residential road closed) and top soiled / seeded.
The existing operational parking is accessed via a road which crosses the Phase 2 site off Beaufort Road. The works will require excavation to formation, construction of hard standing surface, the necessary marking out, provision of drainage, CCTV and lighting (linked to station), provision of signage within and around the facility.
Existing trees planted on North and West boundaries to be retained within the scheme. Limited works will be carried out on the existing operational site to relocate disabled parking spaces and provide new pedestrian walkways.
All works to be carried out whilst maintaining normal access to and operation of the existing Park & Ride facility. Merseytravel would expect the successful Contactor to implement the schemes in line with the requirements of the Planning Conditions, recommendations made by the Environment Agency and in accordance with the recommendations of CEEQUAL including the production of an evidence file.
It would be the responsibility of the successful Contractor to provide the necessary documentation in relation to, but not limited to, Construction Phase Health and Safety Plans, Site Waste Management Plans, Environmental Plans and the O&M Manuals upon completion. Merseytravel has employed Waterman Consultants to review the existing design information, obtain any outstanding consents and approvals and undertake Contractor Management during the delivery including Site Supervision, CDM-C and Quantity Surveyor services.
Although the scheme is to provide a park and ride site at a railway station, the plot of land on which it is to be created does not lie in rail ownership (though there are interfaces with rail owned land). The land is owned by Wirral MBC and is leased to Merseytravel who in turn lease the land to Merseyrail Electrics (the SFO of Birkenhead North station).
On-going liability and maintenance responsibility for the completed sites will sit with Merseyrail Electrics. The power for lighting, etc. will be provided from the station supply, and CCTV will be linked back to the station for monitoring and recording. Location is within the Liverpool City Region.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Key Dates
Published
18 November 2016
Submission deadline
25 January 2016
Notice type
award
Source
contracts finder
Related Tenders
4 John street, maryport - lintel replacement and rendering
Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e
Improve framework (capital delivery and planned works)
Echelon Consultancy are delighted to be procuring on behalf of Hyde Housing Association a framework for the delivery of Capital and Planned Works. The proposed lots are: Kitchens a
A66 northern trans pennine project(ntp) - schemes 1, 2 traffic signals package
Kier Infrastructure are looking to engage experienced and qualified contractors to carry out works pertaining to the Traffic Signals package on the A66 Northern Trans-Pennine schem
Capital works and associated services dynamic purchasing system
Procurement for Housing (PfH) wish to establish a dynamic purchasing system (DPS) for the delivery of capital works projects and provision of associated services for PfH Members th