Air Pollution Recovery Indicators - Assessing potential indicators of recovery from air pollution through monitoring air quality and ecological parameters at Skipwith Common SAC
JNCC SUPPORT COEstimated Value
Up to £116,666
Deadline
Not specified
Published
5 December 2025
Type
Not specified
Details
- Project Aims
- • Assess whether there has been ecological recovery at Skipwith Common SAC following the closure of nearby coal-fired power stations, by monitoring air quality, vegetation, and soil parameters. • Replicate and enhance previous surveys (from 2011 and 2014) to detect changes in atmospheric pollutants (NH₃, SO₂, NOₓ), vegetation communities, and soil chemistry. • Develop robust, repeatable monitoring methods to track recovery indicators and provide a platform for future long-term monitoring. • Generate evidence to inform site management and national policy and provide recommendations for extending recovery assessments to other sites. Project Background The Large Plant Combustion Directive (LPCD), introduced by the European Union, aimed to reduce air pollution from large combustion plants by setting limits on emissions of sulphur dioxide (SO₂), nitrogen oxides (NOₓ), and particulate matter. As part of compliance, UK power stations were required to monitor ecological impacts at nearby Natura 2000 sites. UKCEH conducted a four-year monitoring programme (2011-2015) across seven sites, including Skipwith Common in North Yorkshire, which was notably affected by emissions from three nearby coal-fired power stations: Drax, Eggborough, and Ferrybridge. See figure1. Skipwith Common National Nature Reserve (NNR) spans 270 hectares was selected for its representative heathland vegetation, minimal land management, and proximity to existing monitoring infrastructure. The original study involved air quality measurements, vegetation surveys, and soil analyses. With the closure of the three power stations and reduced pollution levels suggested by regional data, this contract seeks to revisit the site to assess signs of ecological recovery. This includes evaluating changes in air quality, vegetation composition, and soil chemistry, building on the baseline data collected over a decade ago. Figure 1: Location of Skipwith Common (red point) and the three former coal-powered power stations (yellow points) This contract forms part of the Air Pollution Recovery Indicators programme of work. Project Objectives To meet the overall aims of this project (Section 0), the objectives are: To assess whether Skipwith Common SAC shows signs of ecological recovery from air pollution following the closure of nearby coal-fired power stations, by replicating and enhancing previous air quality, vegetation, and soil monitoring surveys. Project Objectives: Detailed Tasks Contractors are welcome to suggest their own sample placements, numbers and analysis. The below is just a suggestion based on previous work. • 12 months of air quality, vegetation, and soil monitoring at Skipwith Common SAC to detect signs of ecological recovery following the closure of nearby power stations. I. This could include monitoring of concentrations of NH₃, SO₂, and NOₓ (at least 10 locations) II. Utilise existing monitoring and data where possible e.g. wet deposition. III. Re-survey the original 50 quadrats (2x2 m) within the 1-hectare area using the same methodology as in 2011 and 2014 and record species presence and abundance to detect changes since 2014. IV. Estimate of soil chemistry across the site e.g. pH, nutrients and base cations V. Set up monthly soil solution sampling at 2 depths e.g. 15cm and 30cm and analyse for acid anions, base cations, pH, DOC, ammonium, phosphate, and conductivity. • Deploy a multi-parameter weather sensor to measure temperature, humidity, wind speed/direction, and pressure. • Install a solar radiation sensor to support dry deposition modelling. • Replicate and enhance previous surveys to enable direct comparison of current and past air pollution and ecological data. Compare 2025 findings with 2011 and 2014 data. • Develop and validate robust indicators and methodologies for tracking recovery from air pollution in heathland habitats. • Provide evidence and recommendations to inform site management, national policy, and potential extension of monitoring to other sites Potential Follow-On Work Bidders should be aware that there is the potential for the successful bidder to be requested by JNCC to undertake additional work on this contract into the financial year 2026/27. This could be for follow on work at other Energy Supply Industry sites (ESI's) subject to funding post March 2026. Please note however that the potential for additional work to be undertaken is subject to a continuing need, availability of funds and satisfactory contractor performance. For the avoidance of doubt, no guarantee can be given that you will be asked to undertake the potential additional work outlined within this SoW document. Bidders are not asked to provide detailed project plans for these follow-on aspects at this stage. Outputs • A detailed report comparing current (2025) air quality, vegetation, and soil data with baseline surveys from 2011 and 2014. • Assessment of ecological recovery indicators and identification of any changes in atmospheric pollutant levels and ecosystem health. • Recommendations and lessons learned for extending similar monitoring and recovery assessments to other sites. • Data and evidence to inform site management, policy decisions, and future monitoring strategies. Product Specification JNCC is committed to making its publicly available resources and documents accessible, in accordance with the Public Sector Bodies (Websites and Mobile Applications) (No. 2) Accessibility Regulations 2018. Making material accessible means making sure it can be used