Avalon House Refurbishment & Extension Works - Scrutton Street, London
Portsmouth City CouncilEstimated Value
Up to £8,900,000
Deadline
6 March 2026
Published
19 December 2025
Type
Not specified
Full Description
Portsmouth City Council - the 'Council' - is inviting applications from suitably qualified & experienced contractors to take part in a procurement process which a contract which will award a contract for the refurbishment and extension of an existing office building at 57-63 Scrutton Street, London EC2A, delivering high-quality Cat A workspace with improved amenity and sustainability performance.
The property is situated on Scrutton Street, Hackney, within the Shoreditch commercial district. The site is fully built-out, with party-wall boundaries to both sides and constrained logistics typical of central London projects. Neighbour access and coordination will be required for façade and roof-level works.
The works comprise
- Comprehensive refurbishment of existing structure and services.
- One-storey rooftop extension to create additional office accommodation and an accessible terrace.
- Basement reconfiguration for new plant, cycle parking, lockers and showers.
- Full replacement of façades, glazing, and entrance canopy.
- Delivery of a fully electric, BREEAM Excellent-targeted building in line with Part L 2021 and London Plan policies.
- Retention and localised strengthening of the existing steel frame and raft foundation.
- New composite-deck structure at roof level with green/blue roof and screened plant zone.
- Installation of twin 8-person MRL lifts serving all floors including the roof terrace.
- HVRF heating/cooling, MVHR ventilation and air-source hot-water generation.
- PV array at roof level and smart metering/BMS integration.
- Cat A internal finishes and reception enhancements.
- Associated drainage, waterproofing and external works.
The scope of the contractor appointment will include for post RIBA 4 design responsibilities although it should be noted that the Council will not be making its design team available for novation. The contract will be let using the JCT Design & Build Contract 2024 - subject to project specific client amendments and amendments required for compliance with the Procurement Act 23.
The estimated value of the contract is approx. £8.9M (excluding VAT) based upon cost plan estimates against the current design which is currently developed to RIBA Stage 2. The Council has undertaken pre-app discussions with the planning authority and is targeting to have submitted a full planning application in early 2026. The Council will progress design to RIBA Stage 4 at which point it will seek submission of lump sum tenders.
The Council is targeting to have awarded the contract by 4th September 2026 with start on site targeted for commencement on 4th December 2026 and completion of works targeted for completion on 30th November 2027 after which a 12-month contractual defects liability period will apply. These target dates are indicative and could be impacted if there are any significant delays in obtaining planning permission.
The Council will undertake the procurement process to award the contract in line with the procurement procedure and programme outlined below which utilises the Competitive Flexible Procedure as defined within the Procurement Act 23.
- Tender Notice & 1st Stage CFP PSQ Documents issued - 19th December 2025
- Clarification deadline - 26th January 2026 @23:59
- 1st Stage CFP PSQ submission deadline - 6th February 2026 @12:00
- Shortlisting confirmation - 20th February 2026
- ECI input sought from shortlisted contractors - March - April 2026
- 2nd stage CFP ITT issued - 27th May 2026
- 2nd stage CFP ITT clarification deadline - 29th June 2026 @23:59
- 2nd stage CFP ITT submission deadline - 7th July 2026 @12:00
- Issue of Assessment Summaries - 17th August 2026
- Issue of Contract Award Notice - 17th August 2026
- Standstill begins - 18th August 2026
- Standstill ends - 28th August 2026
- Contract award - 4th September 2026
The Council will administrate this procurement process using it's e-sourcing solution In-tend which is accessible free of charge via:
https://in-tendhost.co.uk/portsmouthcc/aspx/Home
The system will be used to administrate the procurement process, including for
- Access to and issue of procurement information & documentation
- Pre-tender submission clarification requests and response
- Tender submission
- Tender opening & access to responses
- Post-tender submission clarification requests and response
- Issue of evaluation and award decision notifications
- Publication of summary contract register information in accordance with Local Government Transparency Code (2015) requirements
Suppliers who are not already registered on the In-tend system will need to register their details in order to access the procurement documentation, raise clarification requests and return tender submissions.
