Automated People Mover (APM) Infrastructure
High Speed Two (HS2) LimitedEstimated Value
Up to £154,000,000
Deadline
Not specified
Published
26 May 2026
Type
Not specified
Overview
The HS2 Phase One route is from London Euston to the West Midlands and includes the development of high-speed rail stations at London Euston, London Old Oak Common, Birmingham Interchange and Birmingham Curzon Street.The proposed HS2 Birmingham Interchange Station will be situated approximately 20 km to the southeast of Birmingham city centre, close to Birmingham Airport. An Automated People Mover (APM) is required to transport passengers from adjacent areas to the Interchange Station and the wider HS2 network.
The APM network will consist of a maintenance facility and four stops detailed herein: I. Interchange Station stop; II.
National Exhibition Centre stop; III. Birmingham International Railway Station stop; and IV.
Additional details
Birmingham Airport stop. The APM has been designed as an elevated mass transit system, which will transport passengers between those stops detailed above.
The APM route will consist of a 2.3km long viaduct, four stops and a maintenance facility. The Interchange Station Stop is at ground level and the three other stops and maintenance facility are on the viaduct (above ground level).
The route has several major crossings to navigate, such as the M42 motorway, the West Coast Main Line (WCML) and Pendigo Lake at the National Exhibition Centre (NEC) site. The key design features of the APM Infrastructure include reinforced central concrete piers, weathered steel deck and escape walkway gratings throughout the entirety of the track.
To minimise impact to the existing developed site and public roads, the entire 2.3km route is on an elevated viaduct. This is made up of a range of single and twin track at various points along the route to allow trains to pass each other.The piers range from 6 metres high to 14 metres, depending on the topography along the route.
In order to maintain a consistent level for the viaduct, the columns will need to vary in height. The stops at Birmingham Airport and at Interchange Station will have a single platform face and the intermediate stops at the NEC and Birmingham International Railway Station have two platform faces.
The platforms vary from 36m to 40m long and all platforms are fully covered with canopies and have step free access. The APM Infrastructure scope includes the detailed design and delivery of all piers, viaducts, APM stops, the APM maintenance facility as well as temporary works.
The APM Infrastructure Contractor will be the Principal Contractor for the works and will be responsible for managing the APM Systems Contractor as well as nominated HS2 Contractors during these works. The APM Infrastructure Contractor will be responsible for managing all the interfaces and access for the works. Further details on interfacing contractors will be provided in the Tender documentation for the APM Infrastructure procurement.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
CONTRUENT LIMITED
£778,344
total awarded
CONTRUENT LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
High Speed Two (HS2) LimitedKey Dates
Published
26 May 2026
Submission deadline
Not specified
Notice type
planningUpdate
Source
find a tender
Related Tenders
The friary multi-storey car park refurbishment
Lichfield District Council has a requirement for repairs to an existing multi storey parking facility and incorporates works to the fire protection of the existing steelwork; elect
University hospitals birmingham data cabling and passive infrastructure services
The Authority is seeking to appoint a Supplier to provide maintenance, support, supply, break/fix and relocation services for its IT and Estates passive cabling infrastructure, inc
Bereavement counselling
This is a Provider Selection Regime (PSR) intention to award notice. The awarding of this contract is subject to the Health Care Services (Provider Selection Regime) Regulations 20
Provision of a mental health crisis cafe and counselling
This is a Provider Selection Regime (PSR) intention to award notice. The awarding of this contract is subject to the Health Care Services (Provider Selection Regime) Regulations 20
