System operational · UK & EU tenders
closed
JUL642370 · Contract notice

Compartmentation & Dehumidification / Toffee Production Project

O.P. CHOCOLATE LIMITED

Estimated Value

Up to £78,305

Deadline

14 August 2026

Published

29 July 2026

Type

Not specified

Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)GB

Overview

EXECUTIVE SUMMARY This business plan sets out a strategic capital investment to modernise and optimise toffee manufacturing operations at our confectionery facility in Merthyr Tydfil, supported through funding from the Welsh Government Food Business Accelerator Scheme (FBAS). The business manufactures a broad range of confectionery products, including wafers, chocolate-coated wafers and biscuits, mallow-based products, and toffee confectionery.

Operations are supported by six enrobing lines, two moulding lines, one mallow production line, and one toffee production line, currently operating across two production shifts per day, with night shifts dedicated to maintenance, sanitation, and preparation activities. Despite a strong market position and established customer base, the business’s growth is currently constrained by unreliable toffee manufacturing equipment, high levels of unplanned downtime (26.93%), and inadequate environmental control systems.

These limitations restrict production capacity, reduce operational efficiency, and necessitate seasonal shutdowns of up to nine weeks per annum. As a result, the business is unable to fully meet existing customer demand or pursue new commercial opportunities.

Additional details

The proposed investment directly addresses these constraints and will transform the toffee manufacturing operation into a scalable, efficient, and resilient production platform capable of delivering sustained year-on-year growth. The investment will deliver a step change in production capacity, increasing throughput from 444 kg/hour to more than 700 kg/hour through the replacement of critical wrapping and depositing equipment.

In parallel, improved environmental control will eliminate seasonal production shutdowns, significantly increasing available annual operating time. These combined improvements will result in a substantial uplift in total output capacity.

Operational reliability will be significantly enhanced through the reduction of unplanned downtime and the introduction of modern, high-performance equipment. This will improve production plan attainment, strengthen service levels, and increase customer confidence, supporting both contract retention and expansion.

Enhanced product quality and consistency will be achieved through improved process control, reducing defect rates, customer complaints, and product returns, while strengthening the business’s competitive position in securing new contracts. The investment will also enable a transition from the current operating model of approximately 14 hours per day to a 24-hour, five-day production cycle.

This expansion will maximise asset utilisation, support increased output in line with demand, and create new employment opportunities within the local area. A core outcome of the project is a significant and measurable improvement in productivity.

Increased throughput, reduced downtime, improved labour efficiency, and higher first-time quality will drive a substantial increase in output per hour worked and Gross Value Added (GVA). Waste reduction and improved yield will ensure that a greater proportion of raw materials are converted into saleable product, while enhanced process stability will optimise labour deployment and reduce non-value-adding activities.

The investment will further strengthen the business’s ability to achieve and maintain industry-recognised accreditations, including compliance with the BRCGS Global Food Safety Standard. Improved process control, environmental stability, and traceability will reduce non-conformances, enhance audit performance, and provide a robust platform for continuous improvement and future certification development.

In addition, the project will deliver a meaningful reduction in the carbon intensity of manufacturing operations, supporting the Welsh Government’s transition to a net zero economy. Increased production efficiency will reduce energy consumption per tonne of output, while the replacement of obsolete equipment an

AI Analysis

Get a detailed breakdown of requirements, key tasks, and tips for reading this tender

Search for tenders
SponsoredEst. 2010
Gladstone & Co.Accountants & Tax Advisers · London

Before you bid, buyers check

two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios

Annual accountsCash-flow forecastsManagement accountsCorporation taxVAT & MTDPayroll & RTIBookkeepingCompany formationSelf-assessmentVirtual FDHMRC enquiriesAuto-enrolmentProperty & landlord taxCharity SORP accounts
Get bid-ready — free 30-min call

Actions

Sign up freeto open notice

A free account takes a moment and unlocks the buyer’s own notice, tender documents, fit scoring and the Bid Writer. From 1 September 2026 opening these links becomes £2/month membership.

Open Bid Writer
Built by · Digital studioEst. 2022
Unique
Evolution®

Independent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.

Web DesignSoftware DevelopmentSEO ServicesPromotion
Visit Unique Evolution

How to Apply

Step-by-step submission guide

Closed

Submission Portal

Procurement Portal

1

Open the original notice

Click the button below to view this tender on the official portal

2

Find submission instructions

Look for "How to apply" or "Submission" sections in the notice

3

Register on the portal

Create a free account on the buyer's procurement platform

4

Download tender documents

Download all specifications, templates, and pricing schedules

5

Submit before the deadline

Complete all documents and submit through the portal — do not email unless explicitly instructed

Always check the official notice for the exact submission method and deadline.

Buyer Profile

O.P. CHOCOLATE LIMITED
Typepublic body
RegionCentral Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
Total contracts2
Total spend£1,178,757
View buyer profile

Key Dates

Published

29 July 2026

Submission deadline

14 August 2026

Notice type

Contract notice

Source

sell2wales

Similar

Related Contracts

C
Open
AUG647355 · Contract notice

Cwmbach wetlands pathway project

Cynon Taf Community Housing Group
Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)

Work requirement at Cwmbach Wetlands, Aberdare. 1. Ground preparation for pathways, the formation of a new path (along an existing informal route) and construction and finish of pa

£Up to £100,000
31 Aug 2026
Posted · 2w ago3d left
D
Open
JUL640314 · Prior information notice

Cynllun caffael strategaeth cyflenwad dŵr cwm taf - caffael uniongyrchol i gwsmeriaid (DPC)

Dwr Cymru Cyfyngedig
Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)

Dŵr Cymru (DCWW) yw'r cwmni dŵr a charthffosiaeth mwyaf yng Nghymru a'r chweched mwyaf sy'n gweithredu yng Nghymru a Lloegr. Mae’n gyfrifol am ddarparu dŵr yfed o ansawdd uchel i d

£On request
Posted · 1mo agoView details →
R
Open
JUL636700 · UK4

Residential care services at bronllwyn learning disability residential care home

Rhondda Cynon Taf CBC
Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)

The Council requires a suitable provider to deliver outcome-focused residential care at Bronllwyn Care Home for adults with a learning disability, requiring permanent placement and

£On request
2 Sept 2026
Posted · 1mo ago5d left
G
Open
MAY614504 · Prior information notice

Reconfiguration and refurbishment of tylorstown welfare hall and institute

Greenwood Projects Ltd
Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)

The client is seeking the involvement of a Main Contractor to carry out the transformational re-development of the Grade II listed hall. Steeped in local heritage and civic pride,

£On request
Posted · 3mo agoView details →