Construction of an Extension to existing Park & Ride Car Park at Birkenhead North Train Station

Merseytravel

Estimated Value

Up to £1,000,000

Deadline

25 January 2016

Published

18 November 2016

Type

works

North WestGBNot specifiedCPV: 45223320
CategoryConstruction

Overview

Merseytravel is seeking to procure a suitably qualified Contractor from Contactors for Civils and Highways Works for the construction of an extension to the park and ride facility at Birkenhead North Station. Merseytravel has an on-going commitment to provide strategic park and ride facilities across Merseyside.

The scheme at Birkenhead North is seen as being part of the fulfilment of the commitment. The scheme has hitherto been developed independently to detailed design stage including the obtaining of Planning Permission (with conditions).

The outline proposals for the scheme is as follows: Birkenhead North Proposal is to construct an extended 671 space car park (267 existing + 404 new) on land formerly occupied by housing to the North of the railway. The existing facility occupies the southern part of the site (immediately north of Station) and was constructed in 2012 when the site was cleared, levelled, and fully enclosed by secure fence.

Additional details

As part of the 2012 scheme, the Phase 2 site was cleared, utility service mains disconnected (former residential road closed) and top soiled / seeded. The existing operational parking is accessed via a road which crosses the Phase 2 site off Beaufort Road.

The works will require excavation to formation, construction of hard standing surface, the necessary marking out, provision of drainage, CCTV and lighting (linked to station), provision of signage within and around the facility. Existing trees planted on North and West boundaries to be retained within the scheme.

Limited works will be carried out on the existing operational site to relocate disabled parking spaces and provide new pedestrian walkways. All works to be carried out whilst maintaining normal access to and operation of the existing Park & Ride facility.

Merseytravel would expect the successful Contactor to implement the schemes in line with the requirements of the Planning Conditions, recommendations made by the Environment Agency and in accordance with the recommendations of CEEQUAL including the production of an evidence file. It would be the responsibility of the successful Contractor to provide the necessary documentation in relation to, but not limited to, Construction Phase Health and Safety Plans, Site Waste Management Plans, Environmental Plans and the O&M Manuals upon completion.

Merseytravel has employed Waterman Consultants to review the existing design information, obtain any outstanding consents and approvals and undertake Contractor Management during the delivery including Site Supervision, CDM-C and Quantity Surveyor services. Although the scheme is to provide a park and ride site at a railway station, the plot of land on which it is to be created does not lie in rail ownership (though there are interfaces with rail owned land).

The land is owned by Wirral MBC and is leased to Merseytravel who in turn lease the land to Merseyrail Electrics (the SFO of Birkenhead North station). Additional information: Merseytravel is seeking to procure a suitably qualified Contractor from Contactors for Civils and Highways Works for the construction of an extension to the park and ride facility at Birkenhead North Station.

Merseytravel has an on-going commitment to provide strategic park and ride facilities across Merseyside. The scheme at Birkenhead North is seen as being part of the fulfilment of the commitment.

The scheme has hitherto been developed independently to detailed design stage including the obtaining of Planning Permission (with conditions). The outline proposals for the scheme is as follows: Birkenhead North Proposal is to construct an extended 671 space car park (267 existing + 404 new) on land formerly occupied by housing to the North of the railway.

The existing facility occupies the southern part of the site (immediately north of Station) and was constructed in 2012 when the site was cleared, levelled, and fully enclosed by secure fence. As part of the 2012 scheme, the Phase 2 site was cleared, utility service mains disconnected (former residential road closed) and top soiled / seeded.

The existing operational parking is accessed via a road which crosses the Phase 2 site off Beaufort Road. The works will require excavation to formation, construction of hard standing surface, the necessary marking out, provision of drainage, CCTV and lighting (linked to station), provision of signage within and around the facility.

Existing trees planted on North and West boundaries to be retained within the scheme. Limited works will be carried out on the existing operational site to relocate disabled parking spaces and provide new pedestrian walkways.