The detailed KPIs and scoring methodology will also be detailed within the 2nd stage procurement documents. The KPIs will include for and develop upon the high-level structure set out below:
- PRE-CONSTRUCTION & MOBILISATION PHASE:
- Health & Safety Plan
- Supply Chain & Sub-Contractor Appointments
- Supply Chain & Sub-Contractor Payment Performance
- Cost Management Plan
- Programme Management Plan
- Environmental Management Plan
- Considerate Contractors Scheme Accreditation
- Quality Management Plan
- Agreed Reporting Structure
- Risk Management Plan
- CONSTRUCTION & PRACTICAL COMPLETION PHASE:
- Programme Management & Milestone Delivery
- Cost Management & Delivery to Contracted Sum
- Reporting, Forecasting & Early Warnings
- Communications & Response
- Health & Safety Management
- Environmental Management & Achievement of BREEAM Excellent
- Sub-contractor & Supply Chain Management
- Supply Chain & Sub-Contractor Payment Performance
- Minimising Disruption as per Considerate Contractors Scheme requirements
- Risk Management
- Quality Management & Snagging
- Site Logistics, Security & Access
- As-built information, O&M and Asset Data
- POST PRACTICAL COMPLETION & DEFECTS MANAGEMENT PHASE:
- Provision of final O&Ms, H&S file, Warranties, etc.
- Defects Number, Type & Severity
- Defects Response
- Defects Attendance
- Defects Rectification
- Recurring Defects
- Resolving neighbour / stakeholder issues due to defect impacts
- Environmental Performance of Asset to BREEAM Excellent standards
As required under the Procurement Act 23, the Council will publish a Contract Performance Notice at the key delivery points stated above which summarises delivery performance against the finalised KPIs.
The Council will work in partnership with the appointed contractor and will review KPI performance with the contractor at regular intervals. The Council will seek to agree KPI scores with the contractor prior to issue of a Contract Performance Notice and will provide the contractor with details of scores and rationale at least 8 working days prior to issue of the notice to allow for pre-issue representations.
In the event of significant non-performance, such as significant persistent performance issues where reasonable opportunity has been provided to the contractor to address but has failed to do so, application of significant damages or other significant penalties, termination (including partial termination) of the contract or the reaching of a settlement agreement between the parties, the Council will be required to issue a Performance Notice within 30 days of the breach in accordance with Section 71 of the Procurement Act 23.
The Council will provide notice to the Contractor promptly following the breach notifying of intention to issue a Contract Performance Notice on basis of poor performance, the date on which the notice will be issued, the content of the notice and provide the Contactor with at least 8 working days in which to make representations prior to issue. Further details of what would constitute significant non-performance in relation to this contract will be provided within the stage 2 procurement documents.
The Council may also be required to publish Contract Change Notices in the event of significant changes to the scope, value, duration, etc. to the contract.
Where such changes can be defined as non-substantial (10% position change in duration, non-material change to scope, material change of economic balance in favour of Contractor) and / or cumulatively fall below the relevant thresholds (15% of the contract value for works contracts) the Council will not be obliged to issue a Contract Change Notice and / or publish a modified redacted version of the contract within 90 days of the modification.
If a modification cannot be defined as non-substantial and / or below threshold, the Council may still make modifications to the contract, not exceeding 50% of the latest contract value per modification, in respect the following situations:
- Where the modification was transparently and unambiguously allowed for within the contract
- Materialisation of a published known risk
- Urgency & the protection of life
- Unforeseeable circumstances which could not have been reasonably foreseen by the Council
- Additional goods, works & services which are a repetition of items already covered within the scope of the contract and only where a change of contractor would significantly impact compatibility and result in significant in duplication of costs
In such instances the Council will be required to issue a Contract Change Notice each time a modification is made and publish an updated redacted version of the contract within 90 days of the modification.