by as many people as possible. This includes those with: impaired vision motor difficulties cognitive impairments or learning disabilities deafness or impaired hearing The outputs and material that JNCC publishes should be compliant with the Web Content Accessibility Guidelines version 2.1 AA standard. To meet this standard, all reports and other documentation which are to be made publicly available must adhere to JNCC's house-style (to be provided) and be produced using a JNCC template (to be provided), unless otherwise stated. (Project managers to note - there are two templates, please decide which is most appropriate, either the 'standard' template rather than the JNCC report template). All reports (draft and final) should be provided electronically via email both as a Microsoft Word document and an Adobe PDF. Copies of documentation associated with case studies should be provided in electronic format with an associated reference catalogue. For any other outputs or products which are to be made publicly available through JNCC, evidence regarding how the accessibility standard will be reached should be included. (Note for author if research project/contract: see EQA Policy Appendix 4 (Communicating Evidence Quality). Ensure that data management and storage requirements are stipulated taking into account relevant policy for data access. See https://jncc.gov.uk/about- jncc/corporate-information/evidence-quality-assurance/ Dissemination (delete if non-applicable) The products/outputs produced under this contract will be a JNCC product and shall not be published or disseminated without the written permission of JNCC. Outputs may at some point be published on the JNCC website and all material supplied as part of this contract shall remain copyright of JNCC. The findings from this contract will also be made available to staff within JNCC, the UK country nature conservation bodies (name them), Defra and (list other parties) Timescale Provisional dates for delivery of the contract outputs are set out below. Exact dates are to be agreed at the start-up meeting based on Contractor and JNCC staff availability. Output Provisional Date Start-up meeting (UK) December 2025 (Exact date TBC) Progress updates Regular meetings to be agreed on project start up Draft/progress report March 2026 Final report with findings Post March 2026 Presentation of the results to stakeholders Post March 2026
Regulations cited
- Accessibility Regulations 2018
AI AnalysisMembers
Requirements, key tasks and tips for reading this tender — included with Tendarix membership.
£4.99/month after a 7-day free trial. Cancel anytime before it ends and you pay nothing.
Award Details
UK CENTRE FOR ECOLOGY & HYDROLOGY
£116,666
Likely incumbents
Suppliers who won similar work from this buyer in the last 5 years.
- 1
JAMES HUTTON LIMITED
£55,381
total awarded
- 2
UNIVERSITY OF ST ANDREWS CONSULTING SERVICES LTD
£54,167
total awarded
- 3
Oxidian Limited
£40,993
total awarded
- 4
IUCN, International Union for Conservation of Nature and Natural Resources
2 contracts wonlatest 10 Sept 2025£104,823
total awarded
- 5
NATIONAL OCEANOGRAPHY CENTRE INNOVATIONS LIMITED
£320,000
total awarded
JAMES HUTTON LIMITED is the most likely incumbent based on recency and category match. To win, bidders typically need a clearly differentiated proposition or a price advantage.
Before you bid, buyers check
two years of filed accountsyour financial standingturnover vs contract valueyour Companies House recordcash flow for 30-day termscredit scores and ratios
Actions
Start free trialto open noticeCreate an account and start a 7-day free trial to open the buyer’s own notice and tender documents, plus fit scoring and the Bid Writer. Then £4.99/month — cancel anytime.
Open Bid WriterIndependent software, web & cloud studio. We design, build and grow digital products that quietly outlast their category.
How to Apply
Step-by-step submission guide
Submission Portal
Find a Tender
Open the original notice
Click the button below to view the full notice on Find a Tender Service (FTS)
Check the procedure type
The "Procedure" section tells you if it's Open (one stage) or Restricted (SQ then ITT). This changes how you apply
Access the eSourcing portal
FTS notices link to the buyer's eSourcing platform — register there to access documents
Complete the Selection Questionnaire
Higher-value contracts often require an SQ first — this pre-qualifies you before the full bid stage
Submit electronically
Upload your completed response through the eSourcing platform before the closing date and time
FTS contracts are above UK procurement thresholds. Late submissions are strictly rejected — submit at least 24 hours before the deadline to avoid portal issues.
Buyer Profile
JNCC SUPPORT COKey Dates
Published
5 December 2025
Submission deadline
Not specified
Notice type
award
Source
find a tender
Related Tenders
Gorleston cliffs play area improvement works
To provide redesign, refurbishment and installation of new play equipment and ancillary items and works at Gorleston Cliffs Play Area Gorleston Cliffs Play Area, Marine Parade, Gor
Improvements to martham playing field play area
To provide redesign, refurbishment and installation of new play equipment and ancillary items and works at Martham Playing Field Play Area Martham Playing Field Play Area, Playing
Supply & delivery of various city & guilds training courses & certification
Invitation to Tender for Supply & Delivery of various City & Guilds Training Courses & Certification. Apply via the in-tend procurement portal: https://supplier.in-tend
Sworders field children's playground inclusive play unit
Bishop's Stortford Town Council is seeking a contractor to fully manage the supply/installation of one large inclusive Play Unit to include a half pipe slide with pull ropes, low c
