BRENTFORD TOWERS, GREEN DRAGON LANE External refurbishment and associated works.
London Borough of HounslowEstimated Value
Up to £8,330,815
Deadline
24 January 2018
Published
30 April 2018
Type
works
Full Description
The London Borough of Hounslow wish contractors to carry out the external refurbishment of all of the 6 high rise blocks at the Brentford Towers Estate and which will comprise: -
- the provision of a fully designed access scaffolding and protection to external facades of all elevations to the full height to roof and parapet levels. It is noted that basement areas, ramps, landscaped areas, culverts, drains etc are in the vicinity of the ground levels to each block. Emergency including fire, and safe access for members of the public, contractors, refuse collections etc are to be maintained at all times to the perimeter of the blocks and all existing entrance points to fire exists, bin stores and main entrances at both ground and mezzanine levels.
- the provision of specialist surveys and reports to fully ascertain the condition of all existing concrete surfaces to external wall panels, balconies, parapets, floor constructions, internal wall panels etc. This includes but is not limited to hammer testing, cover meter surveys, carbonation and concrete analysis, penetration testing for corrosion inhibitors, pull out testing for supplementary fixings and inspections of panel joints.
- Additional surveys and reports are also to be undertaken of each tower to fully determine the risk for disproportional collapse in the event of accidental loading, and to agree to what extent structural remedial works will be required. This will include inspections within void and occupied dwellings to undertake opening up works, cover meter surveys and the like as agreed with Employer.
- The full measure of concrete repairs will be undertaken to all existing exposed concrete surfaces to all blocks comprising plain vertically ribbed external wall panels, aggregate faced spandrel panels, in-situ concrete to balcony upstands and soffits, parapets, columns and the like. This will be on the basis of a full Corrosion Management System (SIKA) to BS EN 1504 with the provision on completion of a 15 year works and materials guarantee against future corrosion, concrete degradation and further spalling.
- Post survey works will comprise the preparation of existing surfaces, including high pressure water jetting (noting dry grit blasting will not be permitted), removing areas of cracked and delaminated concrete, the preparation of repair areas, removal of corrosion from exposed reinforcement and the provision of any additional reinforcement, provision of proprietary products for reinforcement protection, bonding primers, concrete repair mortars, spray applied or pelleted Corrosion Management inhibitors, and anti-carbonation protective coatings including all appropriate smoothing coats, pore sealers and primers.
- Structural remedial works may be required to provide additional ties to the existing outer wall panels back to the internal panels, vertical and lateral restraint fixings, trusses and steelwork to restrain wall panels and floor slabs as directed by Building Contr
Requirements
- Structural remedial works may be required to provide additional ties to the existing outer wall panels back to the internal panels, vertical and lateral restraint fixings, trusses and steelwork to restrain wall panels and floor slabs as directed by Building Contr
Site Viewing
- the provision of specialist surveys and reports to fully ascertain the condition of all existing concrete surfaces to external wall panels, balconies, parapets, floor constructions, internal wall panels etc. This includes but is not limited to hammer testing, cover meter surveys, carbonation and concrete analysis, penetration testing for corrosion inhibitors, pull out testing for supplementary fixings and inspections of panel joints.
- Additional surveys and reports are also to be undertaken of each tower to fully determine the risk for disproportional collapse in the event of accidental loading, and to agree to what extent structural remedial works will be required. This will include inspections within void and occupied dwellings to undertake opening up works, cover meter surveys and the like as agreed with Employer.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
London Borough of HounslowKey Dates
Published
30 April 2018
Submission deadline
24 January 2018
Notice type
award
Source
contracts finder
Related Tenders
Stratford park games court refurbishment
This contract is for the refurbishment of the games court at Stratford Park in Newham, London. It is aimed at contractors who can carry out the repair and upgrade of the sports surface and related fittings.
London construction programme general works framework MW25-GW
The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multi
#43028 - IPDR turbostar onboard ETCS fleet fitment contract
The railway industry is entering a transformative era as it transitions from traditional lineside signalling to a digitally enabled network. Network Rail is introducing digital sig
Basildon station 603 platforms renewal - detailed design and build (GRIP 5-8)
c2c Railway Ltd (c2c) holds a 99-year lease from Network Rail for Basildon Station, in which they are responsible for the operation, maintenance and renewal of station assets. Basi