The project entails the replacement of existing Condenser Water pipework system with new. This pipework runs from the Ground to the 30th floor of Guy’s Tower.
The project will need to be undertaken in two phases to ensure that cooling is available to the site at all times to the Hospital. The existing Condenser Water pipework provides the heat rejection for the existing Daikin Applied centrifugal chillers consisting of two 1.7 MW packaged centrifugal chillers reference 1A/1B (System 1) and one 3.4 MW packaged centrifugal chiller reference 2 (System 2) located within the Ground floor plantroom adjacent the main hospital entrance.
The existing system is designed to allow for one system to operate at any one time, not two systems. Therefore, only one system can be worked on at any one time.
Additional details
A Condenser Water bypass is to be installed within the Ground Floor plantroom. This is to allow for example system 1 chiller to operate with system 2 system, and vice versa. The project is currently at stage 4 and estimates a 52-week construction phase.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Oander
£37,000
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Oxford Nanopore Technologies PLC
£14m
total awarded
- 2
DRLC LTD
2 contracts wonlatest 1 Sept 2026ends 9 Aug 2031£438,750
total awarded
- 3
Storm Building Limited
2 contracts wonlatest 4 Aug 2026£586,000
total awarded
- 4
Golden Thread Fire Delay Ltd
2 contracts wonlatest 13 Jul 2026£1m
total awarded
- 5
Power Electrics
2 contracts wonlatest 5 May 2026£200,000
total awarded
Oxford Nanopore Technologies PLC is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Guy's and St Thomas' NHS Foundation TrustKey Dates
Published
25 September 2025
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Provision of smoking cessation service.
As part of our commitment to transparent and inclusive commissioning, we are conducting a Market Engagement Exercise to better understand the capacity, interest, and innovation wit
Delivery of the uk-ireland youth forum 2027
Provision of services for the design, delivery and evaluation of the UK-Ireland Youth Forum 2027, including participant engagement, programme development, event management, safegua
ET89NFE92026 - inclusive leadership and governance training programme
Sustainable societal change requires institutions, communities and leaders that are equipped to work collectively to address complex social, governance and development challenges.
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia