Assessment of Hitachi-GE Allocation of Function for the UK ABWR
DEPARTMENT FOR WORK AND PENSIONSEstimated Value
£31,447 – £0
Deadline
14 June 2015
Published
10 July 2015
Type
Not specified
Overview
1.1 In January 2014 ONR formally started Step 2 of the GDA of Hitachi General Electric’s (Hitachi-GE) UK Advanced Boiling Water Reactor (UK ABWR). Hitachi-GE is the Requesting Party for the UK ABWR GDA (referred to as “the RP” in this specification). 1.2 Step 2 concluded in August 2014 and involved an overview of the acceptability, in accordance with the regulatory regime of Great Britain, of the design fundamentals, including review of key nuclear safety and nuclear security claims with the aim of identifying any fundamental safety or security shortfalls that could prevent the issue of a Design Acceptance Confirmation (DAC) (see http://www.onr.org.uk/new-reactors/ngn03.pdf). 1.3 During Step 2, ONR reviewed the key claims (assertions) put forward by the RP in the area of Human Factors (HF).
Some of these claims relate to the adequacy of Allocation of Function (AoF) for the UK ABWR. ONR’s technical assessment reports covering the assessment work done during Step 2 and key conclusions are published on ONR’s website (http://www.onr.org.uk/new-reactors/uk-abwr/reports.htm). 1.4 During Steps 3 and 4 of GDA ONR will undertake assessments that will increase in detail as GDA progresses, to confirm that the claims are supported by adequate arguments (reasoning) and evidence.
ONR started Step 3 on 1 September 2014 and expects to complete it at the end of August 2015. 1.5 During Step 4, ONR will assess the evidence by conducting in-depth reviews, on a sampling basis, of the HF aspects of the UK ABWR safety case and supporting analyses, to confirm that the claims and arguments are underpinned by robust evidence. ONR expects to start Step 4 of GDA on 1 September 2015 and complete it at the end of 2017. 1.6 In the HF topic area, AoF may be considered one of the most important activities in the design of the new plant.
Additional details
ONR recognises this significance via the Safety Assessment Principle (SAP) EHF.2 which requires that: “When designing systems, dependence on human action to maintain and recover a stable, safe state should be minimised. The allocation of safety actions between humans and engineered structures, systems or components should be substantiated.” 1.7 Automation will be the general concept of operations for the UK ABWR, which will utilise advanced computerised technology extensively, particularly in the Main Control Room (MCR) and to a much greater extent than for current UK nuclear power plants.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Department For Work and PensionsKey Dates
Published
10 July 2015
Submission deadline
14 June 2015
Notice type
award
Source
contracts finder
Related Tenders
Provision of research into organics treatment capacity in scotland reference
Zero Waste Scotland invites you to tender for the provision of services to assess the impact of the changes proposed to food waste collections through the draft statutory Code of P
Embedding disability competence in emergency preparedness protocols
The Scottish Government wants to hire a partner to create, test and deliver guidance and training that makes emergency preparedness inclusive for people with disabilities across Scotland’s resilience system.
Post office branch - halesworth
Post Office Ltd is looking for a successful retailer to incorporate a Post Office Main into their existing or proposed business. The offer available in this Post Office would be: P
Post office branch - totley rise
Post Office Ltd is looking for a successful retailer to incorporate a Post Office Local into their existing or proposed business. The offer available in this Post Office would be:
