Barbican Windows & Roof Repairs – Design Consultant
The Mayor and Commonalty and Citizens of the City of LondonEstimated Value
Up to £4,000,000
Deadline
Not specified
Published
15 January 2026
Type
Not specified
Full Description
The Barbican Estate was designed by architects Chamberlin, Powell and Bon and was constructed between 1965 and 1976 and consists of over 2000 flats in 21 Blocks. The predominant typologies of the Estate are Tower blocks, terraced blocks and Crescent. The construction of the blocks is predominantly concrete with hardwood windows. The estate was listed in 2001. All repairs must comply with the Barbican Listed Building Management Guidelines.
It is intended that the commission for a design consultant which will be split into two projects with the overall goal of ensuring that the properties are waterproof for twenty years following completion of the works. One project will be for window repairs across all top floor properties on the Estate undertaken in one phase, and the other will be roof renewals, drainage repairs / renewals / redesign and balcony waterproofing renewal works undertaken over 4 phases, anticipated to last 6 years. All roof coverings are at or close to the end of serviceable life. The current estimated construction cost of the works is £40m.
It is anticipated the consultant role will include but not be limited to
- Carry out site surveys of all roofs, balconies, rainwater drainage and top floor windows.
- Produce material for any consultations with leaseholders about the projects. Attend consultations as necessary.
- Produce technical specification for works.
- Apply for all necessary statutory consents including Building Safety Regulator Approvals.
- Prepare contractual documentation for tender purposes.
- Act as Contract Administrator, Principal Designer and Building Regulations Principal Designer.
- Prepare pre-construction information pack for issue with tender documents.
- Review tender pack with ourselves and make any amendments as necessary.
- Answer any technical queries from contractors during tender process.
- Undertake tender analysis including price, technical, contractual assessments.
- Attend post tender meetings with contractors.
- Provide technical input in finalising of contract with chosen contractor.
- Attend all necessary meetings including pre-start and progress meetings.
- Review and comment on contractor drawings.
- Overview project through to completion and handover, allowing for sufficient attendance to accurately record any variations from the specification which will be necessary during the window repairs project.
- Witness testing on completion.
- Review and sign off O&Ms.
The PME questionnaire can be found on our Jaggaer portal
via the https://cityoflondon.ukp.app.jaggaer.com/
pqq_38
Please complete the PMEQ and submit via the portal (pqq_38) by the deadline of 29/01/26 14:00.
Requirements
The Barbican Estate was designed by architects Chamberlin, Powell and Bon and was constructed between 1965 and 1976 and consists of over 2000 flats in 21 Blocks. The predominant typologies of the Estate are Tower blocks, terraced blocks and Crescent. The construction of the blocks is predominantly concrete with hardwood windows. The estate was listed in 2001. All repairs must comply with the Barbican Listed Building Management Guidelines.
- Produce technical specification for works.
- Overview project through to completion and handover, allowing for sufficient attendance to accurately record any variations from the specification which will be necessary during the window repairs project.
Related Links
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
Softcat Ltd
£1m
total awarded
- 2
Ove Arup & Partners Ltd
5 contracts wonlatest 31 Jul 2026£39,420
total awarded
- 3
NorthSouth Consultants Ltd
£54,730
total awarded
- 4
Stace LLP
5 contracts wonlatest 12 Feb 2026£326,336
total awarded
- 5
BM Coaches & Rental Ltd
5 contracts wonlatest 29 Sept 2025£76,608
total awarded
Softcat Ltd is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
The Mayor and Commonalty and Citizens of the City of LondonKey Dates
Published
15 January 2026
Submission deadline
Not specified
Notice type
planning
Source
find a tender
Related Tenders
Delivery of the uk-ireland youth forum 2027
Provision of services for the design, delivery and evaluation of the UK-Ireland Youth Forum 2027, including participant engagement, programme development, event management, safegua
ET89NFE92026 - inclusive leadership and governance training programme
Sustainable societal change requires institutions, communities and leaders that are equipped to work collectively to address complex social, governance and development challenges.
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in england
Decadal scale net sediment budget and geomorphic change analysis of SSSI dune systems in England.It is intended that changes in dune field sediment volume and spatio-temporal varia
NHSE1114 sunderland APMS - CP
North of England Commissioning Support (NECS) is a commissioning support service working for and on behalf of NHS North East and North Cumbria Integrated Care Board (ICB) (NENC ICB