All works to be carried out whilst maintaining normal access to and operation of the existing Park & Ride facility. Merseytravel would expect the successful Contactor to implement the schemes in line with the requirements of the Planning Conditions, recommendations made by the Environment Agency and in accordance with the recommendations of CEEQUAL including the production of an evidence file.

It would be the responsibility of the successful Contractor to provide the necessary documentation in relation to, but not limited to, Construction Phase Health and Safety Plans, Site Waste Management Plans, Environmental Plans and the O&M Manuals upon completion. Merseytravel has employed Waterman Consultants to review the existing design information, obtain any outstanding consents and approvals and undertake Contractor Management during the delivery including Site Supervision, CDM-C and Quantity Surveyor services.

Although the scheme is to provide a park and ride site at a railway station, the plot of land on which it is to be created does not lie in rail ownership (though there are interfaces with rail owned land). The land is owned by Wirral MBC and is leased to Merseytravel who in turn lease the land to Merseyrail Electrics (the SFO of Birkenhead North station).

On-going liability and maintenance responsibility for the completed sites will sit with Merseyrail Electrics. The power for lighting, etc. will be provided from the station supply, and CCTV will be linked back to the station for monitoring and recording. Location is within the Liverpool City Region.

AI AnalysisMembers

Requirements, key tasks and tips for reading this tender — included with Tendarix membership.

Create free account

£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.

Search for tenders
SponsoredEst. 2010
Gladstone & Co AccountantsTax advisers · East Ham, London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Start free trialto open notice

Create an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Contracts Finder

Visit
1

Open the original notice

Click the button below to view this tender on Contracts Finder

2

Find the submission method

Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)

3

Create an account

Register on the eSourcing platform for free — you'll need a company email and DUNS number

4

Download tender documents

Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates

5

Submit your response

Upload completed documents through the portal before the deadline — late bids are automatically rejected

Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.

Buyer Profile

Merseytravel
Typepublic body
Total tenders67
Total spend£383,922,345
View buyer profile

Key Dates

Published

18 November 2016

Submission deadline

25 January 2016

Notice type

award

Source

contracts finder

Similar

Related Tenders

S
Open
730d30e5-f328-4b66-be0e-1313c6b74cc8 · Contract

4 John street, maryport - lintel replacement and rendering

Storm Tempest Ltd
worksNorth WestSME friendly

Replacement of a rotten timber lintel with a new steel or concrete lintel for a property located within a conservation area. To include renewal of lime stucco render to the front e

££20,000 — £30,000
⏱ 5 Nov 2026
Posted · 2d ago25d to apply →
E
Open
109772 · opportunity

Improve framework (capital delivery and planned works)

Echelon Consultancy
worksNorth West

Echelon Consultancy are delighted to be procuring on behalf of Hyde Housing Association a framework for the delivery of Capital and Planned Works. The proposed lots are: Kitchens a

£On request
⏱ 6 Nov 2026
Posted · 5d ago26d to apply →
K
Open
a4fa2eee-a32c-4eab-9712-8d406440b770 · Contract

A66 northern trans pennine project(ntp) - schemes 1, 2 traffic signals package

KIER TRANSPORTATION LIMITED
worksNorth WestSME friendly

Kier Infrastructure are looking to engage experienced and qualified contractors to carry out works pertaining to the Traffic Signals package on the A66 Northern Trans-Pennine schem

££400,000
⏱ 23 Oct 2026
Posted · 6d ago12d to apply →
P
Open
ocds-h6vhtk-077476 · tenderUpdate

Capital works and associated services dynamic purchasing system

Procurement for Housing Limited
worksNorth West

Procurement for Housing (PfH) wish to establish a dynamic purchasing system (DPS) for the delivery of capital works projects and provision of associated services for PfH Members th

£On request
Posted · 3w agoView details →