The Council may also decide to include for a pro-active voluntary 8 working day standstill period from issuing a Contract Change Notice to subsequent modification of the contract in order to mitigate risk of challenge, although it will be under no legal obligation to do so.
Requirements
The property is situated on Scrutton Street, Hackney, within the Shoreditch commercial district. The site is fully built-out, with party-wall boundaries to both sides and constrained logistics typical of central London projects. Neighbour access and coordination will be required for façade and roof-level works.
The scope of the contractor appointment will include for post RIBA 4 design responsibilities although it should be noted that the Council will not be making its design team available for novation. The contract will be let using the JCT Design & Build Contract 2024 - subject to project specific client amendments and amendments required for compliance with the Procurement Act 23.
As required under the Procurement Act 23, the Council will publish a Contract Performance Notice at the key delivery points stated above which summarises delivery performance against the finalised KPIs.
In the event of significant non-performance, such as significant persistent performance issues where reasonable opportunity has been provided to the contractor to address but has failed to do so, application of significant damages or other significant penalties, termination (including partial termination) of the contract or the reaching of a settlement agreement between the parties, the Council will be required to issue a Performance Notice within 30 days of the breach in accordance with Section 71 of the Procurement Act 23.
The Council may also be required to publish Contract Change Notices in the event of significant changes to the scope, value, duration, etc. to the contract.
In such instances the Council will be required to issue a Contract Change Notice each time a modification is made and publish an updated redacted version of the contract within 90 days of the modification.
Submission Instructions
The estimated value of the contract is approx. £8.9M (excluding VAT) based upon cost plan estimates against the current design which is currently developed to RIBA Stage 2. The Council has undertaken pre-app discussions with the planning authority and is targeting to have submitted a full planning application in early 2026. The Council will progress design to RIBA Stage 4 at which point it will seek submission of lump sum tenders.
- 1st Stage CFP PSQ submission deadline - 6th February 2026 @12:00
- 2nd stage CFP ITT submission deadline - 7th July 2026 @12:00
Related Links
Contact Information
The Council will provide notice to the Contractor promptly following the breach notifying of intention to issue a Contract Performance Notice on basis of poor performance, the date on which the notice will be issued, the content of the notice and provide the Contactor with at least 8 working days in which to make representations prior to issue. Further details of what would constitute significant non-performance in relation to this contract will be provided within the stage 2 procurement documents.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
KIWI & YUZU LTD
- 2
HTP Apprenticeship College LTD
- 3
RIDGE AND PARTNERS LLP
£122,612
total awarded
- 4
YTKO LIMITED
- 5
FAREPORT TRAINING ORGANISATION LIMITED
KIWI & YUZU LTD is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
Portsmouth City CouncilKey Dates
Published
19 December 2025
Submission deadline
6 March 2026
Notice type
tender
Source
find a tender
Related Tenders
Women's health hub for berkshire west (reading, wokingham and west berkshire)
NHS Thames Valley Integrated Care Board (the Commissioner) has completed a Most Suitable Provider process in accordance with the Health Care Services (Provider Selection Regime) Re
Ubiquity FPV training
Procurement of a scalable, affordable, non-energetic FPV training capability to deliver increased training mass under the RAPSTONE programme. A competitive procurement will be used
Design AND build contractor FOR THE delivery OF 192 NEW houses AND apartments AT kings copse avenue development, eastleigh, hampshire.
Eastleigh Borough Council (the Authority) is seeking to appoint an expert Main Contractor to undertake the design & build of 192 new mixed tenure homes in Botley, Eastleigh, Hampsh
Waste collection and disposal services (general, recycling, glass and food waste)
Hampshire and Isle of Wight Healthcare NHS Foundation Trust is seeking to appoint a single provider to deliver a waste management service for the collection, transportation, recycl