Belfast Stories – Operational assurance review
Belfast City CouncilEstimated Value
Up to £50,000
Deadline
Not specified
Published
22 May 2026
Type
Not specified
Overview
Belfast Stories is a flagship city centre development intended to establish a new anchor destination for Belfast and support the next phase of growth in the city’s visitor and creative economy. Supported by investment from the Belfast Region City Deal and Belfast City Council, the project brings together a high-quality public space, a visitor attraction and a creative hub within a single, integrated destination, designed to increase footfall, extend dwell time and support economic, social and cultural regeneration across the Belfast City Region.
The main visitor exhibition will be made up of four interconnected galleries communicating the spirit of the city. There will be three screen auditoria and there are plans for an indoor studio to showcase locally produced work and international content, reflecting the importance of the screen industries to Belfast’s success – past, present and future.
There will be a creative hub with a range of spaces to support an ever-developing programme of activities through which we will gather and share stories – the ‘story engine’. It will be a place to meet, learn and collaborate and will provide opportunities for participants from Belfast and beyond to get involved.
Additional details
There will be two cafés / food and drink outlets and a small retail offering celebrating and showcasing local produce. The main public spaces will be a central covered courtyard at ground level and a rooftop garden.
Indoor public spaces will also be included at every level in the building. The project funding has been secured, and plans are to open in 2030.
For more information go to www.belfastcity.gov.uk/belfaststories Belfast City Council is undertaking Preliminary Market Engagement in advance of a potential future procurement for specialist consultancy support to undertake an operational readiness review. The anticipated commission is intended to use the current RIBA stage 3 design as the principal reference point against which the assumptions underpinning the business case can be reviewed, challenged and refined.
This is not intended to be a commission to appoint a future operator, nor to prepare a final operator-led business plan. Rather, the purpose is to undertake an independent review to determine whether the assumptions informing the business case are realistic when tested against the practical realities of operating a destination of this scale and complexity based on the current design.
This includes both a review of how the building could be operated when built and if the business is viable based on the assumptions made in the Outline Business Case (OBC) in relation to income and expenditure projections. The Council expects that this commission will require a multidisciplinary team with relevant expertise across cultural and visitor attraction operations, venue and event management, commercial operations, facilities management, business planning and financial modelling.
The project is currently at RIBA stage 3. As the design develops, the Council requires assurance that Belfast Stories: - Can be operated effectively in practice - Aligns with the needs of future operator(s) - Reflects realistic operational requirements and constraints - Can be operated as a viable business The proposed commission will bring relevant experts together to: - Review the operability of the RIBA stage 3 design including but not limited to the schedule of accommodation, adjacencies and sizes and equipment specification - Review the proposed visitor journeys / experiences including flows, capacities and dwell times across the site - Test how the building would operate in practice - Review the relevant OBC assumptions in relation to income and expenditure projections including but not restricted to: Income o admissions / ticket sales o pricing assumptions o attendance assumptions o event income o food and beverage income o commercial income Expenditure o staffing o utilities o maintenance o facilities management o technical operations o programming assumptions o renewals The output is an integrated report that covers the points above with recommendations to be taken forward by the Belfast Stories Team and future operator(s).
The report will inform both design development at RIBA stage 4, future operator procurement and the Full Business Case. There are several key documents that will be available to the successful contractor team to inform this review including but not limited to: RIBA stage 3 designs, indicative Operator Financial Model including staffing model, People Movement Study, Visitor Experience Demand Analysis.
The report is to be completed by end September 2026. At this stage, the Council is seeking preliminary market feedback on the realism, appropriateness and deliverability of this potential commission.
The Council would anticipate engagement by the commissioned team with the Belfast Stories Project Team during the commission. This could including review sessions or workshops to test emerging findings and ensure alignment with the evolving design and business case development.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
MayWe Events Ltd
3 contracts wonlatest 27 Apr 2026ends 11 Feb 2027£1m
total awarded
- 2
Ashton Community Trust
2 contracts wonlatest 2 Oct 2026ends 18 Oct 2028£853,000
total awarded
- 3
Extern Northern Ireland
2 contracts wonlatest 2 Oct 2026ends 18 Oct 2028£240,000
total awarded
- 4
GEMS NI Ltd
2 contracts wonlatest 2 Oct 2026ends 18 Oct 2028£224,497
total awarded
- 5
The Northern Ireland Childminding Association
2 contracts wonlatest 2 Oct 2026ends 18 Oct 2028£140,000
total awarded
MayWe Events Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Belfast City CouncilKey Dates
Published
22 May 2026
Submission deadline
Not specified
Notice type
planning
Source
find a tender
Related Tenders
The supply and delivery of biomass wood pellets to locations within armagh city, banbridge and craigavon borough area.
This contract is for the “Supply and Delivery of Biomass Wood Pellets” which must be certified quality class ENplus A1 standard. The Contract will run from the date stated in the a
T26-132ENV long wheel base executive saloon car contract lease
Derry City and Strabane District Council invite tenders for the provision under a 48-month Contract-Hire agreement of 1 no. New Hybrid Petrol Long Wheelbase Executive Limousine Sal
RFQ 2026/41 - regeneration and economic development strategy 2027 - 2030
Newry, Mourne and Down District Council “Council” is the third largest Council in Northern Ireland. It is strategically located on the Dublin/Belfast economic corridor, the distric
Milewater operations building development
BHC is seeking expressions of interest from the contractors who are interested in tendering for the construction of a proposed three-storey extension to the existing Operations Eng
