CAS-01263-V6G3K8 - MAIN BLOCK 126 – 148 Shepherds Row, Andover, SP10 2QH - Roofline
ASTER GROUP LIMITEDEstimated Value
Up to £107,510
Deadline
Not specified
Published
17 July 2026
Type
Not specified
Overview
Project: Works to both sides of the roof - eaves and ridge repairs to the main pitched roof, works to remove/repair chimneys (to be confirmed by the Astor surveyor following inspection), clean gutters and downpipes and install hedgehog brushes. NB: All roofing work to be carried out by an NFRC accredited contractor & must be able to self-certify via the competent roofing scheme.
As part of the contractor pre-survey, the contractor should identity any soffit and live extractor fan vents which will need to be disconnected and reconnected during works All flats must be checked to see if there are any live gas appliances, wood burning/multi fuel stoves or open fires still in use prior to the removal of any chimney stacks. Evidence shall be provided to the Contract Surveyor who will be able to authorise this phase of work if necessary.
Isolation of flues (priced separately) in line with gas protocols, removals (priced separately) to be discussed and review with client. Aster Surveyor to advise with any blocking up and venting work as the scope of work will need to be agreed with the leaseholder/s or resident/s in advance.
Additional details
Erect tubular steel scaffolding with required lifts to such elevations, including suitable access for removing the shared chimneys and dismantle on completion. All scaffolding to be measured against the face of the building and to include the lift heights for a specific work type and trade.
Allow for repositioning of existing satellite dishes and T.V. aerials subject to survey, including re-instating them and testing the signal both inside and outside of a property. NB: The existing T.V. aerials if live will need to be reinstated inside the loft space once the chimney has been removed.
Allow for Isolation and recommissioning of vertical gas flues in line with Aster’s gas safe guidance notes subject to survey. If applicable and confirmed by the Contract Surveyor: Remove chimney cowls/pots and cement flaunching, including crown, and take down chimney stack to below roof level allowing adequate airflow, make safe by capping off redundant chimney flues in loft space and vent.
All waste materials and debris to be removed from site. Supply and install new structural timber to rafters and ridge sections including noggins to fill in the void left by the chimney stack.
Install felt and tiles to match the general repair specifications below. Strip back the lower rows of roof tiles to the front and back eaves.
Repair/replace any rotten or damaged roofing timbers and replace the original sarking felt with ‘Permavent Apex’ breathable membrane. Install eaves support trays G1281 by Manthorpe, including rafter roll.
Replace ridge with dry fixed ridge system including adequate ventilation, strip back the affected area to allow replacement of existing felt with ‘Permavent Apex’ breathable membrane. Replace any damaged roof tiles - colour to match existing, colour and quantity to be agreed with the Contract Surveyor prior to ordering.
Repoint the verges. All materials to be installed as per manufacturer’s instructions.
Allow for clearing all debris from the eaves and behind the skeiling/sloping ceiling detail, then insulate using a 50-75mm thick PIR insulation board with a foil backing ensuring that an adequate air gap's left for ventilation. Clean out the gutters and downpipes and leave clear and running free.
Install hedgehog brushes to the gutters. The contractor is to leave the properties and surrounding areas etc clean and clear to original condition. Wash down windows, doors, and existing fascia's/soffits on completion to remove dirt & debris caused by roofing works.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
Marden Roofing Limited
£107,510
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
FG Property Services LTD
£457,639
total awarded
- 2
SPR Roofing Contractors Ltd
£215,660
total awarded
- 3
Shield Building Services UK Ltd
£88,995
total awarded
- 4
Active Workplace Group Ltd
£3m
total awarded
- 5
Kendall Kingscott Ltd
2 contracts wonlatest 25 Jun 2026£84,542
total awarded
FG Property Services LTD is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Aster Group LimitedKey Dates
Published
17 July 2026
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
ITT - swindon archive decarbonisation design team (UID 320)
Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage
ITT - mapping training and qualifications for heritage construction trades in england - UID 370
Heritage construction skills are essential for the repair, maintenance, conservation and retrofit of England’s 5.5 million traditional buildings (built pre-1919), but the industry
Onshore wind energy development – northumberland
Forestry Commission invites a development and operating partner with suitable expertise, track record and experience to explore, assess and progress the potential development of wi
Cotswoldsplus local visitor economy data platform to include support and maintenance
CotswoldsPlus Local Visitor Economy Partnership (LVEP) seeks a suitably qualified provider to deliver a data platform that provides an excellent overview of the performance of the
