Air Quality, Noise and Vibration Monitoring Services - Old Oak Common (S4) Station - HS2
Balfour Beatty VINCI Systra JVEstimated Value
£101,000 – £150,000
Deadline
20 December 2019
Published
12 December 2019
Type
works
Full Description
This opportunity is for the Specialist Air Quality Noise and Vibration Consultancy Services package on the Old Oak Common Station HS2 project.
Suppliers interested in this opportunity should be advised that the following (non-exhaustive) list of tasks will fall under the remit of the successful tenderer.
This will be developed and clarified through the Invitation to Tender to be submitted to shortlisted suppliers.
Project Management
- Project Management, including developing and maintaining a programme of Air quality, noise and vibration activities / deliverables over the duration of the contract for project planning purposes
Provisional Acoustic Specifications
- Preparation of a preliminary acoustic specifications for: early works and ongoing project activities; Batching plant, Bentonite plant and other proposed mobile plant
- Preparation for and attendance at meetings with BBVS and Hs2 Environment Team representative and/or Air Quality / Noise Specialist
- Provide an early indication on whether BBMV proposals exceed Hs2's envisaged air quality, noise and vibration impact and mitigation (for internal risk management purposes);
- Review received documentation, prepare technical notes as appropriate and provision of guidance on impacts to BBVS senior management team.
Baseline Air quality, Noise and Vibration Data
- Review Hs2 and EWC baseline air quality, noise and vibration monitoring conducted to date;
- Where applicable, set-out additional monitoring requirements and justification;
- Notify Hs2 of any additional baseline air quality, noise / vibration monitoring required
'Pre-construction Information'
- Assist Environment Manager and construction team to compile suitable documentation
- for early Section 61 derogation process for early works, surveys and other construction activities;
- Preparation for and attendance at early meetings with Local Planning Authorities to negotiate derogation;
Update Overall Construction air quality, Noise and Vibration Assessments
Preparation of Input to Section 61 Consents (in line with Control of Pollution Act Section 61 Strategy) Including:
- Prepare, submit and manage Section 61 application(s) to cover scope of works agreed with LPAs (e.g. first 3 months, and then every 6 months thereafter) at each site, using calculations completed for overall assessment, and updated where necessary;
Other Deliverables
- Prepare air quality / noise and vibration input to the relevant environmental control plans
- Design and specify air quality, construction noise and vibration monitoring and reporting strategy for discussion with Hs2and LPAs;
- Prepare Work Package Plan for construction air quality, noise and vibration monitoring during works
Forseeable ad-hoc activities are likely to include
- Input to BBVS programming and reporting;
- Undertake additional / supplementary baseline air quality noise and vibration monitoring (for risk management purposes or at request of LPAs);
- Undertake Section 61 / BPM training for BBVS site teams;
- Preparation for and attendance at meetings with BBVS, LPAs and/or Hs2;
- Prepare for and attendance at stakeholder meetings ( i.e tenants/owners of Special Case );
- Ad-hoc advice / technical notes as required;
- Input to s61 dispensations / variations / overruns as required;
- Sourcing of suitable noise and vibration monitoring equipment on behalf of BBVS
- Implementation of construction air quality, noise and vibration monitoring strategy;
- Provision of monitoring equipment, undertake monitoring / reporting / s61 compliance reports as required; and
- Prepare subsequent s61 applications for follow-on works;
- On-site BPM audits; and
- Complaint investigations and BBVS representation at subsequent formal or informal hearings.
Respondents to this opportunity should be advised that shortlisted applicants will be invited to tender through an external ERP system.
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity.
In 2018, Balfour Beatty, VINCI and Systra (BBVS) created a strategic alliance to deliver major infrastructure projects for HS2, in particular the Terminus at Old Oak Common.
Requirements
Provisional Acoustic Specifications
- Preparation of a preliminary acoustic specifications for: early works and ongoing project activities; Batching plant, Bentonite plant and other proposed mobile plant
- Notify Hs2 of any additional baseline air quality, noise / vibration monitoring required
- Ad-hoc advice / technical notes as required;
- Input to s61 dispensations / variations / overruns as required;
- Provision of monitoring equipment, undertake monitoring / reporting / s61 compliance reports as required; and
The exact scoring criteria are currently being developed by BBVS, and shortlisted suppliers will be invited to register for the ERP system in due course.
What is clear at this stage is that tenders will be scored competitively across a range of criteria, such as, but not limited to: Commercial, Programme, Methodology, HSEQ, Capability and Capacity.
Submission Instructions
This will be developed and clarified through the Invitation to Tender to be submitted to shortlisted suppliers.
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Contracts Finder
Open the original notice
Click the button below to view this tender on Contracts Finder
Find the submission method
Look for "How to apply" section — most tenders link to an eSourcing platform (e.g. In-Tend, ProContract, Jaggaer)
Create an account
Register on the eSourcing platform for free — you'll need a company email and DUNS number
Download tender documents
Download the ITT (Invitation to Tender), specification, pricing schedule, and any templates
Submit your response
Upload completed documents through the portal before the deadline — late bids are automatically rejected
Most buyers do NOT accept email submissions. You must submit through their eSourcing platform. Check the notice for the exact link.
Buyer Profile
Balfour Beatty VINCI Systra JVKey Dates
Published
12 December 2019
Submission deadline
20 December 2019
Notice type
award
Source
contracts finder
Related Tenders
Stratford park games court refurbishment
This contract is for the refurbishment of the games court at Stratford Park in Newham, London. It is aimed at contractors who can carry out the repair and upgrade of the sports surface and related fittings.
London construction programme general works framework MW25-GW
The London Construction Programme (LCP) on behalf of Haringey Council is procuring a new general works framework. The scope of works will include a wide range of works across multi
#43028 - IPDR turbostar onboard ETCS fleet fitment contract
The railway industry is entering a transformative era as it transitions from traditional lineside signalling to a digitally enabled network. Network Rail is introducing digital sig
Basildon station 603 platforms renewal - detailed design and build (GRIP 5-8)
c2c Railway Ltd (c2c) holds a 99-year lease from Network Rail for Basildon Station, in which they are responsible for the operation, maintenance and renewal of station assets. Basi